<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="4.0" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML">
  <name>House of Assembly</name>
  <date date="2022-09-06T11:00:00+09:30" />
  <sessionName>Fifty-Fifth Parliament, First Session (55-1)</sessionName>
  <parliamentNum>55</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="1091" />
  <endPage num="1387" />
  <dateModified time="2023-06-02T10:45:58+09:30" />
  <proceeding continued="true">
    <name>Estimates Replies</name>
    <subject>
      <name>Heysen Tunnels</name>
      <text id="20220906c13c602892124c6ea0002058">
        <inserted>
          <heading>Heysen Tunnels</heading>
        </inserted>
      </text>
      <talker role="member" id="5382" referenceid="a772f8900bee436db277192229c352bf" kind="question">
        <name>The Hon. D.R. CREGAN</name>
        <house>House of Assembly</house>
        <electorate id="">Kavel</electorate>
        <questions>
          <question date="2022-09-06T01:30:00+09:30">
            <name>Heysen Tunnels</name>
          </question>
        </questions>
        <text id="20220906c13c602892124c6ea0002059">
          <inserted>In reply to <by role="member" id="5382" referenceid="a772f8900bee436db277192229c352bf">the Hon. D.R. CREGAN (Kavel)</by> ((17 June 2022).).  (Estimates Committee A)</inserted>
        </text>
      </talker>
      <talker role="member" id="633" referenceid="daab39c192204b0f88930f68be57ad22" kind="answer">
        <name>The Hon. A. KOUTSANTONIS</name>
        <house>House of Assembly</house>
        <electorate id="">West Torrens</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Infrastructure and Transport</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Energy and Mining</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2022-09-06T01:30:00+09:30">
            <name>Heysen Tunnels</name>
          </question>
        </questions>
        <text id="20220906c13c602892124c6ea0002060">
          <inserted>
            <by role="member" id="633" referenceid="daab39c192204b0f88930f68be57ad22">The Hon. A. KOUTSANTONIS (West Torrens—Minister for Infrastructure and Transport, Minister for Energy and Mining):</by>  </inserted>
        </text>
        <text continued="true" id="20220906c13c602892124c6ea0002061">
          <inserted>The project scope includes:</inserted>
        </text>
        <text id="20220906c13c602892124c6ea0002062">
          <item sublevel="1" bullet="true">
            <inserted>upgrades to the tunnel lighting system to a newly designed LED configuration;</inserted>
          </item>
        </text>
        <text id="20220906c13c602892124c6ea0002063">
          <item sublevel="1" bullet="true">
            <inserted>installation of a new automated fire suppression system;</inserted>
          </item>
        </text>
        <text id="20220906c13c602892124c6ea0002064">
          <item sublevel="1" bullet="true">
            <inserted>upgrades to the tunnel ventilation system;</inserted>
          </item>
        </text>
        <text id="20220906c13c602892124c6ea0002065">
          <item sublevel="1" bullet="true">
            <inserted>repairs to the tunnel lining and installation of monitoring equipment;</inserted>
          </item>
        </text>
        <text id="20220906c13c602892124c6ea0002066">
          <item sublevel="1" bullet="true">
            <inserted>upgrades to the ITS equipment including thermal incident detection systems, new and replacement closed circuit television (CCTV), electronic variable speed and messaging signage and over height vehicle detection;</inserted>
          </item>
        </text>
        <text id="20220906c13c602892124c6ea0002067">
          <item sublevel="1" bullet="true">
            <inserted>upgrades to the traffic management system to restrict access to the tunnels in the event of an emergency incident; and</inserted>
          </item>
        </text>
        <text id="20220906c13c602892124c6ea0002068">
          <item sublevel="1" bullet="true">
            <inserted>upgrades to the emergency communication systems, including public address, radio rebroadcast, in-tunnel signage and help phones to improve safety and network reliability.</inserted>
          </item>
        </text>
      </talker>
    </subject>
  </proceeding>
</hansard>