<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="4.0" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML">
  <name>House of Assembly</name>
  <date date="2025-05-15T11:00:00+09:30" />
  <sessionName>Fifty-Fifth Parliament, First Session (55-1)</sessionName>
  <parliamentNum>55</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="12057" />
  <endPage num="12115" />
  <dateModified time="2025-05-16T15:15:31+09:30" />
  <proceeding uid="64184f078a134a4fba45b3937051e110">
    <name>Parliamentary Committees</name>
    <text id="20250515f9d89c23009d46e990000006">
      <heading>Parliamentary Committees</heading>
    </text>
    <subject uid="f869853443f447deabc135e2ee7db189">
      <name>Public Works Committee: Sturt Water Tank Rehabilitation Project</name>
      <text id="20250515f9d89c23009d46e990000007">
        <heading>Public Works Committee: Sturt Water Tank Rehabilitation Project</heading>
      </text>
      <talker role="member" id="6895" referenceid="4f23d8fa24734f75ba02037c1838d19a" uid="46e29511ebf648998d3cfa2ab9daabf0" kind="speech">
        <name>Ms HOOD</name>
        <house>House of Assembly</house>
        <electorate id="">Adelaide</electorate>
        <startTime time="2025-05-15T11:02:36+09:30" />
        <text id="20250515f9d89c23009d46e990000008">
          <timeStamp time="2025-05-15T11:02:36+09:30" />
          <by role="member" id="6895" referenceid="4f23d8fa24734f75ba02037c1838d19a" uid="46e29511ebf648998d3cfa2ab9daabf0">Ms HOOD (Adelaide) (11:02):</by>  I move:</text>
        <text id="20250515f9d89c23009d46e990000009">
          <inserted>That the 134<sup>th</sup> report of the committee, entitled Sturt Water Tank Rehabilitation Project, be noted.</inserted>
        </text>
        <text continued="true" id="20250515f9d89c23009d46e990000010">The subject water storage tank is located approximately eight kilometres south of the Adelaide Central Business District at 960 Marion Road in Sturt. The existing tank is a 65-year-old concrete structure with an approximate capacity of nine million litres. Presently, it serves 86,000 people and is a critical component of the South Adelaide Water Distribution Zone.</text>
        <text id="20250515f9d89c23009d46e990000011">Originally constructed in 1959, recent assessments have uncovered structural defects to the tank, consistent with assets of this age. These defects need to be addressed to reduce the risk of the tank's roof collapsing as well as to prevent accelerated water leakage. The proposed refurbishments aim to support long-term viability as well as sustained delivery of reliable baseline services for existing SA Water customers.</text>
        <text id="20250515f9d89c23009d46e990000012">Two options were assessed to remedy the ageing tank. The first considered rehabilitating the existing tank, extending the asset's life by 40 years. The second involved demolishing the existing tank and constructing a replacement of equivalent size. SA Water has selected the rehabilitation pathway as it presents a cost-effective, sustainable and productive solution, and presents the most favourable net present value. It is also environmentally favourable as there is minimal impact to the existing construction footprint. The option to build a new tank was not preferred as it required significant capital expenditure costs as well as significant challenges to ongoing water supply for customers due to its longer projected construction period.</text>
        <text id="20250515f9d89c23009d46e990000013">The rehabilitation works will replace the tank's roof and associated support structure, rehabilitate the tank's inlet and outlet pipework and concrete structures, including columns, wall and floor, as well as provide a new safe access point to the tank.</text>
        <text id="20250515f9d89c23009d46e990000014">The site is owned by SA Water, and the submission states that there will be no ongoing operational costs. The project is confined predominantly to the existing infrastructure site location; however, communication with relevant stakeholders and landowners will continue throughout the planning and construction phases. Construction is expected to begin by midyear and is anticipated to be complete in early 2026.</text>
        <text id="20250515f9d89c23009d46e990000015">The committee examined written and oral evidence in relation to the Sturt Water Tank Rehabilitation Project. Witnesses who appeared before the committee were Emma Goldsworthy, Acting Senior Manager, Capital Delivery, SA Water; and Ben Muller, Senior Project Manager, SA Water. I thank the witnesses for their time.</text>
        <text id="20250515f9d89c23009d46e990000016">Based upon the evidence considered and pursuant to section 12C of the Parliamentary Committees Act 1991, the Public Works Committee reports to parliament that it recommends the proposed public work.</text>
        <text id="20250515f9d89c23009d46e990000017">Motion carried.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>