<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>Legislative Council</name>
  <date date="2012-10-30" />
  <sessionName>Fifty-Second Parliament, Second Session (52-2)</sessionName>
  <parliamentNum>52</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>Legislative Council</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="2425" />
  <endPage num="2490" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Answers to Questions</name>
    <subject>
      <name>Outback Roads</name>
      <text id="201210300e69be8fc2114c7cb0000305">
        <heading>OUTBACK ROADS</heading>
      </text>
      <talker role="member" id="599" kind="question">
        <name>The Hon. J.S.L. DAWKINS</name>
        <house>Legislative Council</house>
        <questions>
          <question date="2012-10-30">
            <name>OUTBACK ROADS</name>
          </question>
        </questions>
        <text id="201210300e69be8fc2114c7cb0000306">In reply to <by role="member" id="599">the Hon. J.S.L. DAWKINS</by> (29 May 2012).</text>
      </talker>
      <talker role="member" id="3122" kind="answer">
        <name>The Hon. I.K. HUNTER</name>
        <house>Legislative Council</house>
        <electorate id="">Minister for Communities and Social Inclusion, Minister for Social Housing, Minister for Disabilities, Minister for Youth, Minister for Volunteers</electorate>
        <questions>
          <question date="2012-10-30">
            <name>OUTBACK ROADS</name>
          </question>
        </questions>
        <text id="201210300e69be8fc2114c7cb0000307">
          <by role="member" id="3122">The Hon. I.K. HUNTER (Minister for Communities and Social Inclusion, Minister for Social Housing, Minister for Disabilities, Minister for Youth, Minister for Volunteers):</by>  The Minister for Transport and Infrastructure has been advised:</text>
        <text id="201210300e69be8fc2114c7cb0000308">The Australian Government and the State Government jointly funded a project with a total allocation of $13.73 million to address issues with the condition of the Strzelecki Track, with the project completed in December 2010.</text>
        <text id="201210300e69be8fc2114c7cb0000309">The Strzelecki Track Upgrade works included:</text>
        <text id="201210300e69be8fc2114c7cb0000310">
          <item sublevel="1" bullet="true">constructing six sealed overtaking opportunities, each approximately seven kilometres in length, significantly reducing the risks associated with vehicles overtaking slower heavy vehicles using the track</item>
        </text>
        <text id="201210300e69be8fc2114c7cb0000311">
          <item sublevel="1" bullet="true">constructing or upgrading of three rest areas and three truck parking bays</item>
        </text>
        <text id="201210300e69be8fc2114c7cb0000312">
          <item sublevel="1" bullet="true">re-sheeting of four sections of road, with a total length of 54 kilometres, to improve the condition of the road surface</item>
        </text>
        <text id="201210300e69be8fc2114c7cb0000313">
          <item sublevel="1" bullet="true">upgrading and stabilisation of three major floodways; and</item>
        </text>
        <text id="201210300e69be8fc2114c7cb0000314">
          <item sublevel="1" bullet="true">upgrading of thirty minor floodways.</item>
        </text>
        <text continued="true" id="201210300e69be8fc2114c7cb0000315">There are no plans to seal any additional sections of the Strzelecki Track at this time.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>