<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="4.0" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML">
  <name>House of Assembly</name>
  <date date="2025-11-13T11:00:00+10:30" />
  <sessionName>Fifty-Fifth Parliament, First Session (55-1)</sessionName>
  <parliamentNum>55</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="14157" />
  <endPage num="14234" />
  <dateModified time="2025-11-17T12:18:42+10:30" />
  <proceeding continued="true" uid="e6a271d0bb78494dbd0dfb7da9763950">
    <name>Parliamentary Committees</name>
    <subject uid="b54ddafda7384753999c052a5214fbda">
      <name>Public Works Committee: Electrical Infrastructure Upgrades Program</name>
      <text id="202511139115319175b5463380000025">
        <heading>Public Works Committee: Electrical Infrastructure Upgrades Program</heading>
      </text>
      <talker role="member" id="6890" referenceid="26cba13494444aab95a84e3bf90e4042" uid="22a47d42fff54b54a522c23a3468a001" kind="speech">
        <name>Ms SAVVAS</name>
        <house>House of Assembly</house>
        <electorate id="">Newland</electorate>
        <startTime time="2025-11-13T11:09:23+10:30" />
        <text id="202511139115319175b5463380000026">
          <timeStamp time="2025-11-13T11:09:23+10:30" />
          <by role="member" id="6890" referenceid="26cba13494444aab95a84e3bf90e4042" uid="22a47d42fff54b54a522c23a3468a001">Ms SAVVAS (Newland) (11:09):</by>  I move:</text>
        <text id="202511139115319175b5463380000027">
          <inserted>That the 156<sup>th</sup> report of the Public Works Committee, entitled Electrical Infrastructure Upgrades Program—Tranche 1, be noted.</inserted>
        </text>
        <text continued="true" id="202511139115319175b5463380000028">SA Water, the agency, has identified a number of sites where high-voltage switchboards and associated electrical infrastructure have become hazardous and may pose threats to system reliability and maintenance. The Electrical Infrastructure Upgrades Program is designed to enhance safety of site personnel, improve hardware resilience, safeguard system reliability and ensure uninterrupted water supply. The proposed project is the first of two stages and will provide upgrades for the Murray Bridge and Morgan systems.</text>
        <page num="14159" />
        <text id="202511139115319175b5463380000029">The high-voltage switchboards and associated electrical equipment at the identified locations have exceeded their serviceable life span and they present safety risks, particularly those related to arc flash exposure. In an arc flash event, electrical faults cause current flow through the air between two live high-voltage conductors. This can release energy temperatures as high as 20,000°C, leading to severe injuries such as third-degree burns, loss of sight, internal burns, permanent hearing loss and more.</text>
        <text id="202511139115319175b5463380000030">Despite the agency's implementation of stringent access controls and use of maximum-rated PPE, the residual safety risks do remain unacceptable and interim mitigation measures such as upstream isolations are increasingly disruptive to operations and maintenance activities. They no longer represent a reasonable long-term approach to maintaining levels of service within the network.</text>
        <text id="202511139115319175b5463380000031">Site-specific factors, such as asset condition and layout, operational criticality and constructability are being considered within the design and have informed whether full replacement or targeted upgrades are required. The project will construct new switch rooms at Murray Bridge Onkaparinga Pump Station 3, Morgan Whyalla Pipeline Pump Station 1 and Murray Bridge Onkaparinga Pump Station 1. Supporting works will include:</text>
        <text id="202511139115319175b5463380000032">
          <item sublevel="1" bullet="true">new high-voltage switch gear, including associated connections with ElectraNet and SA Power Networks;</item>
        </text>
        <text id="202511139115319175b5463380000033">
          <item sublevel="1" bullet="true">installation of power control and communications cabling with complete support systems;</item>
        </text>
        <text id="202511139115319175b5463380000034">
          <item sublevel="1" bullet="true">remote high-voltage switching panels;</item>
        </text>
        <text id="202511139115319175b5463380000035">
          <item sublevel="1" bullet="true">critical building services including lighting, fire protection, security, arc ducting and earthing;</item>
        </text>
        <text id="202511139115319175b5463380000036">
          <item sublevel="1" bullet="true">enabling civil works; and</item>
        </text>
        <text id="202511139115319175b5463380000037">
          <item sublevel="1" bullet="true">decommissioning and cutover of existing systems.</item>
        </text>
        <text continued="true" id="202511139115319175b5463380000038">The project may require some land acquisition at the Murray Bridge Onkaparinga Pump Station 1 workshop to the levee bank area cable run, as well as Murray Bridge Onkaparinga Station 3 to enable upgrades to a power network transformer. The exact details of land to be acquired will be determined as part of the detailed design phase of the project and any acquisition will be undertaken in accordance with the Land Acquisition Act. The project schedule anticipates construction to be completed at all locations by the end of the third quarter of 2028.</text>
        <text id="202511139115319175b5463380000039">The project is expected to cost $147 million, and the agency does not expect additional operational costs as a result of the project. The operating and capital costs of this project are funded through the 2024 Regulatory Determination and are approved by the Essential Services Commission. The project will, therefore, have no impact on SA Water's overall borrowings or contributions to government.</text>
        <text id="202511139115319175b5463380000040">SA Water has included the delivery of the project within the agency's Wastewater Major Framework Program. Procurement has been conducted in accordance with the agency's policies and procedures and conforms to all applicable Treasury and government policies. The agency uses procurement frameworks and enables the sequential award of work, incentivising suppliers to perform well to ensure continuity of work.</text>
        <text id="202511139115319175b5463380000041">The agency states that this delivers significant efficiency benefits through collaboration, innovation, consistency, planning and programming. Option analysis and concept design was completed by SA Water Engineering and the award of the design and construct package shall be in accordance with SA Water's Delegation of Financial and Procurement Authority, as well as applicable Treasury and government policies.</text>
        <text id="202511139115319175b5463380000042">The project is being managed in accordance with SA Water's Corporate Project Management Methodology by a project manager from the agency's Capital Planning and Delivery Group. The project manager is responsible for the development and delivery of the overall project, including seeking the necessary approvals and management of the selected contractor.</text>
        <page num="14160" />
        <text id="202511139115319175b5463380000043">SA Water has a business management policy and framework which is used to identify risks, determine related impacts and develop mitigation strategies. Potential risks identified include:</text>
        <text id="202511139115319175b5463380000044">
          <item sublevel="1" bullet="true">extended lead times due to external factors;</item>
        </text>
        <text id="202511139115319175b5463380000045">
          <item sublevel="1" bullet="true">delays due to ElectraNet requirements to deliver enabling works (but there has been a stakeholder plan prepared); and</item>
        </text>
        <text id="202511139115319175b5463380000046">
          <item sublevel="1" bullet="true">uncontrollable environmental conditions for which detailed design has included comprehensive site investigations and enabling works to have been planned to complete before winter.</item>
        </text>
        <text continued="true" id="202511139115319175b5463380000047">An environmental control plan has been prepared to ensure the project is delivered in compliance with relevant regulations. The selected contractor will be required to establish a construction environmental management plan outlining the general environmental controls and mitigation measures that will be implemented during project delivery. A site environmental plan will be developed to address site-specific environmental management requirements and associated approval conditions. SA Water will monitor the execution of both plans by means of site inspections and audits.</text>
        <text id="202511139115319175b5463380000048">SA Water states it is reviewing relevant and available information regarding the likelihood of encountering Aboriginal cultural heritage. The design and construct contractor will be required to comply with the agency's standard operating procedure for the discovery of Aboriginal heritage during construction work. Should any Aboriginal sites, objects or remains be found, works will cease immediately, and the contractor should contact an environment and heritage expertise representative.</text>
        <text id="202511139115319175b5463380000049">It is a prerequisite that site employees be familiar with the requirements of these procedures prior to conducting ground disturbance works. Working in flood plain areas of the River Murray may require monitoring pending final design and alignment of the cable run from the workshop to the levee area at Murray Bridge Onkaparinga Pump Station 1. Native title implications are being reviewed for all three locations, with further advice to be sought from the Crown Solicitor's Office. The agency states no local estate heritage is listed within the vicinity of the proposed works alignment.</text>
        <text id="202511139115319175b5463380000050">Internal stakeholders and partner organisations will be kept informed throughout the project life cycle via project progress meetings. SA Water states that the submission has been circulated amongst relevant government departments, and they have indicated support for the project.</text>
        <text id="202511139115319175b5463380000051">The committee examined written and oral evidence in relation to the Electrical Infrastructure Upgrades Program—Tranche 1. Witnesses who appeared were Emma Goldsworthy, Senior Manager from SA Water, and Greg O'Grady, Senior Project Manager for SA Water. I thank the witnesses for their time.</text>
        <text id="202511139115319175b5463380000052">Based on the evidence considered and pursuant to section 12C of the Parliamentary Committees Act 1991, the Public Works Committee reports to parliament that it recommends the proposed public work.</text>
        <text id="202511139115319175b5463380000053">Motion carried.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>