<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>Legislative Council</name>
  <date date="2014-08-06" />
  <sessionName>Fifty-Third Parliament, First Session (53-1)</sessionName>
  <parliamentNum>53</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>Legislative Council</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="673" />
  <endPage num="762" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Question Time</name>
    <subject>
      <name>Hillside Mine</name>
      <text id="201408061b426d9027114f2780000324">
        <heading>Hillside Mine</heading>
      </text>
      <talker role="member" id="3130" kind="question">
        <name>The Hon. M.C. PARNELL</name>
        <house>Legislative Council</house>
        <questions>
          <question date="2014-08-06">
            <name>Hillside Mine</name>
          </question>
        </questions>
        <startTime time="2014-08-06T14:54:40" />
        <text id="201408061b426d9027114f2780000325">
          <timeStamp time="2014-08-06T14:54:40" />
          <by role="member" id="3130">The Hon. M.C. PARNELL (14:54):</by>  I seek leave to make a brief explanation before asking a question of the Minister for Water and the River Murray about the proposed Hillside mine on Yorke Peninsula.</text>
        <text id="201408061b426d9027114f2780000326">Leave granted.</text>
      </talker>
      <talker role="member" id="3130" kind="question" continued="true">
        <name>The Hon. M.C. PARNELL</name>
        <house>Legislative Council</house>
        <text id="201408061b426d9027114f2780000327">
          <by role="member" id="3130">The Hon. M.C. PARNELL:</by>  Last week, the government announced it had offered a mining lease and associated infrastructure leases to Rex Minerals for its proposed Hillside mine on Yorke Peninsula near Ardrossan. The government's offer is said to be subject to the acceptance of 99 secret conditions. The mine proposal also includes a new water pipeline to carry some two gigalitres of River Murray water each year to the mine for the purpose of washing the ore and attempting to suppress some of the dust, including from the proposed rock stockpiles. My questions of the minister are:</text>
        <text id="201408061b426d9027114f2780000328">1.&amp;#x9;As Minister for Water and the River Murray, were you consulted about this proposal?</text>
        <text id="201408061b426d9027114f2780000329">2.&amp;#x9;Do any of the 99 secret conditions relate to the use of River Murray water?</text>
        <text id="201408061b426d9027114f2780000330">3.&amp;#x9;In the inevitable eventuality of future drought and water restrictions for agriculture, will water to the mine also be restricted?</text>
        <text id="201408061b426d9027114f2780000331">4.&amp;#x9;Does the minister believe that this proposal will be a good use of River Murray water, and what alternative uses for this water were considered?</text>
      </talker>
      <talker role="member" id="3122" kind="answer">
        <name>The Hon. I.K. HUNTER</name>
        <house>Legislative Council</house>
        <electorate id="">Minister for Sustainability, Environment and Conservation, Minister for Water and the River Murray, Minister for Aboriginal Affairs and Reconciliation</electorate>
        <startTime time="2014-08-06T14:56:01" />
        <page num="703" />
        <text id="201408061b426d9027114f2780000332">
          <timeStamp time="2014-08-06T14:56:01" />
          <by role="member" id="3122">The Hon. I.K. HUNTER (Minister for Sustainability, Environment and Conservation, Minister for Water and the River Murray, Minister for Aboriginal Affairs and Reconciliation) (14:56):</by>  I thank the honourable member for his important question. Some of that question relates to another minister in another place, and I will refer those questions to him, but I can say that Rex Minerals made an application pursuant to the Mining Act 1971 for two leases and two licences to develop a copper, gold and magnetite mine near Ardrossan and export ore concentrate via the existing port of Ardrossan.</text>
        <text id="201408061b426d9027114f2780000333">The Hillside mine proposes the extraction of copper, gold and magnetite initially through an open-cut pit with later mining occurring underground, I am advised. I understand that an open-cut pit approximately 2.4 kilometres long and one kilometre wide and 450 metres deep would be created under the current planning. Unwanted rock overlying the ore bodies is proposed to be stored on site with tailings being stored in a facility within the largest waste rock stockpile. Initial processing of the ores would occur on site, producing a slurry that will be transferred through a 12-kilometre long pipe to Ardrossan for de-watering and transfer onto ships at the existing port.</text>
        <text id="201408061b426d9027114f2780000334">Rex Minerals submitted a mining lease proposal and management plan to the state government in support of its application. I am advised that the EPA assessed the mining lease proposal and management plan in November 2013 and submitted a response that examined potential impacts under the Environment Protection Act 1993 and Radiation Protection and Control Act 1982. The Department of State Development (formerly the department for manufacturing innovation, trade, resources and energy) has prepared an assessment report for the proposal with input and advice from the EPA.</text>
        <text id="201408061b426d9027114f2780000335">On 28 July 2014, the government offered Rex Minerals a mining lease tenement that imposes, as the honourable member said, a number of conditions to manage any potential impacts. Rex Minerals has, as I understand it, 21 days to consider and respond to the offer and the conditions on which it is made. If Rex Minerals agrees to the conditions imposed by the government and a mining lease is granted, Rex Minerals will be required under the Mining Act to prepare a program for environmental protection and rehabilitation (PEPR) to outline how it will adhere to the conditions included in the offer. The EPA will work with the DSD and Rex Minerals to ensure that the PEPR adequately addresses any issues of environmental concern.</text>
        <text id="201408061b426d9027114f2780000336">In relation to water impacts, I can say that mine de-watering is required for safe working conditions. Groundwater will be extracted, I am advised, from a fractured rock aquifer during the life of the operation. The fractured rock aquifer at the project site is saline, ranging from 10,000 to 50,000 milligrams per litre and, due to elevated salinity, its groundwater use is restricted to industrial use and is unsuitable for agricultural or horticultural purposes in any case. Rex Minerals proposes to use a combination of water sources for all processing.</text>
        <text id="201408061b426d9027114f2780000337">Water sources include approximately three gigalitres per year from groundwater and approximately half a gigalitre per year from the SA Water pipeline. The groundwater component will be sourced from de-watering bores and in-pit sumps at the mine site, is my advice. Groundwater modelling reports indicate that, during the de-watering phase, groundwatering drawdown would be recorded up to about a kilometre away from the site and impacts to third-party groundwater users are not anticipated, I guess, because of the quality of the water and its salinity, as I alluded to earlier.</text>
        <text id="201408061b426d9027114f2780000338">I will take those other questions that the honourable member asked that relate to another minister's portfolio to the minister in the other place and seek a response on his behalf.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>