BLACK SPOT PROGRAM
285 Dr McFETRIDGE (Morphett) (23 October 2007).
1. What has been South Australia's allocation under the Federal Road Safety Black Spot Program since 2001-02 and what was the expenditure by the South Australian Government during this time?
2. With respect to each project under this program:
(a) what was the year of application;
(b) which road intersection or location was addressed;
(c) what was the treatment for the black spot;
(d) what was the funding for each project; and
(e) what was the region, council or department receiving the funding?
The Hon. P.F. CONLON (Elder—Minister for Transport, Minister for Infrastructure, Minister for Energy): I provide the following information:
The Australian Government funded AusLink Black Spot programme is administered by the Commonwealth Department for Transport and Regional Services (DOTARS). State road transport agencies develop the annual programmes and coordinate delivery of approved projects within each state. In South Australia this role is undertaken by the Department for Transport, Energy and Infrastructure (DTEI).
Allocations are progressively paid directly to the state, based on the actual project expenditures reported to DOTARS and the State is responsible for distributing project funds against each approved project. In answer to the above questions I provide the following:
South Australia's annual allocation under this program is currently $3.49 million. This allocation is managed on a rolling basis where funding is allocated to projects until they are completed. The total allocation to South Australia from 2001-02 to the end of 2007-08 has been $24.34 million. Project expenditure to the end of 2006-07 was $20.36 million with some projects to be completed in 2007-08.
The state government does not contribute funds to the AusLink Black Spot programme. South Australia established its own State Black Spot Programme in July 2002 to address safety infrastructure improvements on both state arterial roads and council roads at known or high risk crash locations. The state program has an allocation of $7.2 million for 2007-08 and projects are prioritised on the basis of relative safety benefit to the community. Since 2002-03 $33 million has been allocated to black spot road safety improvements under the State Black Spot program.
The details of each project under this programme since 2001-02 as requested are provided in the attached table.
National AusLink Black Spot Program | |||||
Year | Road 1 | Road 2—Location Description | Treatment | Funding$ | Organisation |
2001-02 | Rundle St | College Rd | Improve sight lines—median | 39,998 | DTEI, Metro Region |
2001-02 | Hutt St | Flinders St | Installation of traffic signals including mast arms | 60,000 | Adelaide City Council |
2001-02 | Mooringe Ave | Morphett to Marion | Improve site distance, parking, St lighting and access points | 11,390 | City of West Torrens |
2001-02 | Princes Highway | Glencoe-Kongorong | Staggered cross intersection | 173,000 | District Council of Wattle Range |
2001-02 | Footner Rd | Harris St | Flashing lights & boom gates—lighting | 200,000 | Port Augusta City Council |
2001-02 | Exhibition Rd | From Alexandrina Rd To Hutchinson St & Hampden Rd | Non skid surface—delineation—edge lines—parking—pedestrian refuge | 39,000 | District Council of Mount Barker |
2001-02 | Mount Barker-Flaxley Rd | Seal shoulders—widen pavement—guard fence | 143,728 | DTEI, Metro Region | |
2001-02 | Adelaide-Mannum | Seal shoulders—widen—guard fence—speed signs—curve alignment | 150,716 | DTEI, Metro Region | |
2001-02 | Main Rd North | Shoulder sealing—audio tactile edge line | 180,920 | DTEI, Mid North Region | |
2001-02 | Adelaide-Mannum | Seal shoulders—widen—guard fence—speed signs—curve alignment | 171,600 | DTEI, Metro Region | |
2001-02 | Adelaide-Mannum | Seal shoulders—widen—guard fence—speed signs—curve alignment | 148,980 | DTEI, Metro Region | |
2001-02 | Lochiel-Clare | Seal widening—edge lines—delineation | 111,184 | DTEI, Mid North Region | |
2001-02 | Adelaide Rd | Druids Ave | Traffic signals—right & left turn lanes | 220,000 | District Council of Mount Barker |
2001-02 | Lincoln Highway | Upgrade and seal shoulders | 50,000 | DTEI, Northern & Western Region | |
2001-02 | Seppeltsfield Rd | Stonewell Rd | Staggered T layout | 185,000 | Light Regional Council |
2001-02 | Overway Bridge Rd | 12th St—15th St & Ryde St | Crash barriers—improve kerbing—signage—delineation—lighting | 69,000 | Town of Gawler |
2001-02 | James Melrose Rd—Warren Ave | Morphett-Tapleys Hill Rd | Improve site distance—signage—parking—street lights—access pits | 35,555 | City of West Torrens |
2001-02 | Waterloo Corner Rd | Bolivar Rd | Modify roundabout—blister islands | 65,453 | DTEI, Metro Region |
2001-02 | Hiltaban-Iron Knob | Remove vegetation & cutting on crest and curve after crest | 26,801 | DTEI, Northern & Western Region | |
2001-02 | Springbank Rd | From Goodwood Rd To Ingrid St | Painted median—bicycle lanes | 18,983 | DTEI, Metro Region |
2001-02 | Greenhill Rd | Unley Rd | Install mast arms | 36,686 | DTEI, Metro Region |
2001-02 | Prospect Rd | From Junction Rd To Regency Rd | Painted median—pedestrian refuges | 55,000 | DTEI, Metro Region |
2001-02 | Marion Rd | Sturt Rd | Install mast arms | 36,748 | DTEI, Metro Region |
2001-02 | Greenhill Rd | Glynburn Rd | Modify approaches & island to two lanes | 128,442 | DTEI, Metro Region |
2001-02 | Goodwood Rd | Cross Rd | Install mast arms | 37,508 | DTEI, Metro Region |
2001-02 | Richmond Rd | From Railway Terrace To Anzac Highway | Ban right turns –protected turning lane | 30,990 | DTEI, Metro Region |
2001-02 | Bagsters Rd | Diment Rd & Langford Rd | Channelisation—closure of crossing traffic—left turn lane | 40,000 | City of Salisbury |
2001-02 | Commercial Rd | Fisher Rd & Kettering Rd | Roundabout modifications | 26,027 | City of Salisbury |
2001-02 | Belair Rd | Angas Rd | Remove left turn slip lane & install entry threshold treatment | 26,257 | City of Mitcham |
2001-02 | David Terrace | From Torrens Rd To Port Rd | Painted median—bicycle lanes—pedestrian refuge | 60,115 | DTEI, Metro Region |
2001-02 | Coventry Rd | Dalkeith Rd | Stagger cross intersection | 184,386 | City of Playford |
2001-02 | Glynburn Rd | From Rosalind St To Greenhill Rd | Painted median—turn bay—marked parking lane—pedestrian refuges | 16,638 | DTEI, Metro Region |
2001-02 | Sixth Ave | John St | Roundabout | 27,000 | City of Marion |
2001-02 | Nelson Rd | Wright Rd | Modify approaches to roundabout | 40,360 | City of Salisbury |
2001-02 | Lipson-Ungarra Rd | Seal 8km of gravel Rd | 200,000 | District Council of Tumby Bay | |
2002-03 | North Terrace | Frome Rd and St | Modify signals –install green arrows on mast arms | 75,100 | Adelaide City Council |
2002-03 | King William Rd And St | North Terrace | Modify signals –install green arrows on mast arms | 52,000 | Adelaide City Council |
2002-03 | North East Rd | 2.1km Section | Guard fence—seal shoulders—edge line | 206,876 | DTEI, Metro Region |
2002-03 | Henley Beach Rd | Military Rd | Modifications to right turn arrangements & cross movements | 153,000 | DTEI, Metro Region |
2002-03 | Gorge Rd | From Ryan To Bermuda | Guard fence—shoulder seal—edge line & remove open drain | 249,918 | DTEI, Metro Region |
2002-03 | Gorge Rd | From Mosely To Stradbroke | Painted median with right turn lane into side Sts | 44,998 | DTEI, Metro Region |
2002-03 | French St | Birdwood St | Roundabout | 109,645 | City of Mitcham |
2002-03 | North East Rd | Sudholz Rd | Install mast arms | 9,954 | DTEI, Metro Region |
2002-03 | Burton Rd | Fairbanks Drive | Mini roundabout | 85,000 | City of Salisbury |
2002-03 | Cashel St | Day Drive | Roundabout | 140,355 | City of Mitcham |
2002-03 | Nelson Rd | Milne Rd | Mini roundabout –additional entry lanes—island approaches & pedestrian refuge | 150,000 | City of Salisbury |
2002-03 | Salisbury Highway | Kings Rd | Install mast arms | 27,138 | DTEI, Metro Region |
2002-03 | Gorge Rd | From Manresa To Ryan | Painted median with right turn lane to side street | 53,563 | DTEI, Metro Region |
2002-03 | Fenden Rd | Saints Rd | Indented right turn island with pavement parking | 60,000 | City of Salisbury |
2002-03 | Kings Rd | Horrie Miller Ave | Install traffic signals | 161,385 | DTEI, Metro Region |
2002-03 | Burton Rd | Whites Rd | Improve approaches to roundabout | 40,000 | City of Salisbury |
2002-03 | Stirling North—Hawker | Install 310 m of guard rail at five hazardous locations with crash history | 31,148 | DTEI, Northern & Western Region | |
2002-03 | Princes Highway | 4km North Of Policeman's Point | Widen seal by 600 mm each side and add edge lines | 59,990 | DTEI, Eastern Region |
2002-03 | Riddoch Highway | 10km South Of Penola | Shoulder sealing | 74,423 | DTEI, Eastern Region |
2002-03 | Meadows—Strathalbyn | 10km North West Of Strathablyn | Install guard rail on curve | 14,288 | DTEI, Eastern Region |
2002-03 | Percy St | Hedley St | Roundabout | 80,000 | City of Mount Gambier |
2002-03 | Robe To Naracoorte | Mt Burr To Lucindale | Install traffic islands to provide perceptual countermeasures | 52,273 | DTEI, Eastern Region |
2002-03 | Main North Rd Rn3160 | Various Sites In Horrocks Pass | Install 850m guard rail at five known hazardous locations with crash history | 85,022 | DTEI, Northern & Western Region |
2002-03 | Hayman Rd | Bethesda Rd | Staggered T intersection | 105,092 | District Council of Mallala |
2002-03 | Lake Terrace East | Lewis Ave | Improve sight on eastern side & offset access Rd to form staggered T junction | 150,000 | City of Mount Gambier |
2002-03 | Myponga—Hindmarsh | Shoulder sealing | 234,600 | DTEI, Eastern Region | |
2002-03 | Waitpingera Rd | Range Rd | Modify Y-junction to conventional T-junction with indented right turn island | 196,831 | City of Victor Harbour |
2002-03 | Wellington Rd | Joyce St | Install safety bar medians and painted right turn lanes | 3,252 | DTEI, Eastern Region |
2002-03 | Pt Wakefield—Yorketown En 4009 | From Port Clinton 2.5km South | Shoulder sealing and delineation improvement | 172,047 | DTEI, Mid North Region |
2002-03 | Pt Broughton—Kadina | 2-5km South Of Pt Broughton | Shoulder sealing and delineation improvement | 252,652 | DTEI, Mid North Region |
2002-03 | Jenkins Terrace | Arthur St (Lankoop Rd) | Convert intersection to stagger T-junction | 173,529 | DTEI, Eastern Region |
2002-03 | Lipson—Ungarra | Seal remaining section of Rd | 200,000 | District Council of Tumby Bay | |
2002-03 | Green Valley Drive | Commencing 480 M West Of Target Hill Rd | Shoulder repair -signing—pavement width at turning locations -pave marks—roundabouts | 150,000 | City of Tea Tree Gully |
2002-03 | One Tree Hill Rd | From Seaview Rd To Falkenburg Rd | Junction realignment—improve sight distances—widen sealed portion of Rd | 300,000 | City of Tea Tree Gully |
2002-03 | Overway Bridge Rd | Widen pavement-install crash barrier beam-guard rails on approaches-lighting & sign | 91,000 | Town of Gawler | |
2002-03 | Commercial St West | Graham & Avery Rds | Traffic signals | 99,562 | City of Mount Gambier |
2003-04 | Vine Vale Rd | Light Pass Rd | Modify intersection including the construction of a turning lane | 114,146 | Barossa Council |
2003-04 | Lake Terrace East | Dohle Rd | Convert to stagger 'T' intersection and improve sight distance | 180,000 | City of Mount Gambier |
2003-04 | North Terrace | Adelaide to Port Augusta Railway | Install active protection at the level crossing | 125,000 | City of Port Augusta |
2003-04 | Hayman Rd & Dawkins Rd | Old Port Wakefield Rd to Boundary Rd | Line marking—signs—road sealing and lighting | 75,337 | District Council of Mallala |
2003-04 | Hallet Rd | Greenhill Rd | Pavement markings—approach angles—pole relocation and curve delineation | 33,000 | City of Burnside |
2003-04 | Beulah Rd | Howard St | Line marking—sight lines—parking—pavement bars and markers | 785 | City of Burnside |
2003-04 | Tutt Ave | Harrow Terrace | Channelising traffic flows—delineation—surface treatment and median refuge | 140,000 | City of Mitcham |
2003-04 | Sheoak Rd | Upper Sturt Rd to council boundary | Driveway links to discourage through traffic and inappropriate vehicle speeds | 120,000 | Adelaide Hills Council |
2003-04 | Seppeltsfield Rd | Dorrien Bridge to Sturt Highway | Widen seal—seal shoulder and improve existing shoulders | 402,000 | Light Regional Council |
2003-04 | Spains Rd | Winzor St | Modify all approaches to roundabout | 40,000 | City of Salisbury |
2003-04 | Burton Rd | Martins Rd | Modify all approaches to roundabout | 58,000 | City of Salisbury |
2003-04 | McIntyre Rd | Nelson Rd | Widen junction—relocate pole and modify pavement markings | 27,000 | City of Salisbury |
2003-04 | Bridge Rd | Wynn Vale Drive | Install left turn lane on bridge and channelisation on Wynn Vale Drive | 120,000 | City of Salisbury |
2003-04 | Waterloo Corner Rd | Winzor St | Widen junction and modify pavement markings | 42,000 | City of Salisbury |
2003-04 | Meadows—Strathalbyn | Seal shoulders & provide guard rail in appropriate locations | 267,472 | DTEI, Eastern Region | |
2003-04 | Mount Barker—Strathalbyn | Widen shoulders | 87,071 | DTEI, Eastern Region | |
2003-04 | Princes Highway | Widen shoulders | 144,442 | DTEI, Eastern Region | |
2003-04 | Stirling—Strathalbyn | Improve delineation—edge marking—raise pavement markers and enhance signs | 24,973 | DTEI, Eastern Region | |
2003-04 | Waterloo Corner Rd | Bagster Rd & Martins Rd | Mast arms—right turn controls and modify lane arrangements | 70,437 | DTEI, Metro Region |
2003-04 | The Golden Way | The Grove Way | Modify radius on left turn slip lanes | 20,143 | DTEI, Metro Region |
2003-04 | South Rd | Anzac Highway | Install mast arms | 20,938 | DTEI, Metro Region |
2003-04 | Marion Rd | Oaklands Rd and Daws Rd | Install mast arms and modify left corner islands | 34,558 | DTEI, Metro Region |
2003-04 | Greenhill Rd | Hutt Rd & George St | Install mast arms | 16,457 | DTEI, Metro Region |
2003-04 | Grand Junction Rd | Ardtornish St | Install left turn slip | 55,760 | DTEI, Metro Region |
2003-04 | South Rd | Grange Rd & Manton St | Install mast arms | 62,232 | DTEI, Metro Region |
2003-04 | Henley Beach Rd | Holbrooks Rd | Install mast arms | 20,391 | DTEI, Metro Region |
2003-04 | South Rd | Flaxmill Rd and Wheatsheaf Rd | Install mast arms | 26,661 | DTEI, Metro Region |
2003-04 | Regency Rd | Churchill Rd | Install mast arms | 37,746 | DTEI, Metro Region |
2003-04 | Greenhill Rd | Glen Osmond Rd | Install mast arms | 40,582 | DTEI, Metro Region |
2003-04 | Golden Grove Rd | Grenfell Rd | Modify left turn slip lane and corner island | 26,271 | DTEI, Metro Region |
2003-04 | North East Rd | Muller Rd, Thistle Ave | Modify left turn slip lane and corner island | 83,543 | DTEI, Metro Region |
2003-04 | Grand Junction Rd | Sudholz Rd | Install mast arms and left turn acceleration lane | 205,275 | DTEI, Metro Region |
2003-04 | Main Rd | Tatachilla Rd, Aldersley, Liddiard & Field St's | Close one Rd and convert to staggered 'T' arrangement | 250,000 | City of Onkaparinga |
2003-04 | Kapunda—Gawler | Widen seal | 251,481 | DTEI, Mid North Region | |
2003-04 | Crystal Brook—Hughes Gap | Warnertown—Jamestown | Improve sight distance by removing portion of embankment and widen seal | 59,593 | DTEI, Mid North Region |
2003-04 | Port Wakefield—Yorketown Rd | Minlaton—Stansbury | Reconstruct curve | 157,757 | DTEI, Mid North Region |
2003-04 | Port Wakefield—Yorketown Rd | RRD 0.1 to 4.3 | Widen seal | 311,991 | DTEI, Mid North Region |
2004-05 | Prospect Rd | Regency to Staples & Marian to Fitzroy | Install painted median with turn lanes & cycle lanes | 99,550 | DTEI, Metro Region |
2004-05 | Marion Rd | Sturt Rd intersection | Install mast arms on north & east approaches & left turn corner islands | 30,955 | DTEI, Metro Region |
2004-05 | OG Rd, | Fourth Ave to Tregoweth Court | Install painted median with turn lanes & parking lanes | 61,323 | DTEI, Metro Region |
2004-05 | Bower Rd | Causeway Rd intersection | Modify & upgrade signals & provide 2 left turn lanes from causeway Rd | 66,500 | DTEI, Metro Region |
2004-05 | Semaphore Rd | Fletcher Rd intersection | 70 degree left turn—sight distance—install solid median—upgrade lighting | 114,751 | DTEI, Metro Region |
2004-05 | Spains Rd | Beverley Drive intersection | Install dedicated left turn—deceleration lane | 84,082 | City of Salisbury |
2004-05 | Magill Rd | Glynburn Rd to St Bernards Rd | Install painted median with turn lanes & parking lanes | 73,474 | DTEI, Metro Region |
2004-05 | Coromandel Parade | Craiglee Drive to Horners Bridge | Install & upgrade guard fences & install CAMS & Reflective Raised Pavement Markers (RRPM) | 90,000 | City of Mitcham |
2004-05 | Bolivar Rd | Liberator Drive intersection | Modify approaches to existing roundabout (did not proceed—planning only) | 12,720 | City of Salisbury |
2004-05 | Robert Rd | Taylor Rd intersection | Upgrade intersection with a staggered t-junction layout | 183,500 | City of Playford |
2004-05 | Mulgundawah & Brinkley Rds | Maurice & Hindmarsh Rds | Change intersection priority install kerbs gutters signage & line marking | 4,403 | Rural City of Murray Bridge |
2004-05 | Tea Tree Gully—Mannum Rd | At Chain of Ponds | Install new guard fence widen pavement shoulder seal | 60,000 | DTEI, Metro Region |
2004-05 | Tea Tree Gully—Mannum Rd | Little Para Rd | Improve—reinforce signs | 23,698 | DTEI, Metro Region |
2004-05 | Hill St | 500m including Kintore, Buxton & Weigal intersections | Line marking to improve delineation & install safety bars | 2,768 | Rural City of Murray Bridge |
2004-05 | Lyndoch—Chain of Ponds Rd | between Checker Hill Rd & Maidstone Rd | Install new guard fence sections & minor shoulder sealing work | 103,050 | DTEI, Metro Region |
2004-05 | Cudlee Creek—Lobethal Rd | 2km south of Langley Rd | Install 4 lengths of guard fence & seal shoulders | 190,393 | DTEI, Metro Region |
2004-05 | Cudlee Creek—Lobethal Rd | South of Berry Hill Rd | Install 4 lengths of guard fence & seal shoulders | 179,000 | DTEI, Metro Region |
2004-05 | Tea Tree Gully—Mannum Rd | 2km Rd Length east of Gumeracha | Install guard fence & seal shoulders | 199,612 | DTEI, Metro Region |
2004-05 | Main North Rd | 7.4km section south of Tarlee | Seal sections of shoulder & install retro reflective pavement markers | 321,296 | DTEI, Mid North Region |
2004-05 | Balhannah—Littlehampton Rd | entire 6km length of Rd | Seal shoulder & install edge line | 603,176 | DTEI, Metro Region |
2004-05 | Tea Tree Gully—Mannum Rd | 1km Rd length west of Gumeracha | Install guard fence & seal shoulders | 208,034 | DTEI, Metro Region |
2004-05 | Blackwood—Goolwa Rd | Gardiner St | Improve signage & minor intersection improvements | 137,317 | DTEI, Eastern Region |
2004-05 | White Hill—Murray Bridge Rd | Le Messurier to Standen Sts | Install painted median scheme | 100,000 | DTEI, Eastern Region |
2004-05 | King William St | Pirie St & Waymouth St | Install centre Rd traffic signal lanterns | 18,006 | Adelaide City Council |
2004-05 | Conyngham St | Greenhill Rd to Flemington St | Improve delineation line marking retro reflective pavement markers & vegetation removal | 28,141 | City of Burnside |
2004-05 | Rochester St | Improve delineation kerbing, signage and line marking. | 6,401 | City of Burnside | |
2004-05 | Strathalbyn—Wellington Rd | Dalveen Rd | Remove vegetation & realign junction to near 90 degrees | 98,247 | Alexandrina Council |
2004-05 | Paxton Rd | Rufous Place Cameron Drive & Clark St | Realign intersection & install kerbing signage & line marking | 11,000 | District Council of Coober Pedy |
2004-05 | Laura—Caltowie Rd | Stone Hut to Caltowie Rd | Realign & reconstruct 4 curves & install signage & guideposts | 104,000 | Northern Area Council |
2004-05 | Nelson Rd | Kesters Rd intersection | Raise vertical profile of Kesters Rd approach | 43,093 | City of Salisbury |
2004-05 | The Parade | Shipsters Rd & Gurrs Rd | Improve delineation & geometry of junctions | 33,071 | City of Burnside |
2004-05 | Brooking St—Hindmarsh Is Bridge | Goolwa & Liverpool Rd | Install roundabout | 300,000 | Alexandrina Council |
2005-06 | Goodwood Rd | Rose Terrace | Modify to allow off peak right turns into Rose Tce but left out only | 40,000 | City of Unley |
2005-06 | North Parade | West St | Install signs line marking & traffic islands on approaches | 1,432 | City of West Torrens |
2005-06 | River Rd | from Main South Rd to New Rd | Install guard fence | 45,000 | Onkaparinga Council |
2005-06 | North East Rd | Reservoir Rd | Remodel signals & extend right turn lane on north east Rd | 178,392 | DTEI, Metro Region |
2005-06 | Golden Grove Rd | Grenfell Rd (West) | Fully control right turns & add second right turn lanes | 152,138 | DTEI, Metro Region |
2005-06 | Reynell Rd | Malbeck Drive (Western End) | Install raised median scheme & install pedestrian fence across bridge | 20,135 | Onkaparinga Council |
2005-06 | States Rd | Richards Drive (Southern End) | Install raised median scheme to protect right turns | 19,446 | Onkaparinga Council |
2005-06 | Sellicks Beach Rd | Justs Rd | Implement staggered t-intersection & install St lighting | 90,000 | Onkaparinga Council |
2005-06 | Noarlunga—Victor Harbor Rd | Main Rd to Old Willunga Hill Rd | Shoulder sealing | 387,969 | DTEI, Metro Region |
2005-06 | Grants Gully Rd | Culvert extensions shoulder sealing & guard fence installation | 351,297 | DTEI, Metro Region | |
2005-06 | Bower Rd | Old Port Rd | Modify left turn slip lane from Old Port Rd | 100,000 | DTEI, Metro Region |
2005-06 | Grand Junction Rd | Fosters Rd | Install additional traffic signal pole & mast arms | 48,625 | DTEI, Metro Region |
2005-06 | Porter St | Dublin St | Implement left turn only lane & amend corner island | 8,999 | DTEI, Northern & Western Region |
2005-06 | Murray Bridge—Wellington Rd | South Terrace | Ban right turns from South Tce & install solid median | 40,000 | DTEI, Eastern Region |
2005-06 | Hawker-Stirling North Rd | near Pichi Richi Pass | Seal shoulders install edge lines & raised pavement markers | 30,000 | DTEI, Northern & Western Region |
2005-06 | White Hill-Murray Bridge Rd | Swanport, Mannum Rd, Bridge St | Remodel signals install mast arms & flashing right turn signs | 81,110 | DTEI, Eastern Region |
2005-06 | Princes Highway | 8km section between Millicent & Tantanoola | Seal shoulders remove roadside hazards improve delineation | 290,000 | DTEI, Eastern Region |
2005-06 | Barossa Valley Rd | 9km Rd section | Install guard fence & remove hazards | 292,799 | DTEI, Mid North Region |
2005-06 | Hawker-Stirling North Rd | 6km section between Quorn & Stirling | Seal shoulders install edge lines & raised pavement markers | 150,000 | DTEI, Northern & Western Region |
2005-06 | Nuriootpa—Angaston Rd | 3.9km section between Nuriootpa & Angaston | Install guard fence improve delineation & signage | 115,169 | DTEI, Mid North Region |
2005-06 | Old Princes Highway | Schenscher Rd & Ferries McDonald Rd | Widen safety bar islands & improve priority signs | 59,000 | Rural City of Murray Bridge |
2005-06 | Kingscote-Penneshaw Rd | 3km section of Rd | Seal shoulders improve delineation & remove roadside hazards | 85,791 | DTEI, Eastern Region |
2005-06 | Commercial St | Anthony St | Install traffic signals | 81,472 | City of Mount Gambier |
2005-06 | Everard Central-Templers Rd | Balaklava-Mallala Rd | Realign Rd to form a simple t-junction | 397,000 | DTEI, Mid North Region |
2005-06 | Main North Rd | 2km section between Melrose & Murray town | Improve delineation seal shoulders & protect hazards | 150,000 | DTEI, Mid North Region |
2005-06 | Dixons Rd | School Rd—Hay Terrace—Atkins Rd | Realignment to form a staggered cross intersection | 95,000 | District Council of Grant |
2005-06 | The Cove Rd | Adjacent Bike Trail from Hallet Cove to Marino Rocks Station | Install approximately 1500 metres of fencing barrier | 51,000 | City of Marion |
2005-06 | Montacute Rd | 5km section east from Campbelltown Council | Install guard fence improve delineation & signage | 180,000 | Adelaide Hills Council |
2006-07 | Ernabella (Pukatja) Rd | from Officer Creek I -S to Pukatja (Ernabella) | Installation of Rd delineation and warning signs | 28,000 | Department of Premier & Cabinet |
2006-07 | Angaston—Birdwood Rd | South of Angaston | Shoulder seal—delineation retro reflective raised pavement markers & edge lines | 220,000 | DTEI, Mid North Region |
2006-07 | Hill St | McShane St | Improve advance warning and delineation on all approaches | 2,000 | Campbelltown City Council |
2006-07 | Vine St | Edward St | Continue median through intersection | 7,500 | Campbelltown City Council |
2006-07 | Hawker—Stirling North Rd | Between Quorn & Stirling North through Pichi Richi Pass | Seal shoulders—install edge lines & audio tactile line marking | 200,000 | DTEI, Northern & Western Region |
2006-07 | Carpenter Rocks Rd | Dixons Rd and Burrungule Rd | Installation of staggered t-type cross intersection | 185,000 | District Council of Grant |
2006-07 | Happy Valley Drive | Windebanks Rd | Modify left turn corner island. | 40,000 | DTEI, Metro Region |
2006-07 | Cox Hill Rd | from Piggott Range Rd and Wheatsheaf Rd | Line marking, treatment of Roadside hazards, guardrail protection and installation of retro reflective raised pavement markers | 200,000 | Onkaparinga Council |
2006-07 | Main South Rd | Bains Rd and O'Sullivan Beach Rd | Control right turn filter movement—extend and install right turn lanes | 220,000 | DTEI, Metro Region |
2006-07 | Hogarth Rd | Goodman Rd | Install left turn lane on Hogarth Rd | 10,000 | City of Playford |
2006-07 | North East Rd | Sudholz Rd | Control right turn filter movement—extend right turn lanes on north east Rd | 200,000 | DTEI, Metro Region |
2006-07 | Berri—Loxton Rd | Seal shoulders—add edge lines and delineation | 130,000 | DTEI, Eastern Region | |
2006-07 | Riddoch Highway | South of Padthaway | Seal shoulders—improve delineation and renew edge lines | 120,000 | DTEI, Eastern Region |
2006-07 | Brighton Rd | Sturt Rd | Modify left turn lane and corner island | 50,000 | DTEI, Metro Region |
2006-07 | Kingscote—Penneshaw Rd | Centenary Ave and Cygnet Rd | Reinforce priority signage and improve delineation | 50,000 | DTEI, Eastern Region |
2006-07 | Two Wells—Gawler Rd | 4.4km section from Maintenance Marker MM8.6 to MM13 | Shoulder seal—delineation with cams & edge lines | 262,000 | DTEI, Mid North Region |
2006-07 | Mallala—Two Wells Rd | North Of Two Wells | Shoulder seal through s-bend and improve delineation | 92,000 | DTEI, Mid North Region |
2006-07 | South Rd | Sturt Rd | Install mast arm—control right turn filter movement-modify island & right turn | 100,000 | DTEI, Metro Region |
2006-07 | Marion Rd | Finniss St | Control right turn filter movement—extend and install right turn lanes | 90,000 | DTEI, Metro Region |
2006-07 | Palmer—Murray Bridge Rd | Seal shoulders—improve delineation and renew edge lines | 270,000 | DTEI, Eastern Region | |
2006-07 | South Rd | Daws Rd | Install mast arms—control right turn filter movement extend right turn lane | 75,000 | DTEI, Metro Region |
2006-07 | Goodwood Rd | Grange Rd and Edward St | Control right turn filter movement—& extend right turn lanes—modify turn radius | 175,000 | DTEI, Metro Region |
2006-07 | Princes Highway | Glencoe—Kongorong Rd | Improve priority—delineation—signage and widen lanes | 70,000 | DTEI, Eastern Region |
2007-08 | King William St | Pennington Terrace | Extend median across Pennington Terrace | 40,000 | Adelaide City Council |
2007-08 | Mt Barker—Strathalbyn Rd | from Treutler Rd to near train line | Install guard rail and delineation at various locations | 130,000 | DTEI, Eastern Region |
2007-08 | Stirling—Strathalbyn Rd | 8km North East of Strathalbyn | Install guard rail and delineation at various locations and seal shoulders | 508,189 | DTEI, Eastern Region |
2007-08 | Williamstown—Birdwood Rd | 4.4km length south of Williamstown | Shoulder sealing—improve delineation—drainage and protect Roadside hazards | 490,000 | DTEI, Mid North Region |
2007-08 | Montacute Rd | St Bernards Rd and Newton Rd | Install mast arms and extend right turn lanes | 60,000 | DTEI, Metro Region |
2007-08 | Hanson Rd | Torrens Rd (Arndale Shopping Centre Entrance) | Change medians to add right turn lane—close median access & modify signals | 60,000 | DTEI, Metro Region |
2007-08 | Kimba—Cleve Rd | 4km section, north of Cleve | Upgrade speed signage and install guideposts and curve alignment markers | 27,000 | DTEI, Northern & Western Region |
2007-08 | Lincoln Highway | 5km section between Boston and North Shields | Seal Shoulder To 1.5m Width | 170,000 | DTEI, Northern & Western Region |
2007-08 | Lincoln Highway | 4km section between Poonindie and North Shields | Seal Shoulder To 1.5m Width | 136,000 | DTEI, Northern & Western Region |
2007-08 | Gawler Rd | Germantown Rd | Realign intersection to create staggered T—upgrade signage and line marking | 177,000 | DTEI, Mid North Region |
2007-08 | Seacombe Rd | Miller St | Install raised median with right turn lane & relocate pedestrian refuge & ramps | 28,000 | City of Marion |
2007-08 | Angaston-Loxton Rd | 4.2km length between Keyneton and Sedan | Install guardrail at hazardous embankment dropoffs | 130,000 | DTEI, Eastern Region |
2007-08 | Mount Pleasant-Walker Flat Rd | 4km length between Mt Pleasant East and Sanderston | Shoulder sealing and delineation (edge lines) | 200,000 | DTEI, Eastern Region |
2007-08 | Haig St | Birdwood St | Install roundabout | 155,000 | City of Mitcham |
2007-08 | Riddoch Highway (Penola Rd) | Wireless Rd | Widen median to allow vehicle to stop while turning | 150,000 | DTEI, Eastern Region |
2007-08 | Fourth Ave | Hookings Terrace | Install a roundabout | 45,000 | City of Port Adelaide Enfield |
2007-08 | Regency Rd | Churchill Rd | Right turn arrow lanterns—lengthen right turn lane and full control right | 100,000 | DTEI, Metro Region |
2007-08 | Ral Ral Ave | Thurk St | Reinforce give way priority—extend kerb—improve delineation & sight distance | 39,000 | DTEI, Eastern Region |
2007-08 | Park Terrace | Commercial Rd | Improve sight lines—left turn lane—upgrade lighting and pedestrian facilities | 150,000 | DTEI, Metro Region |
2007-08 | Montague Rd | Bridge Rd | Additional right turn lane—install mast arms and additional traffic signal | 280,000 | DTEI, Metro Region |
2007-08 | South Terrace | Alfred St | Modify western approach to roundabout—upgrade lighting and signage | 26,000 | City of Salisbury |
2007-08 | Jenkins Ave | McDouall Stuart Ave | Install signage and clear sight lines | 6,000 | City Of Whyalla |
2007-08 | Nicolson Ave | McDouall Stuart Ave | Install signage and clear sight lines | 6,000 | City Of Whyalla |