<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="4.0" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML">
  <name>House of Assembly</name>
  <date date="2023-02-09T11:00:00+10:30" />
  <sessionName>Fifty-Fifth Parliament, First Session (55-1)</sessionName>
  <parliamentNum>55</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="2849" />
  <endPage num="2916" />
  <dateModified time="2023-07-06T08:50:30+09:30" />
  <proceeding continued="true">
    <name>Parliamentary Committees</name>
    <subject>
      <name>Public Works Committee: Truro Bypass</name>
      <text id="20230209114a7b12bf6e464a80000141">
        <heading>Public Works Committee: Truro Bypass</heading>
      </text>
      <talker role="member" id="5387" referenceid="e05f224a87834b10abca5a0839ea45b3" kind="speech">
        <name>Mr BROWN</name>
        <house>House of Assembly</house>
        <electorate id="">Florey</electorate>
        <startTime time="2023-02-09T11:57:30+10:30" />
        <text id="20230209114a7b12bf6e464a80000142">
          <timeStamp time="2023-02-09T11:57:30+10:30" />
          <by role="member" id="5387" referenceid="e05f224a87834b10abca5a0839ea45b3">Mr BROWN (Florey) (11:57):</by>  I move:</text>
        <text id="20230209114a7b12bf6e464a80000143">
          <inserted>That the 19<sup>th</sup> report of the committee, on the Truro Bypass Project, be noted.</inserted>
        </text>
        <text id="20230209114a7b12bf6e464a80000144">The Public Works submission from the Department for Infrastructure and Transport (DIT) proposed to construct a bypass for the Sturt Highway at Truro. The Sturt Highway is a national highway traversing South Australia, New South Wales and Victoria. It is the shortest and highest standard route between Sydney and Adelaide, providing an important link for the transport of passengers and freight between the two cities and adjacent regions.</text>
        <text id="20230209114a7b12bf6e464a80000145">Demand for the Sturt Highway to cater for larger freight vehicles is increasing. Currently an average of 4,500 vehicles per day travel on the highway through the township of Truro, with 30 per cent being road trains and other heavy commercial vehicles. Truro is located approximately 80 kilometres north-east of Adelaide and is the last remaining town between Adelaide and Renmark that has heavy transport and freight travelling through its main street. This congestion harms freight efficiency, increases crash rates, decreases travel speed, reduces amenity and constrains Truro's economic growth. To remedy these issues these public works will divert heavy traffic along the Sturt Highway out of Truro's main street.</text>
        <text id="20230209114a7b12bf6e464a80000146">The proposed scope of work includes: a single lane in each direction, separated by a centre median; the provision of three new overtaking lanes; and the construction of new connections to the new Sturt Highway at several locations. In addition, new drainage structures will be provided, impacted utility services will be relocated and infrastructure enabling stock and machinery movements will be constructed.</text>
        <text id="20230209114a7b12bf6e464a80000147">Key outcomes of the project will be the improved safety of all road users through Truro and the Truro Hills, the increased efficiency of long-distance freight, and the improved liveability of Truro and its surrounds. The Australian and South Australian governments have jointly committed $202 million, split 80/20, towards the design and construction of the bypass. This equates to a state government contribution of $40.4 million. Funding was committed as part of the 2021-22 state and federal budgets.</text>
        <text id="20230209114a7b12bf6e464a80000148">Preliminary design has determined that 20 privately owned properties—four properties owned by the Commissioner of Highways, one property owned by the Minister for Climate, Environment and Water and two properties owned by the Minister for Infrastructure and Transport—need to be partially acquired. There are no residential buildings directly impacted by the proposed acquisition areas. Consultation with affected property owners and property stakeholders has commenced, and land acquisition will be undertaken in accordance with the Land Acquisition Act.</text>
        <text id="20230209114a7b12bf6e464a80000149">The project will require clearance of a combination of native vegetation, amenity vegetation and weeds. Assessments have determined that the project will likely be considered to have a significant impact on Matters of National Environment Significance under the Environment Protection and Biodiversity Conservation Act. It is considered likely that an assessment and approval will be required. Further assessment of the critically endangered threatened ecological communities will be undertaken in parallel to the referral to confirm their condition.</text>
        <page num="2861" />
        <text id="20230209114a7b12bf6e464a80000150">The clearance of native vegetation, protected under the Native Vegetation Act, has been assessed as level 4 impact level, and approval for this will need to be sought from the Native Vegetation Assessment Panel. I seek leave to continue my remarks.</text>
        <text id="20230209114a7b12bf6e464a80000151">Leave granted; debate adjourned.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>