<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="4.0" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML">
  <name>House of Assembly</name>
  <date date="2025-03-18T11:00:00+10:30" />
  <sessionName>Fifty-Fifth Parliament, First Session (55-1)</sessionName>
  <parliamentNum>55</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="11303" />
  <endPage num="11364" />
  <dateModified time="2025-03-21T13:04:50+10:30" />
  <proceeding continued="true">
    <name>Grievance Debate</name>
    <subject uid="6f620181523444d98de0eb31422be029">
      <name>Hydrogen Production</name>
      <text id="2025031833d4a352fa6244e3a0000518">
        <heading>Hydrogen Production</heading>
      </text>
      <talker role="member" id="5384" referenceid="facf38f4c95b4f27b86257b48e3f699a" uid="4149506f2f804202a17ec8a2e7318e19" kind="speech">
        <name>Mr PATTERSON</name>
        <house>House of Assembly</house>
        <electorate id="">Morphett</electorate>
        <startTime time="2025-03-18T15:15:41+10:30" />
        <text id="2025031833d4a352fa6244e3a0000519">
          <timeStamp time="2025-03-18T15:15:41+10:30" />
          <by role="member" id="5384" referenceid="facf38f4c95b4f27b86257b48e3f699a" uid="4149506f2f804202a17ec8a2e7318e19">Mr PATTERSON (Morphett) (15:15):</by>  The Premier's flagship hydrogen power generation plan has been deferred, but for how long? South Australians are still in the dark. It might be a number of years before the next naive politician proposes green hydrogen as the solution to cheap electricity, but it is essential that we understand some of the scientific laws and hurdles that this project faced and that no amount of political spin could overcome. This will serve as a cautionary tale for South Australia with its relatively low tax base so that it does not ever again waste hundreds of millions of taxpayer dollars with nothing to show for it.</text>
        <text id="2025031833d4a352fa6244e3a0000520">I graduated from the University of Adelaide with a degree in physics and also a degree in electrical and electronic engineering, so I understand the laws of thermodynamics and conservation of energy, and they act as a detonator that ignites this green hydrogen electricity scheme into a hydrogen bomb.</text>
        <text id="2025031833d4a352fa6244e3a0000521">
          <event kind="interjection" role="member" id="5387" referenceid="e05f224a87834b10abca5a0839ea45b3">Mr Brown interjecting:</event>
        </text>
      </talker>
      <talker kind="speech" role="office">
        <name>The Speaker</name>
        <house>House of Assembly</house>
        <text id="2025031833d4a352fa6244e3a0000522">
          <by role="office">The SPEAKER:</by>  Member for Florey, can you leave the chamber please? See you in 20 minutes.</text>
        <text id="2025031833d4a352fa6244e3a0000523">
          <event>The honourable member for Florey having withdrawn from the chamber:</event>
        </text>
      </talker>
      <talker role="member" id="5384" referenceid="facf38f4c95b4f27b86257b48e3f699a" uid="547afea045d148b7b38a17f4928f2fc5" kind="speech" continued="true">
        <name>Mr PATTERSON</name>
        <house>House of Assembly</house>
        <electorate id="">Morphett</electorate>
        <text id="2025031833d4a352fa6244e3a0000524">
          <by role="member" id="5384" referenceid="facf38f4c95b4f27b86257b48e3f699a" uid="547afea045d148b7b38a17f4928f2fc5">Mr PATTERSON:</by>  In its most basic form, the Premier's so-called Hydrogen Jobs Plan involved converting electricity to hydrogen and then back to electricity. The hydrogen was to be produced by electrolysing water using a 250 megawatt bank of alkaline electrolysers. This technology currently has an efficiency of around 66 per cent, so that means two-thirds of the electrical energy that is then put into the hydrogen is retained, and another third of that energy is lost. Approximately five tonnes of hydrogen are generated hourly by the 250 megawatt electrolysers and were to be stored in a custom-built 100-tonne hydrogen storage facility so that hydrogen could later be used to power the turbines and generate electricity.</text>
        <text id="2025031833d4a352fa6244e3a0000525">The state government raced off and ordered 200 megawatts of GE LM6000VELOX turbines, which are effectively jet engines. These turbines are energy-hungry, requiring 15 tonnes of hydrogen per hour to produce the 200 megawatts of electricity, but they only transfer 40 per cent of the energy stored in the hydrogen back to electricity, with the remaining energy lost to mostly noise and heat. Therefore, the overall efficiency of converting electricity to hydrogen and then back to electricity is about 26 per cent, because 66 per cent of the initial energy going into the hydrogen and, of that, only 40 per cent of the hydrogen energy then is used to convert back to electricity. In other words, it takes four units of electricity to create one unit of green hydrogen electricity.</text>
        <text id="2025031833d4a352fa6244e3a0000526">The time to generate the vast quantities of hydrogen is another barrier because these 250 megawatt electrolysers require three hours, totalling 750 megawatts, to produce the 15 tonnes of hydrogen needed for the LM6000 turbines to generate that 200 megawatts of electricity in an hour, again reinforcing that energy efficiency of 26 per cent. There are other parts of the process that also require electricity such as purification and desalination of water. They also reduce the efficiency further and, staggeringly, the original plan by the Premier was for storage of the hydrogen to be liquid, which means it is stored at negative 240°C in Whyalla. That would have made an inefficient system drastically worse.</text>
        <text id="2025031833d4a352fa6244e3a0000527">Another major issue with the government's plan was the insufficient amount of hydrogen storage of 100 tonnes. The LM6000 gobbles up 15 tonnes of hydrogen per hour when generating at 200 megawatts, so in a wind and solar drought there would only be enough hydrogen to fuel the turbines for 6½ hours before they ran out. This process is very inefficient to produce electricity at an industrial scale. The more inefficient an electricity system is, the costlier it is to supply energy for households and businesses.</text>
        <page num="11340" />
        <text id="2025031833d4a352fa6244e3a0000528">These scientific and technical barriers are why major private companies are walking away from using green hydrogen to generate commercial electricity. Over the last three years, we have seen power bills skyrocket in South Australia while Premier Malinauskas has been concentrating on his hydrogen fantasy. In fact, household bills have jumped by 45 per cent under Premier Malinauskas and are now the highest on record—and now the government has shelved the only energy-related policy they took to the election.</text>
        <text id="2025031833d4a352fa6244e3a0000529">So, in future, when a career politician such as Premier Malinauskas comes re-promising a rebranded green hydrogen hoax, South Australians would be well advised to ask him: does his plan comply with the laws of thermodynamics?</text>
      </talker>
    </subject>
  </proceeding>
</hansard>