<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2021-05-13" />
  <sessionName>Fifty-Fourth Parliament, Second Session (54-2)</sessionName>
  <parliamentNum>54</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="5440" />
  <endPage num="5820" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding>
    <name>Personal Explanation</name>
    <text id="2021051350ad797d9ac744ff80001011">
      <heading>Personal Explanation</heading>
    </text>
    <subject>
      <name>South Eastern Freeway</name>
      <text id="2021051350ad797d9ac744ff80001012">
        <heading>South Eastern Freeway</heading>
      </text>
      <talker role="member" id="4843" kind="speech">
        <name>The Hon. C.L. WINGARD</name>
        <house>House of Assembly</house>
        <electorate id="">Gibson</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Infrastructure and Transport</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Recreation</name>
          </portfolio>
        </portfolios>
        <startTime time="2021-05-13T17:53:11" />
        <text id="2021051350ad797d9ac744ff80001013">
          <timeStamp time="2021-05-13T17:53:11" />
          <by role="member" id="4843">The Hon. C.L. WINGARD (Gibson—Minister for Infrastructure and Transport, Minister for Recreation, Sport and Racing) (17:53):</by>  I seek leave to make a personal explanation.</text>
        <text id="2021051350ad797d9ac744ff80001014">Leave granted.</text>
      </talker>
      <talker role="member" id="4843" kind="speech" continued="true">
        <name>The Hon. C.L. WINGARD</name>
        <house>House of Assembly</house>
        <text id="2021051350ad797d9ac744ff80001015">
          <by role="member" id="4843">The Hon. C.L. WINGARD:</by>  Earlier today, in response to a question from the member for Kavel, I made a statement, and I quote:</text>
        <text id="2021051350ad797d9ac744ff80001016">
          <inserted>The last time any surfacing work was done there was 20-plus years ago, so we know that we are adding to safety on that road.</inserted>
        </text>
        <text continued="true" id="2021051350ad797d9ac744ff80001017">The member from West Torrens subsequently brought to the attention of the house that some works had been undertaken in 2016. For clarification, the context in which that comment was made was with respect to the $35 million of resurfacing works on the South Eastern Freeway that we are undertaking between the Tollgate and Crafers. There was indeed 5.5-lane kilometres of repair work undertaken in 2016 at a cost of around $1 million between the Heysen Tunnels to Crafers, with various resurfacing treatments. However, the work we are undertaking between the tollgate and Crafers amounts to significantly more.</text>
        <page num="5512" />
        <text id="2021051350ad797d9ac744ff80001018">It is 45-lane kilometres of pavement rehabilitation, with deep-lift asphalt surfacing, fixing all lanes. The asphalt will also reduce the noise, improve drainage and make the roads safer and more comfortable. As I said in my response, this project is creating 165 jobs. As of approximately two weeks ago, the team out there has already done about 12-lane kilometres and laid more than 35,000 tonnes of new asphalt. We look forward to that deep-lift asphalt resurfacing continuing.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>