<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2021-02-02" />
  <sessionName>Fifty-Fourth Parliament, Second Session (54-2)</sessionName>
  <parliamentNum>54</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="3706" />
  <endPage num="3981" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Answers to Questions</name>
    <subject>
      <name>Virtual Power Plant</name>
      <text id="20210202f82af7b6e9b6410590001457">
        <inserted>
          <heading>Virtual Power Plant</heading>
        </inserted>
      </text>
      <talker role="member" id="3533" kind="question">
        <name>The Hon. G.G. BROCK</name>
        <house>House of Assembly</house>
        <electorate id="">Frome</electorate>
        <questions>
          <question date="2021-02-02">
            <name>Virtual Power Plant</name>
          </question>
        </questions>
        <text id="20210202f82af7b6e9b6410590001458">
          <inserted>In reply to <by role="member" id="3533">the Hon. G.G. BROCK (Frome)</by> (23 July 2020).  </inserted>
        </text>
      </talker>
      <talker role="member" id="4342" kind="answer">
        <name>The Hon. D.C. VAN HOLST PELLEKAAN</name>
        <house>House of Assembly</house>
        <electorate id="">Stuart</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Energy and Mining</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2021-02-02">
            <name>Virtual Power Plant</name>
          </question>
        </questions>
        <page num="3932" />
        <text id="20210202f82af7b6e9b6410590001459">
          <inserted>
            <by role="member" id="4342">The Hon. D.C. VAN HOLST PELLEKAAN (Stuart—Minister for Energy and Mining):</by>  I have been advised:</inserted>
        </text>
        <text id="20210202f82af7b6e9b6410590001460">
          <inserted>The South Australian Virtual Power Plant (SA VPP) trial phases were designed to inform the business case for an expanded state-wide roll out of the program, as such the government imposed a minimum 5 per cent target for regional installations during the phase 2 trial.</inserted>
        </text>
        <text id="20210202f82af7b6e9b6410590001461">
          <inserted>These requirements were exceeded, with 64 of the 1,000 home energy systems installed on properties in regional South Australia, including Murray Bridge (23), Port Lincoln (11), Nuriootpa/Tanunda (7), and Whyalla (6).</inserted>
        </text>
        <text id="20210202f82af7b6e9b6410590001462">
          <inserted>Importantly, properties that are selected for the installation of a home energy system firstly need to be assessed as suitable, and the tenants are also required to opt-in to become a customer of the program.</inserted>
        </text>
        <text id="20210202f82af7b6e9b6410590001463">
          <inserted>To that end, under the phase 2 trial, 16 South Australian Housing Authority (SAHA) properties were assessed for suitability within the Frome electorate, and seven (7) offers were made to tenants to join the program. Regretfully those tenants elected not to accept the retail offer to become a SA VPP customer.</inserted>
        </text>
        <text id="20210202f82af7b6e9b6410590001464">
          <inserted>The SA VPP has now advanced to phase 3, and to date a further 24 SAHA properties in the Frome electorate were found to be suitable, and tenants were invited to join the program on 1 September 2020. Of these:</inserted>
        </text>
        <text id="20210202f82af7b6e9b6410590001465">
          <item sublevel="1" bullet="true">
            <inserted>19 tenants have signed up for a site assessment;</inserted>
          </item>
        </text>
        <text id="20210202f82af7b6e9b6410590001466">
          <item sublevel="1" bullet="true">
            <inserted>Eight (8) properties have been found to be suitable, with the remaining 11 still under review;</inserted>
          </item>
        </text>
        <text id="20210202f82af7b6e9b6410590001467">
          <item sublevel="1" bullet="true">
            <inserted>Six (6) tenants have now accepted the retail offer to become a SA VPP customer, of which four (4) home energy systems have been installed with a further two (2) to be scheduled.</inserted>
          </item>
        </text>
        <text continued="true" id="20210202f82af7b6e9b6410590001468">
          <inserted>South Australia now has more than 21,000 home batteries installed or committed (with more than 14,000 supported by the government's flagship Home Battery Scheme), cementing our position as a leader both nationally and internationally for the adoption of residential storage.</inserted>
        </text>
        <text id="20210202f82af7b6e9b6410590001469">
          <inserted>Through this scheme I am advised there are currently 265 households with conditional approvals in postcodes that are located in the Frome electorate. 224 of these households have had batteries installed.</inserted>
        </text>
        <text id="20210202f82af7b6e9b6410590001470">
          <inserted>I also understand that 59 home batteries were installed under the Community Solar Project, a Port Pirie Regional Council initiative to facilitate the provision of affordable solar in the region.</inserted>