<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2019-10-15" />
  <sessionName>Fifty-Fourth Parliament, First Session (54-1)</sessionName>
  <parliamentNum>54</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="7703" />
  <endPage num="7807" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Question Time</name>
    <subject>
      <name>Aluminium Composite Cladding</name>
      <text id="201910154ddf042b58c340fb90000524">
        <heading>Aluminium Composite Cladding</heading>
      </text>
      <talker role="member" id="633" kind="question">
        <name>The Hon. A. KOUTSANTONIS</name>
        <house>House of Assembly</house>
        <electorate id="">West Torrens</electorate>
        <questions>
          <question date="2019-10-15">
            <name>Aluminium Composite Cladding</name>
          </question>
        </questions>
        <startTime time="2019-10-15T14:50:27" />
        <text id="201910154ddf042b58c340fb90000525">
          <timeStamp time="2019-10-15T14:50:27" />
          <by role="member" id="633">The Hon. A. KOUTSANTONIS (West Torrens) (14:50):</by>  My question is to the Minister for Transport and Infrastructure. Can the minister assure the house that in his audit all the buildings deemed 'acceptable risk or lower' have core samples taken of their aluminium cladding?</text>
      </talker>
      <talker role="member" id="4847" kind="answer">
        <name>The Hon. S.K. KNOLL</name>
        <house>House of Assembly</house>
        <electorate id="">Schubert</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Transport</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Planning</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2019-10-15">
            <name>Aluminium Composite Cladding</name>
          </question>
        </questions>
        <startTime time="2019-10-15T14:50:42" />
        <text id="201910154ddf042b58c340fb90000526">
          <timeStamp time="2019-10-15T14:50:42" />
          <by role="member" id="4847">The Hon. S.K. KNOLL (Schubert—Minister for Transport, Infrastructure and Local Government, Minister for Planning) (14:50):</by>  That is not the way that the audit process works, but can I say that where cladding isn't tested that cladding is actually just rated as being the worst kind of cladding. Essentially, we dial up the risk to 10 out of 10 and assume the worst for the purposes of undertaking this assessment.</text>
        <page num="7737" />
        <text id="201910154ddf042b58c340fb90000527">Again, I think there is a simplicity to saying, 'Well, if you just test every building, then they will be safe.' That is not correct. You would actually have to rip off every panel and test every panel and then replace it, and there is a difficulty with understanding whether the stuff you are replacing it with is any better than the stuff that was on there before. So, this needs to be more complex in the way that we provide an answer, and that is that, as we go through the rectification process, the updated design of these buildings will make sure that these buildings are safe.</text>
        <text id="201910154ddf042b58c340fb90000528">However, again, when it comes to the buildings that are of lower risk there is a very wide set of circumstances that provides a complete risk profile: some things to do with the design and structure of the building, some things to do with the in-built fire safety protections of the building and some things to do with the risk profile or the vulnerability profile of the people who are in the building and their times of occupancy. It is quite a detailed assessment, hence the reason why it has taken a good couple of years to be able to work through phase 2 of the audit.</text>
        <text id="201910154ddf042b58c340fb90000529">Again, this is a tool, a tool that has been certified and verified by building fire safety experts, and, again, a tool that is being used nationally around the country to come to grips with this issue, and one that, as we move forward working together with other jurisdictions to grapple with it, we are confident that we are using a rigorous evidence-based process to undertake these assessments.</text>