<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>Legislative Council</name>
  <date date="2008-10-30" />
  <sessionName>Fifty-First Parliament, Third Session (51-3)</sessionName>
  <parliamentNum>51</parliamentNum>
  <sessionNum>3</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>Legislative Council</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="507" />
  <endPage num="556" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Answers to Questions</name>
    <subject>
      <name>Field River Valley</name>
      <page num="543" />
      <text id="200810302fdb1ac893f24611a0000493">
        <heading>FIELD RIVER VALLEY</heading>
      </text>
      <talker role="member" id="3164" kind="question">
        <name>The Hon. S.G. WADE</name>
        <house>Legislative Council</house>
        <questions>
          <question date="2008-10-30">
            <name>FIELD RIVER VALLEY</name>
          </question>
        </questions>
        <text id="200810302fdb1ac893f24611a0000494">In reply to <by role="member" id="3164">the Hon. S.G. WADE</by> (17 October 2007).</text>
      </talker>
      <talker role="member" id="1821" kind="answer">
        <name>The Hon. G.E. GAGO</name>
        <house>Legislative Council</house>
        <electorate id="">Minister for State/Local Government Relations, Minister for the Status of Women, Minister for Consumer Affairs, Minister for Government Enterprises, Minister Assisting the Minister for Transport, Infrastructure and Energy</electorate>
        <questions>
          <question date="2008-10-30">
            <name>FIELD RIVER VALLEY</name>
          </question>
        </questions>
        <text id="200810302fdb1ac893f24611a0000495">
          <by role="member" id="1821">The Hon. G.E. GAGO (Minister for State/Local Government Relations, Minister for the Status of Women, Minister for Consumer Affairs, Minister for Government Enterprises, Minister Assisting the Minister for Transport, Infrastructure and Energy):</by>  The Minister for Environment and Conservation has advised:</text>
        <text id="200810302fdb1ac893f24611a0000496">1.&amp;#x9;The draft code of practice for wastewater overflow management is currently in the final stages of consultation with stakeholders, in particular local councils. Consultation of the draft code has already taken place with both SA Water and United Water, and as a result, SA Water has established and begun implementing its 'Preliminary Wastewater Overflow Abatement Plan (Wastewater Networks)' in response to the draft. </text>
        <text id="200810302fdb1ac893f24611a0000497">2.&amp;#x9;The EPA is in close contact with SA Water and United Water and receives and reviews notifications about overflows that enter either a watercourse directly or indirectly, or if the volume is over one megalitre. Consistent with the preliminary wastewater overflow abatement plan, if a particular site has recurring blockages, a regular program of clearing the affected network can be implemented.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>