<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2021-08-25" />
  <sessionName>Fifty-Fourth Parliament, Second Session (54-2)</sessionName>
  <parliamentNum>54</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="6514" />
  <endPage num="6937" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding>
    <name>Bills</name>
    <text id="202108258a296109c3cf4279b0000832">
      <heading>Bills</heading>
    </text>
    <subject>
      <name>Statutes Amendment (National Energy Laws) (Regulatory Sandboxing) Bill</name>
      <bills>
        <bill id="r4895">
          <name>Statutes Amendment (National Energy Laws) (Regulatory Sandboxing) Bill</name>
        </bill>
      </bills>
      <text id="202108258a296109c3cf4279b0000833">
        <heading>Statutes Amendment (National Energy Laws) (Regulatory Sandboxing) Bill</heading>
      </text>
      <subproceeding>
        <name>Introduction and First Reading</name>
        <text id="202108258a296109c3cf4279b0000834">
          <heading>Introduction and First Reading</heading>
        </text>
        <talker role="member" id="4342" kind="speech">
          <name>The Hon. D.C. VAN HOLST PELLEKAAN</name>
          <house>House of Assembly</house>
          <electorate id="">Stuart</electorate>
          <portfolios>
            <portfolio id="">
              <name>Minister for Energy and Mining</name>
            </portfolio>
          </portfolios>
          <startTime time="2021-08-25T16:04:50" />
          <text id="202108258a296109c3cf4279b0000835">
            <timeStamp time="2021-08-25T16:04:50" />
            <by role="member" id="4342">The Hon. D.C. VAN HOLST PELLEKAAN (Stuart—Minister for Energy and Mining) (16:04):</by>  Obtained leave and introduced a bill for an act to amend the National Electricity (South Australia) Act 1996, the National Energy Retail Law (South Australia) Act 2011 and the National Gas (South Australia) Act 2008. Read a first time.</text>
        </talker>
      </subproceeding>
      <subproceeding>
        <name>Second Reading</name>
        <text id="202108258a296109c3cf4279b0000836">
          <heading>Second Reading</heading>
        </text>
        <talker role="member" id="4342" kind="speech">
          <name>The Hon. D.C. VAN HOLST PELLEKAAN</name>
          <house>House of Assembly</house>
          <electorate id="">Stuart</electorate>
          <portfolios>
            <portfolio id="">
              <name>Minister for Energy and Mining</name>
            </portfolio>
          </portfolios>
          <startTime time="2021-08-25T16:05:19" />
          <text id="202108258a296109c3cf4279b0000837">
            <timeStamp time="2021-08-25T16:05:19" />
            <by role="member" id="4342">The Hon. D.C. VAN HOLST PELLEKAAN (Stuart—Minister for Energy and Mining) (16:05):</by>  I move:</text>
          <text id="202108258a296109c3cf4279b0000838">
            <inserted>That this bill be now read a second time.</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000839">I seek leave to have the second reading explanation and explanation of clauses inserted in <term>Hansard </term>without my reading them.</text>
          <text id="202108258a296109c3cf4279b0000840">Leave granted.</text>
          <text id="202108258a296109c3cf4279b0000841">
            <inserted>The energy sector is constantly evolving. This evolution includes the emergence of innovative technologies and business models in the national energy markets. These new initiatives can bring significant benefits to consumers.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000842">
            <inserted>It is therefore essential that the regulatory framework that supports Australia's energy market can adapt and respond to technological advancements to operate in the long-term interests of consumers.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000843">
            <inserted>The introduction of a regulatory sandbox toolkit aims to make it easier for businesses to develop and test these innovative energy technologies and business models. This type of innovation in the energy sector can lead to better services and lower costs for consumers.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000844">
            <inserted>A regulatory sandbox is a framework within which participants can trial innovative concepts in the market under relaxed regulatory requirements, on a time-limited basis and with appropriate safeguards in place.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000845">
            <inserted>The objective of a regulatory sandbox toolkit is to encourage innovation, which has the potential to contribute to the long-term interests of consumers, rather than simply to facilitate an increased number of trials.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000846">
            <inserted>The National Energy Laws (Regulatory Sandboxing) Bill 2021 presented to you today, seeks to implement changes to the National Electricity Law, National Gas Law and National Energy Retail Law to introduce a regulatory sandbox toolkit.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000847">
            <inserted>In the development of this package it was considered that various regulatory tools, both existing and new, could be used to facilitate proof-of-concept trials. These tools could be applied according to their suitability to a proposed trial.</inserted>
          </text>
          <page num="6860" />
          <text id="202108258a296109c3cf4279b0000848">
            <inserted>It was considered that the existing regulatory framework may limit opportunities for trials of innovative products and business models which may provide significant benefits to consumers. As such two tools have been developed to provide greater flexibility in the regulatory framework.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000849">
            <inserted>The first introduces a new Australian Energy Regulator (AER) regulatory waiver power that can provide time-limited regulatory relief to eligible trials.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000850">
            <inserted>The second introduces a new power for the Australian Energy Market Commission (AEMC) to make a trial rule. This includes an amended rule change process for proof-of-concept trials that could be used if an eligible trial required new rules or the alteration of existing rules for a limited time to be conducted.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000851">
            <inserted>With regard to a trial waiver, a one-stop shop is considered necessary to undertake a trial project under this process. The AER is considered the appropriate body for considering and providing such exemptions given their role as the Regulator of the national frameworks.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000852">
            <inserted>The Bill includes a broad power for the AER to grant specific exemptions and waivers to facilitate the conduct of proof-of-concept trials, subject to the 'trial projects guidelines' the AER develops in consultation with the market bodies and relevant stakeholders.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000853">
            <inserted>This tool could be used if an eligible trial required an exemption from a specific rule (or rules) in the National Electricity Rules, National Energy Retail Rules or the National Gas Rules.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000854">
            <inserted>Registration requirements have been identified as a potential barrier to trial projects proceeding. The requirement to be registered is set out in the Laws.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000855">
            <inserted>Whilst the Laws provide for an exemption to these requirements, the responsible body is AEMO for certain registration categories and the AER for other registration categories. The Bill therefore provides for the AER to be the body that provides any necessary exemption from registration requirements for trial projects.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000856">
            <inserted>The Bill also ensures that the AER may only grant a trial waiver if it has taken into account the innovative trial principles introduced in the Bill and any matter required by the rules.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000857">
            <inserted>With regard to a trial rule, this new tool could be used if an eligible trial required new rules or the alteration of existing rules for a limited time to be conducted. The development of a separate rule-making power overcomes issues with the current rule making process which is considered too lengthy and represents too high a barrier for the purposes of a limited trial rule. The proposed trial rule change process will be conducted by the AEMC in under 10 weeks and encompass the National Electricity Rules, National Energy Retail Rules and the National Gas Rules.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000858">
            <inserted>It is possible that some proof-of-concept trials may require more than one of the regulatory sandbox tools to proceed. For other proof-of-concept trials, existing arrangements may be sufficient, and they may not need any of the sandbox tools to proceed. </inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000859">
            <inserted>Overall, the Bill seeks to achieve the following outcomes:</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000860">
            <item sublevel="1" bullet="true">
              <inserted>The Bill introduces a set of innovative trial principles in the national energy laws. These principles must be taken into account by the market bodies when determining whether a trial project is genuinely innovative in connection with granting a trial waiver or making a trial Rule. </inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000861">
            <item sublevel="1" bullet="true">
              <inserted>Amending the functions and powers of the AER to make trial waivers for trial projects.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000862">
            <item sublevel="1" bullet="true">
              <inserted>Provision for the AEMC to make trial Rules for trial projects.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000863">
            <item sublevel="1" bullet="true">
              <inserted>Introduction of a more streamlined process for the assessment and making of trial Rules.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000864">
            <item sublevel="1" bullet="true">
              <inserted>Provision for the AER to monitor and enforce trial waivers, and associated conditions, and trial Rules and any requirements as set by the AEMC.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000865">
            <item sublevel="1" bullet="true">
              <inserted>Provision for the AER and AEMC to revoke a trial waiver or trial rule respectively should the need arise. For example, if conditions or requirements placed on a trial waiver or rule are breached.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000866">
            <inserted>The Bill also makes provision for the South Australian Minister responsible for administering the relevant laws to make an initial set of National Electricity Rules, National Energy Retail Rules and National Gas Rules associated with the amendments on regulatory sandboxing. Significant public consultation on the sets of initial rules has already been undertaken.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000867">
            <inserted>Finally, an innovation enquiry service will form part of the toolkit, however this can be operated within the existing regulatory framework. It was considered innovations that are in consumers' interests could be encouraged by establishing a clearer process for proponents of proof-of-concept trials to approach energy market regulatory bodies for feedback and guidance on regulatory issues and regulatory options to avoid unnecessary delays and costs for eligible trials. The AER will be responsible for its implementation including determining when the service will be launched and resourcing requirements.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000868">
            <inserted>By introducing a regulatory sandbox we are providing for a regulatory framework that is better equipped to respond to the rapid change in the energy sector and deliver benefits for customers through innovation.</inserted>
          </text>
          <page num="6861" />
          <text id="202108258a296109c3cf4279b0000869">
            <inserted>I commend the bill to the Chamber.</inserted>
          </text>
          <bookmark>EXPLANATION OF CLAUSES</bookmark>
          <text id="202108258a296109c3cf4279b0000870">
            <inserted>
              <subheading>EXPLANATION OF CLAUSES</subheading>
            </inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000871">
            <item>
              <inserted>Part 1—Preliminary</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000872">
            <item>
              <inserted>1—Short title </inserted>
            </item>
          </text>
          <page num="6572" />
          <text id="202108258a296109c3cf4279b0000873">
            <item>
              <inserted>2—Commencement </inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000874">
            <item>
              <inserted>3—Amendment provisions</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000875">
            <inserted>These clauses are formal.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000876">
            <item>
              <inserted>Part 2—Amendment of <term>National Electricity (South Australia) Act 1996</term></inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000877">
            <item>
              <inserted>4—Amendment of section 2—Definitions</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000878">
            <inserted>Certain definitions are inserted for the purposes of the measure, including <term>trial project</term>, <term>trial Rule </term>and <term>trial waiver</term>.</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000879">
            <inserted>5—Insertion of section 7B</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000880">
            <inserted>The innovative trial principles are inserted as section 7B:</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000881">
            <inserted>7B—Innovative trial principles</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000882">
            <item sublevel="2">
              <inserted>The innovative trial principles are set out.</inserted>
            </item>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000883">
            <inserted>6—Amendment of section 15—Functions and powers of AER</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000884">
            <inserted>An additional function is conferred on the AER relating to monitoring and investigating the conduct and outcomes of a trial project undertaken under a trial Rule or trial waiver.</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000885">
            <inserted>7—Insertion of Part 3 Division 1D</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000886">
            <inserted>New Division 1D is inserted into Part 3:</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000887">
            <inserted>Division 1D—AER trial waiver functions</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000888">
            <inserted>18ZJ—Definitions</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000889">
            <item sublevel="2">
              <inserted>A definition of <term>proponent </term>is inserted.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000890">
            <inserted>18ZK—Interpretative matters</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000891">
            <item sublevel="2">
              <inserted>Certain interpretative matters are provided for.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000892">
            <inserted>18ZL—Trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000893">
            <item sublevel="2">
              <inserted>The AER may grant a trial waiver, being an exemption from section 12 of the Law or the Rules, or a provision of the Rules.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000894">
            <inserted>18ZM—Conditions of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000895">
            <item sublevel="2">
              <inserted>A trial waiver must be subject to any conditions required by the Rules and may be subject to any conditions the AER considers appropriate.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000896">
            <inserted>18ZN—Consultation on trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000897">
            <item sublevel="2">
              <inserted>Consultation requirement that the AER must comply with before granting a trial waiver are provided for.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000898">
            <inserted>18ZO—Publication etc of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000899">
            <item sublevel="2">
              <inserted>A copy of a trial waiver must be published on the AER's website.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000900">
            <inserted>18ZP—Duration of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000901">
            <item sublevel="2">
              <inserted>A trial waiver has effect from the day specified in the trial waiver and for the period (not exceeding 5 years) specified in the trial waiver.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000902">
            <inserted>18ZQ—Extension of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000903">
            <item sublevel="2">
              <inserted>Provision is made for the AER to extend a trial waiver by a specified period.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000904">
            <inserted>18ZR—Compliance with trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000905">
            <item sublevel="2">
              <inserted>A proponent is required to comply with the conditions of a trial waiver.</inserted>
            </item>
          </text>
          <page num="6862" />
          <text id="202108258a296109c3cf4279b0000906">
            <inserted>18ZS—Revocation of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000907">
            <item sublevel="2">
              <inserted>The AER is authorised to revoke a trial waiver.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000908">
            <inserted>18ZT—Other matters</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000909">
            <item sublevel="2">
              <inserted>Certain other matters relating to the granting of a trial waiver are set out.</inserted>
            </item>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000910">
            <inserted>8—Amendment of section 34—Rule making powers</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000911">
            <inserted>The powers to make Rules in the Law are expanded to include any matter or thing related to, or necessary or expedient for, the purposes of a trial Rule, trial project or a trial waiver.</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000912">
            <inserted>9—Amendment of section 87—Definitions</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000913">
            <inserted>A definition of <term>trial Rule </term>is inserted. A trial Rule is included in the definition of market initiated proposed Rule. Other amendments are consequential.</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000914">
            <inserted>10—Insertion of section 88C</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000915">
            <inserted>New section 88C is inserted:</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000916">
            <inserted>88C—AEMC must take into account innovative trial principles in certain cases</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000917">
            <item sublevel="2">
              <inserted>A requirement to take into account the innovative trial principles in making a trial Rule is provided for.</inserted>
            </item>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000918">
            <inserted>11—Insertion of section 90DA</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000919">
            <inserted>New section 90DA is inserted:</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000920">
            <inserted>90DA—South Australian Minister to make initial Rules relating to regulatory sandboxing</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000921">
            <item sublevel="2">
              <inserted>The South Australian Minister is empowered to make initial Rules relating to regulatory sandboxing. Certain requirements relating to the making of such Rules are imposed, including publication requirements.</inserted>
            </item>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000922">
            <inserted>12—Amendment of section 92—Contents of requests for Rules</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000923">
            <inserted>In addition to the Regulations, provision is made for the Rules to prescribe requirements relating to requests for Rules.</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000924">
            <inserted>13—Amendment of section 94—Initial consideration of request for Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000925">
            <inserted>In addition to the Regulations, provision is made for the Rules to prescribe requirements relating to requests for Rules.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000926">
            <inserted>The other amendments are consequential.</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000927">
            <inserted>14—Insertion of section 96AA</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000928">
            <inserted>New section 96AA is inserted:</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000929">
            <inserted>96AA—Publication of final Rule determination for trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000930">
            <item sublevel="2">
              <inserted>Provision is made in relation to the time within which a final Rule determination for request for a Rule that is a trial Rule must be made. Sections 96 and 96A are disapplied in relation to a request for a trial Rule.</inserted>
            </item>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000931">
            <inserted>15—Amendment of section 102—Final Rule determination</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000932">
            <inserted>A requirement for the AEMC to give its reasons relating to a final Rule determination taking into account the innovative trial principles is inserted.</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000933">
            <inserted>16—Amendment of section 103—Making of Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000934">
            <inserted>The AEMC is required to specify an expiry date for a trial Rule (which must be no more than 5 years after the date on which the trial Rule commences operation).</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000935">
            <inserted>17—Insertion of sections 104A to 104D</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000936">
            <inserted>New sections 104A to 104D are inserted:</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000937">
            <inserted>104A—Extension of trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000938">
            <item sublevel="2">
              <inserted>Provision is made for the AEMC to extend a trial Rule by a specified period.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000939">
            <inserted>104B—AEMC may impose requirements on proponent of trial project on making trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000940">
            <item sublevel="2">
              <inserted>The AEMC must give consideration to revoking the trial Rule on the recommendation of the AER.</inserted>
            </item>
          </text>
          <page num="6863" />
          <text id="202108258a296109c3cf4279b0000941">
            <inserted>104C—AEMC may revoke trial Rule on recommendation of AER</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000942">
            <item sublevel="2">
              <inserted>Provision is made for the AEMC to impose requirements on proponent of trial project on making trial Rule.</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000943">
            <inserted>104D—Special provision for revocation of trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000944">
            <item sublevel="2">
              <inserted>Certain Divisions of the Part are disapplied in relation to the making of a Rule that revokes a trial Rule and certain requirements are imposed on such a revocation.</inserted>
            </item>
          </text>
          <page num="6574" />
          <text id="202108258a296109c3cf4279b0000945">
            <item>
              <inserted>Part 3—Amendment of National Energy Retail Law (South Australia) Act 2011</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000946">
            <item>
              <inserted>18—Amendment of section 2—Definitions</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000947">
            <inserted>Amendments that are substantially similar to the amendments to the <term>National Electricity Law </term>are made to the <term>National Energy Retail Law</term>.</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000948">
            <item>
              <inserted>19—Insertion of section 13A</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000949">
            <item>
              <inserted>13A—Innovative trial principles</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000950">
            <item>
              <inserted>20—Insertion of Part 5A</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000951">
            <inserted>Part 5A—AER trial waiver functions</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000952">
            <inserted>121A—Definitions</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000953">
            <inserted>121B—Interpretative matters</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000954">
            <inserted>121C—Trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000955">
            <inserted>121D—Conditions of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000956">
            <inserted>121E—Consultation on trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000957">
            <inserted>121F—Publication etc of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000958">
            <inserted>121G—Duration of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000959">
            <inserted>121H—Extension of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000960">
            <inserted>121I—Compliance with trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000961">
            <inserted>121J—Revocation of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000962">
            <inserted>121K—Other matters</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000963">
            <item>
              <inserted>21—Amendment of section 204—Functions and powers of AER (including delegations)</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000964">
            <item>
              <inserted>22—Amendment of section 235—Definitions</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000965">
            <item>
              <inserted>23—Insertion of section 236A</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000966">
            <inserted>236A—AEMC must take into account innovative trial principles in certain cases</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000967">
            <item>
              <inserted>24—Amendment of section 237—Subject matters of Rules</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000968">
            <item>
              <inserted>25—Insertion of section 238AA</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000969">
            <inserted>238AA—South Australian Minister to make initial Rules relating to regulatory sandboxing</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000970">
            <item>
              <inserted>26—Amendment of section 246—Contents of requests for Rules</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000971">
            <item>
              <inserted>27—Amendment of section 249—Initial consideration of request for Rule</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000972">
            <item>
              <inserted>28—Insertion of section 252A</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000973">
            <inserted>252A—Publication of final Rule determination for trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000974">
            <item>
              <inserted>29—Amendment of section 259—Final Rule determination</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000975">
            <item>
              <inserted>30—Amendment of section 261—Making of Rule</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000976">
            <item>
              <inserted>31—Insertion of sections 262A to 262D</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000977">
            <inserted>262A—Extension of trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000978">
            <inserted>262B—AEMC may impose requirements on proponent of trial project on making trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000979">
            <inserted>262C—AEMC may revoke trial Rule on recommendation of AER</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000980">
            <inserted>262D—Special provision for revocation of trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000981">
            <item>
              <inserted>Part 4—Amendment of <term>National Gas (South Australia) Act 2008</term></inserted>
            </item>
          </text>
          <page num="6864" />
          <text id="202108258a296109c3cf4279b0000982">
            <item>
              <inserted>32—Amendment of section 2—Definitions</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000983">
            <inserted>Amendments that are substantially similar to the amendments to the <term>National Electricity Law </term>are made to the <term>National Gas Law</term>.</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0000984">
            <inserted>33—Insertion of Chapter 1 Part 3 Division 2A</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000985">
            <inserted>Division 2A—Innovative trial principles</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000986">
            <inserted>24A—Innovative trial principles</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000987">
            <item>
              <inserted>34—Amendment of section 27—Functions and powers of the AER</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000988">
            <item>
              <inserted>35—Insertion of Chapter 2 Part 1 Division 1B</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0000989">
            <inserted>Division 1B—AER trial waiver functions</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000990">
            <inserted>30U—Definitions</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000991">
            <inserted>30V—Interpretative matters</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000992">
            <inserted>30W—Trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000993">
            <inserted>30X—Conditions of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000994">
            <inserted>30Y—Consultation on trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000995">
            <inserted>30Z—Publication etc of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000996">
            <inserted>30ZA—Duration of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000997">
            <inserted>30ZB—Extension of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000998">
            <inserted>30ZC—Compliance with trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0000999">
            <inserted>30ZD—Revocation of trial waiver</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0001000">
            <inserted>30ZE—Other matters</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0001001">
            <item>
              <inserted>36—Amendment of section 74—Subject matter for National Gas Rules</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0001002">
            <item>
              <inserted>37—Amendment of section 290—Definitions</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0001003">
            <item>
              <inserted>38—Insertion of section 293A</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0001004">
            <inserted>293A—AEMC must take into account innovative trial principles in certain cases</inserted>
          </text>
          <text continued="true" id="202108258a296109c3cf4279b0001005">
            <inserted>39—Insertion of section 294EA</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0001006">
            <inserted>294EA—South Australian Minister to make initial Rules relating to regulatory sandboxing</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0001007">
            <item>
              <inserted>40—Amendment of section 298—Content of requests for a Rule</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0001008">
            <item>
              <inserted>41—Amendment of section 301—Initial consideration of request for Rule</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0001009">
            <item>
              <inserted>42—Insertion of section 304A</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0001010">
            <inserted>304A—Publication of final Rule determination for trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0001011">
            <item>
              <inserted>43—Amendment of section 311—Final Rule determination</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0001012">
            <item>
              <inserted>44—Amendment of section 313—Making of Rule</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0001013">
            <item>
              <inserted>45—Insertion of sections 314A to 314C</inserted>
            </item>
          </text>
          <text id="202108258a296109c3cf4279b0001014">
            <inserted>314A—Extension of trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0001015">
            <inserted>314B—AEMC may impose requirements on proponent of trial project on making trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0001016">
            <inserted>314C—AEMC may revoke trial Rule on recommendation of AER</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0001017">
            <inserted>314D—Special provision for revocation of trial Rule</inserted>
          </text>
          <text id="202108258a296109c3cf4279b0001018">Debate adjourned on motion of Mr Odenwalder.</text>
        </talker>
      </subproceeding>
    </subject>
  </proceeding>
</hansard>