<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2019-10-16" />
  <sessionName>Fifty-Fourth Parliament, First Session (54-1)</sessionName>
  <parliamentNum>54</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="7809" />
  <endPage num="7919" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Question Time</name>
    <subject>
      <name>Horrocks Highway</name>
      <text id="201910169d2d53e60b664002b0000621">
        <heading>Horrocks Highway</heading>
      </text>
      <talker role="member" id="3533" kind="question">
        <name>The Hon. G.G. BROCK</name>
        <house>House of Assembly</house>
        <electorate id="">Frome</electorate>
        <questions>
          <question date="2019-10-16">
            <name>Horrocks Highway</name>
          </question>
        </questions>
        <startTime time="2019-10-16T14:43:34" />
        <text id="201910169d2d53e60b664002b0000622">
          <timeStamp time="2019-10-16T14:43:34" />
          <by role="member" id="3533">The Hon. G.G. BROCK (Frome) (14:43):</by>  My question is to the Minister for Transport and Infrastructure. Can the minister please update the house on what designs, if any, have been carried out for the construction work for the Horrocks Highway with regard to layout and overpassing lanes? When will these designs be made available to the public? When will the reconstruction commence? What is the estimated completion date?</text>
      </talker>
      <talker role="member" id="4847" kind="answer">
        <name>The Hon. S.K. KNOLL</name>
        <house>House of Assembly</house>
        <electorate id="">Schubert</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Transport</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Planning</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2019-10-16">
            <name>Horrocks Highway</name>
          </question>
        </questions>
        <startTime time="2019-10-16T14:43:57" />
        <text id="201910169d2d53e60b664002b0000623">
          <timeStamp time="2019-10-16T14:43:57" />
          <by role="member" id="4847">The Hon. S.K. KNOLL (Schubert—Minister for Transport, Infrastructure and Local Government, Minister for Planning) (14:43):</by>  I do note very much the member for Frome's interest in this. It is something that I know he has passionately been fighting for and something that he fought for, no doubt, whilst he was in cabinet, and something now that the Marshall Liberal government is able to deliver: $55 million on the table towards fixing the Horrocks Highway. It starts in my electorate, heads through to the member for Frome's, and also has solid impacts for the member for Stuart. This is a very important freight route in South Australia and one that was largely ignored for a long period of time. This $55 million will go a long way to delivering upgrades along this section of road.</text>
        <text id="201910169d2d53e60b664002b0000624">There are already works that have happened outside this $55 million to improve the road surface, especially at the southern end of the Horrocks Highway, essentially around Roseworthy. South of Roseworthy, there has been quite a bit of resurfacing work and a bit of pavement correction work that's gone along with it. There are a number of projects that are earmarked as part of that $55 million. As the member highlights in his question, there are a number of elements to the work that need to be undertaken.</text>
        <text id="201910169d2d53e60b664002b0000625">There are some intersection upgrades further north, around Gladstone, and there are a number of overtaking lanes that are being looked at for that road. Much of the work that needs to happen is around pavement correction and shoulder sealing—basic work, but basic work that saves lives. We do know that some of the worst sections of that road are below Tarlee, and that's where a lot of this shoulder sealing and pavement correction work will be undertaken.</text>
        <text id="201910169d2d53e60b664002b0000626">Can I say that when it comes to sealing shoulders, something as simple as sealing shoulders—something that in today's money costs around $120,000 to $130,000 per lane kilometre—can reduce the incidence of serious death and injury by 40 per cent on a road. In fact, there is going to be a massive payoff for a road that too often features in our road crash statistics, and $55 million on the table—$44 million from our friends in the federal government and Scott Morrison, a Prime Minister who has injected huge amounts of money into regional South Australia and regional roads.</text>
        <text id="201910169d2d53e60b664002b0000627">Can I assure the member that work is actually already underway in relation to the design of this. Again, there are existing maintenance plans for that road in terms of the resealing. In fact, the department already has an existing database of understanding where shoulder sealing needs to be undertaken and the rank order priority of those, so we already do have a very good handle on where shoulder sealing and pavement correction need to be undertaken.</text>
        <text id="201910169d2d53e60b664002b0000628">There are a number of other treatments that are happening along other sections of the corridor along this road, including up at Gladstone. In terms of the timing, that is something that we will be announcing as we progress. I can guarantee that the member for Frome is going to find out about when that happens as and when that information is able to be made public.</text>
        <page num="7849" />
        <text id="201910169d2d53e60b664002b0000629">Can I say to the people of the Clare Valley, the people of the Mid North and the people who travel further north that this government is going to deliver and is delivering for roads in regional South Australia, right across regional South Australia. We now have in the kitty over $1 billion to help deliver road infrastructure upgrades in regional South Australia—something unheard of over the course of the history of South Australia.</text>
        <text id="201910169d2d53e60b664002b0000630">This is a massive down payment on improving freight productivity, a massive down payment on reducing our regional road toll and a massive down payment on repaying the faith to regional South Australians who have long felt forgotten by their government and who have for far too long delivered in spades to the productivity and the prosperity of this state without getting their dues from their central government.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>