<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2019-09-12" />
  <sessionName>Fifty-Fourth Parliament, First Session (54-1)</sessionName>
  <parliamentNum>54</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="7299" />
  <endPage num="7421" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Estimates Replies</name>
    <subject>
      <name>North-South Corridor</name>
      <text id="201909122b887e6e7e814900b0002121">
        <inserted>
          <heading>North-South Corridor</heading>
        </inserted>
      </text>
      <talker role="member" id="633" kind="question">
        <name>The Hon. A. KOUTSANTONIS</name>
        <house>House of Assembly</house>
        <electorate id="">West Torrens</electorate>
        <questions>
          <question date="2019-09-12">
            <name>North-South Corridor</name>
          </question>
        </questions>
        <text id="201909122b887e6e7e814900b0002122">
          <inserted>In reply to <by role="member" id="633">the Hon. A. KOUTSANTONIS (West Torrens)</by> (30 July 2019).  (Estimates Committee A)</inserted>
        </text>
      </talker>
      <talker role="member" id="4847" kind="answer">
        <name>The Hon. S.K. KNOLL</name>
        <house>House of Assembly</house>
        <electorate id="">Schubert</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Transport</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Planning</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2019-09-12">
            <name>North-South Corridor</name>
          </question>
        </questions>
        <text id="201909122b887e6e7e814900b0002123">
          <inserted>
            <by role="member" id="4847">The Hon. S.K. KNOLL (Schubert—Minister for Transport, Infrastructure and Local Government, Minister for Planning):</by>  I have been advised by the Department of Planning, Transport and Infrastructure—</inserted>
        </text>
        <text id="201909122b887e6e7e814900b0002124">
          <inserted>There are currently approximately 56 FTEs working on the existing north-south corridor projects including the Darlington upgrade, Pym to Regency, Torrens to Torrens and the Northern Connector. </inserted>
        </text>
        <text id="201909122b887e6e7e814900b0002125">
          <inserted>This includes FTEs that work specifically on the north-south corridor projects which are both directly and indirectly charged to the project. </inserted>
        </text>
        <text id="201909122b887e6e7e814900b0002126">
          <inserted>Note that this excludes corporate support staff that are indirectly supporting the delivery of these projects. Also note that this FTE figure may change dependent on the stages of the works from year to year.</inserted>
        </text>
      </talker>
    </subject>
  </proceeding>
</hansard>