<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="4.0" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML">
  <name>House of Assembly</name>
  <date date="2024-06-27T10:30:00+09:30" />
  <sessionName>Fifty-Fifth Parliament, First Session (55-1)</sessionName>
  <parliamentNum>55</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="8501" />
  <endPage num="8566" />
  <dateModified time="2024-07-31T10:36:56+09:30" />
  <proceeding continued="true">
    <name>Question Time</name>
    <subject>
      <name>Integrated System Plan</name>
      <page num="8555" />
      <text id="2024062730ab94b4b9524d99b0000729">
        <heading>Integrated System Plan</heading>
      </text>
      <talker role="member" id="4839" referenceid="14882fc6372144e2bfdbf720df284df1" kind="question">
        <name>Mr HUGHES</name>
        <house>House of Assembly</house>
        <electorate id="">Giles</electorate>
        <questions>
          <question date="2024-06-27T01:00:00+09:30">
            <name>Integrated System Plan</name>
          </question>
        </questions>
        <startTime time="2024-06-27T17:00:43+09:30" />
        <text id="2024062730ab94b4b9524d99b0000730">
          <timeStamp time="2024-06-27T17:00:43+09:30" />
          <by role="member" id="4839" referenceid="14882fc6372144e2bfdbf720df284df1">Mr HUGHES (Giles) (17:00):</by>  My question is to the Minister for Energy and Mining. Can the minister advise the house about any new reports on the transition of the electricity system and possible investments in South Australia?</text>
      </talker>
      <talker role="member" id="633" referenceid="daab39c192204b0f88930f68be57ad22" kind="answer">
        <name>The Hon. A. KOUTSANTONIS</name>
        <house>House of Assembly</house>
        <electorate id="">West Torrens</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Infrastructure and Transport</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Energy and Mining</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2024-06-27T01:00:00+09:30">
            <name>Integrated System Plan</name>
          </question>
        </questions>
        <startTime time="2024-06-27T17:01:00+09:30" />
        <text id="2024062730ab94b4b9524d99b0000731">
          <timeStamp time="2024-06-27T17:01:00+09:30" />
          <by role="member" id="633" referenceid="daab39c192204b0f88930f68be57ad22">The Hon. A. KOUTSANTONIS (West Torrens—Minister for Infrastructure and Transport, Minister for Energy and Mining) (17:01):</by>  I can. I thank the member for Giles for his interest in this matter, which underpins the economy, the amenity of our homes and our contribution to the worldwide campaign to reduce harmful greenhouse gas emissions. That is the important part that the decarbonisation of our electricity system means.</text>
        <text id="2024062730ab94b4b9524d99b0000732">On Wednesday, AEMO published its biennial Integrated System Plan, the ISP. I am pleased to say that the ISP acknowledges a likelihood of increased industrial demand in the Upper Spencer Gulf as the State Prosperity Project unlocks economic opportunities, and that is on the back of decades of electricity demand dropping across Australia. What we are seeing for the first time under this government is industrial demand for power growing. These opportunities include mining projects on Eyre Peninsula and in the eastern flank of the state's Braemar region. There is also expected growth in the Stuart Shelf copper province. At the same time, industrial load on power supply will grow as the state's Green Iron and Steel Strategy develops and decarbonised processes and smelting of a range of minerals increases.</text>
        <text id="2024062730ab94b4b9524d99b0000733">The ISP foreshadows more renewable energy projects coming online in the near future to meet this new industrial demand to strengthen energy supply routes to Adelaide. AEMO says that there is a need to 'alleviate congestion on renewables from the Mid North to the rest of the NEM', therefore it is classified as an 'actionable' project, Electranet's proposal to build a transmission line expansion running approximately between Robertstown and Port Augusta. Being 'actionable' gives Electranet the go ahead to proceed with a Regulatory Investment Test for Transmission, or what most of us would call a detailed business case.</text>
        <text id="2024062730ab94b4b9524d99b0000734">The ISP is not some back-of-the-envelope estimate such as the nuclear fantasy being peddled by members opposite. The ISP is the result of a two-year consultation, analysis and review involving 2,100 stakeholders, 85 presentations and reports, and consideration of 220 formal submissions. The conclusion of the ISP is, and I quote:</text>
        <text id="2024062730ab94b4b9524d99b0000735">
          <inserted>As coal-fired power stations retire, renewable energy connected with transmission and distribution, firmed with storage, and backed up by gas-powered generation is the lowest-cost way to supply electricity to homes and businesses through Australia's transition to a net zero economy.</inserted>
        </text>
        <text continued="true" id="2024062730ab94b4b9524d99b0000736">The debate is over. We are going to choose the lowest cost option to decarbonise, not the most expensive. AEMO's optimal development path requires an estimated capital investment of $122 billion in the NEM—investment in generation, storage, firming, and transmission.</text>
        <text id="2024062730ab94b4b9524d99b0000737">Of course, there are alternatives to AEMO's plans. This is the Australian Energy Market Operator, the experts, but there are alternatives. There is the nuclear option, the option being proposed by those opposite and their colleagues in Canberra who thrive on causing chaos and division. The seven sites picked by the Liberals have had coal-fired generation capacity totalling 7,410 megawatts. If we take the average real-world cost of the most recent nuclear plants in the US, UK, France and Finland, that cost would be $133 billion. That is not anywhere close enough. Their plans do not add up.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>