<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2019-09-11" />
  <sessionName>Fifty-Fourth Parliament, First Session (54-1)</sessionName>
  <parliamentNum>54</parliamentNum>
  <sessionNum>1</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="7161" />
  <endPage num="7297" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Estimates Replies</name>
    <subject>
      <name>Investing Expenditure Projects</name>
      <text id="201909113a05e1534cf0444480001933">
        <inserted>
          <heading>Investing Expenditure Projects</heading>
        </inserted>
      </text>
      <talker role="member" id="4842" kind="question">
        <name>The Hon. S.C. MULLIGHAN</name>
        <house>House of Assembly</house>
        <electorate id="">Lee</electorate>
        <questions>
          <question date="2019-09-11">
            <name>Investing Expenditure Projects</name>
          </question>
        </questions>
        <text id="201909113a05e1534cf0444480001934">
          <inserted>In reply to <by role="member" id="4842">the Hon. S.C. MULLIGHAN (Lee)</by> (24 July 2019).  (Estimates Committee B)</inserted>
        </text>
      </talker>
      <talker role="member" id="">
        <name>The Hon. R.I. LUCAS</name>
        <house>House of Assembly</house>
        <electorate id="">Treasurer</electorate>
        <text id="201909113a05e1534cf0444480001935">
          <inserted>
            <by role="member" id="">The Hon. R.I. LUCAS (Treasurer):</by>  The following information is provided on behalf of all ministers:</inserted>
        </text>
        <text id="201909113a05e1534cf0444480001936">
          <inserted>The following tables provide the budgeted expenditure across 2019-20, 2020-21, 2021-22 and 2022-23 for each individual investing expenditure project in the general government sector and public non-financial corporation sector.</inserted>
        </text>
        <text id="201909113a05e1534cf0444480001937">
          <inserted>
            <table>
              <rowtitle>
                <cell colspan="2">Agency/Title</cell>
                <cell>2019–20 Budget</cell>
                <cell>2020–21 Estimate</cell>
                <cell>2021–22 Estimate</cell>
                <cell>2022–23 Estimate</cell>
              </rowtitle>
              <row>
                <cell colspan="2">Premier and Cabinet</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Adelaide Festival Centre Precinct—AFC Upgrade</cell>
                <cell>1,700</cell>
                <cell>3,600</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Adelaide Festival Centre Precinct—AFC Technical Equipment</cell>
                <cell>2,326</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Arts Storage</cell>
                <cell>1,612</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Womens Memorial Playing Fields</cell>
                <cell>4,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Adelaide Superdrome Upgrades</cell>
                <cell>4,100</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Home of Football at State Sports Park</cell>
                <cell>10,000</cell>
                <cell>4,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>1,390</cell>
                <cell>882</cell>
                <cell>904</cell>
                <cell>927</cell>
                <cell />
              </row>
              <row>
                <cell>Capital Investment Program—Arts SA</cell>
                <cell>848</cell>
                <cell>743</cell>
                <cell>762</cell>
                <cell>780</cell>
                <cell />
              </row>
              <row>
                <cell>Government Information and Communication Technology Services</cell>
                <cell>6,362</cell>
                <cell>6,625</cell>
                <cell>6,791</cell>
                <cell>6,960</cell>
                <cell />
              </row>
              <row>
                <cell>Annual Program—DPC</cell>
                <cell>2,027</cell>
                <cell>1,997</cell>
                <cell>2,047</cell>
                <cell>2,098</cell>
                <cell />
              </row>
              <row>
                <cell>Office for Recreation, Sport and Racing</cell>
                <cell>1,334</cell>
                <cell>1,183</cell>
                <cell>1,213</cell>
                <cell>1,243</cell>
                <cell />
              </row>
              <row>
                <cell>State Governor's Establishment</cell>
                <cell>128</cell>
                <cell>131</cell>
                <cell>134</cell>
                <cell>137</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Adelaide Festival Centre Trust</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Adelaide Festival Centre Precinct—Technical Equipment</cell>
                <cell>2,247</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Her Majesty's Theatre Redevelopment</cell>
                <cell>6,666</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Attorney-General</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>SA Computer Aided Dispatch System</cell>
                <cell>3,516</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>SA Government Radio Network</cell>
                <cell>18,482</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Ombudsman SA office accommodation—fit out</cell>
                <cell>1,200</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>GPO Tower—10 Franklin Street—office fit out</cell>
                <cell>26,608</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Liquor Licensing full fee structure</cell>
                <cell>60</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Response Unit for the Royal Commission into Aged Care Quality and Safety</cell>
                <cell>150</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Forensic Science SA—CT Scanner</cell>
                <cell>2,050</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>655</cell>
                <cell>1,486</cell>
                <cell>1,523</cell>
                <cell>1,561</cell>
                <cell />
              </row>
              <row>
                <cell>State and Public Safety Communications Infrastructure</cell>
                <cell>244</cell>
                <cell>250</cell>
                <cell>256</cell>
                <cell>262</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Courts</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Electronic Court Management System</cell>
                <cell>4,686</cell>
                <cell>3,509</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Higher Courts Redevelopment</cell>
                <cell>20,585</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Judge View</cell>
                <cell>591</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>2,177</cell>
                <cell>2,249</cell>
                <cell>2,323</cell>
                <cell>2,399</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Electoral Commission</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>51</cell>
                <cell>52</cell>
                <cell>148</cell>
                <cell>100</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Public Trustee</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Hardware</cell>
                <cell>60</cell>
                <cell>550</cell>
                <cell>75</cell>
                <cell>80</cell>
                <cell />
              </row>
              <row>
                <cell>Machines and Equipment</cell>
                <cell>28</cell>
                <cell>46</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Furniture and Fittings</cell>
                <cell>54</cell>
                <cell>56</cell>
                <cell>57</cell>
                <cell>60</cell>
                <cell />
              </row>
              <row>
                <cell>Software</cell>
                <cell>174</cell>
                <cell>123</cell>
                <cell>154</cell>
                <cell>130</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Child Protection</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Residential Care Facilities</cell>
                <cell>2,252</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Leasehold, ICT Equipment and Furniture</cell>
                <cell>1,318</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Education</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Escalations</cell>
                <cell>5,432</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>New Projects</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>4,107</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Unley High School</cell>
                <cell>9,016</cell>
                <cell>14,507</cell>
                <cell>7,834</cell>
                <cell>1,054</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Aberfoyle Park High School</cell>
                <cell>1,670</cell>
                <cell>4,991</cell>
                <cell>2,942</cell>
                <cell>203</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Additional demountable capacity</cell>
                <cell>—</cell>
                <cell>11,897</cell>
                <cell>1,125</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Additional disability capacity</cell>
                <cell>1,560</cell>
                <cell>5,503</cell>
                <cell>3,138</cell>
                <cell>58</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Adelaide Secondary School of English</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Aldinga Beach B-7 School</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Ardtornish Primary School</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Australian Science &amp; Mathematics Sch</cell>
                <cell>75</cell>
                <cell>670</cell>
                <cell>2,250</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Balaklava High School</cell>
                <cell>500</cell>
                <cell>2,700</cell>
                <cell>700</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Banksia Park International HS</cell>
                <cell>1,485</cell>
                <cell>4,496</cell>
                <cell>2,872</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Belair Primary School</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Black Forest Primary School</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Blackwood High School</cell>
                <cell>1,067</cell>
                <cell>5,003</cell>
                <cell>2,433</cell>
                <cell>356</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Brighton Primary School</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Ceduna Area School</cell>
                <cell>500</cell>
                <cell>2,700</cell>
                <cell>700</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Charles Campbell College</cell>
                <cell>4,794</cell>
                <cell>6,008</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Christies Beach HS &amp; Sth Voc College</cell>
                <cell>1,300</cell>
                <cell>4,200</cell>
                <cell>2,200</cell>
                <cell>150</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Clare High School</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Craigmore High School</cell>
                <cell>1,488</cell>
                <cell>5,580</cell>
                <cell>4,141</cell>
                <cell>674</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Cummins Area School</cell>
                <cell>500</cell>
                <cell>2,700</cell>
                <cell>700</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—East Marden Primary School</cell>
                <cell>595</cell>
                <cell>3,000</cell>
                <cell>3,000</cell>
                <cell>900</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Eastern Fleurieu R-12 School</cell>
                <cell>1,034</cell>
                <cell>706</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Elizabeth North Primary School</cell>
                <cell>—</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Elizabeth Vale Primary School</cell>
                <cell>595</cell>
                <cell>3,000</cell>
                <cell>3,000</cell>
                <cell>900</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Findon High School</cell>
                <cell>1,893</cell>
                <cell>5,000</cell>
                <cell>2,900</cell>
                <cell>200</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Fregon Anangu School</cell>
                <cell>5,000</cell>
                <cell>8,300</cell>
                <cell>2,200</cell>
                <cell>100</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Gawler and District College B-12</cell>
                <cell>1,613</cell>
                <cell>4,880</cell>
                <cell>3,049</cell>
                <cell>271</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Glenelg Primary School</cell>
                <cell>—</cell>
                <cell>145</cell>
                <cell>1,100</cell>
                <cell>4,000</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Glenunga International High School</cell>
                <cell>1,812</cell>
                <cell>15,025</cell>
                <cell>12,127</cell>
                <cell>122</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Golden Grove High School</cell>
                <cell>2,140</cell>
                <cell>5,160</cell>
                <cell>4,147</cell>
                <cell>300</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Golden Grove Primary School</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>115</cell>
                <cell>1,000</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Grange Primary School</cell>
                <cell>115</cell>
                <cell>1,000</cell>
                <cell>3,600</cell>
                <cell>1,280</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Grant High School</cell>
                <cell>1,082</cell>
                <cell>4,002</cell>
                <cell>1,617</cell>
                <cell>153</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Greenwith Primary School</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Hallett Cove School</cell>
                <cell>1,706</cell>
                <cell>5,020</cell>
                <cell>2,874</cell>
                <cell>206</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Hamilton Secondary College</cell>
                <cell>1,500</cell>
                <cell>4,500</cell>
                <cell>2,850</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Heathfield High School</cell>
                <cell>1,441</cell>
                <cell>5,633</cell>
                <cell>2,366</cell>
                <cell>234</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Henley High School</cell>
                <cell>2,236</cell>
                <cell>5,501</cell>
                <cell>3,521</cell>
                <cell>565</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Highgate School</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—John Pirie Secondary School</cell>
                <cell>1,700</cell>
                <cell>5,000</cell>
                <cell>2,900</cell>
                <cell>200</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Kadina Memorial School</cell>
                <cell>670</cell>
                <cell>2,100</cell>
                <cell>150</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Kapunda High School</cell>
                <cell>3,091</cell>
                <cell>5,606</cell>
                <cell>4,666</cell>
                <cell>1,480</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Kingston Community School</cell>
                <cell>500</cell>
                <cell>2,700</cell>
                <cell>700</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Le Fevre High School</cell>
                <cell>1,750</cell>
                <cell>190</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Loxton High School</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Magill School</cell>
                <cell>145</cell>
                <cell>1,100</cell>
                <cell>4,000</cell>
                <cell>1,750</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Mannum Community College</cell>
                <cell>55</cell>
                <cell>1,750</cell>
                <cell>190</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Mark Oliphant College (B-12)</cell>
                <cell>1,026</cell>
                <cell>1,504</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Mawson Lakes School</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>115</cell>
                <cell>1,000</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Mitcham Girls High School</cell>
                <cell>785</cell>
                <cell>3,007</cell>
                <cell>1,112</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Mitcham Primary School</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Modbury High School</cell>
                <cell>1,100</cell>
                <cell>4,000</cell>
                <cell>1,600</cell>
                <cell>150</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Moonta Area School</cell>
                <cell>500</cell>
                <cell>2,700</cell>
                <cell>700</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Mount Barker High School</cell>
                <cell>1,000</cell>
                <cell>3,600</cell>
                <cell>1,160</cell>
                <cell>120</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Mount Barker Primary School</cell>
                <cell>3,000</cell>
                <cell>3,000</cell>
                <cell>900</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Mount Compass Area School</cell>
                <cell>603</cell>
                <cell>3,539</cell>
                <cell>2,750</cell>
                <cell>948</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Mount Gambier High School</cell>
                <cell>981</cell>
                <cell>3,609</cell>
                <cell>1,175</cell>
                <cell>122</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Murray Bridge High School</cell>
                <cell>5,700</cell>
                <cell>9,700</cell>
                <cell>4,300</cell>
                <cell>200</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Murray Bridge North School</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Naracoorte High School</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Norwood Morialta High School</cell>
                <cell>3,398</cell>
                <cell>12,289</cell>
                <cell>20,099</cell>
                <cell>3,866</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Nuriootpa High School</cell>
                <cell>507</cell>
                <cell>2,917</cell>
                <cell>910</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Nuriootpa Primary School</cell>
                <cell>3,000</cell>
                <cell>3,000</cell>
                <cell>900</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Ocean View P-12 College</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Para Hills High School</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Parafield Gardens High School</cell>
                <cell>1,700</cell>
                <cell>5,000</cell>
                <cell>2,900</cell>
                <cell>200</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Parafield Gardens R-7 School</cell>
                <cell>115</cell>
                <cell>1,000</cell>
                <cell>3,600</cell>
                <cell>1,280</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Paralowie School</cell>
                <cell>3,968</cell>
                <cell>4,049</cell>
                <cell>3,396</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Playford International College</cell>
                <cell>3,313</cell>
                <cell>11,069</cell>
                <cell>838</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Plympton International College</cell>
                <cell>670</cell>
                <cell>2,100</cell>
                <cell>150</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Port Augusta Secondary School</cell>
                <cell>506</cell>
                <cell>2,916</cell>
                <cell>1,094</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Port Lincoln High School</cell>
                <cell>1,138</cell>
                <cell>5,257</cell>
                <cell>8,016</cell>
                <cell>553</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Reidy Park Primary School</cell>
                <cell>—</cell>
                <cell>94</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Renmark High School</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Reynella East College</cell>
                <cell>1,690</cell>
                <cell>4,997</cell>
                <cell>2,914</cell>
                <cell>201</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Roma Mitchell Secondary College</cell>
                <cell>542</cell>
                <cell>6,957</cell>
                <cell>7,644</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Roxby Downs Area School</cell>
                <cell>1,100</cell>
                <cell>4,000</cell>
                <cell>1,600</cell>
                <cell>150</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Salisbury High School</cell>
                <cell>1,663</cell>
                <cell>4,989</cell>
                <cell>2,952</cell>
                <cell>204</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Seaford Secondary College</cell>
                <cell>1,300</cell>
                <cell>4,200</cell>
                <cell>2,200</cell>
                <cell>150</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Seaton High School</cell>
                <cell>5,628</cell>
                <cell>8,818</cell>
                <cell>4,809</cell>
                <cell>703</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Seaview High School</cell>
                <cell>1,821</cell>
                <cell>7,283</cell>
                <cell>2,841</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Settlers Farm Campus R-7</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>95</cell>
                <cell>800</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Springbank Secondary College</cell>
                <cell>1,893</cell>
                <cell>5,000</cell>
                <cell>2,900</cell>
                <cell>200</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Stradbroke School</cell>
                <cell>145</cell>
                <cell>1,100</cell>
                <cell>4,000</cell>
                <cell>1,750</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—The Heights School</cell>
                <cell>1,670</cell>
                <cell>4,991</cell>
                <cell>2,942</cell>
                <cell>203</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Trinity Gardens School</cell>
                <cell>115</cell>
                <cell>1,000</cell>
                <cell>3,600</cell>
                <cell>1,280</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Underdale High School</cell>
                <cell>5,700</cell>
                <cell>9,700</cell>
                <cell>4,300</cell>
                <cell>200</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Urrbrae Agricultural High School</cell>
                <cell>1,668</cell>
                <cell>4,989</cell>
                <cell>2,945</cell>
                <cell>204</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Victor Harbor R-7 School</cell>
                <cell>800</cell>
                <cell>3,000</cell>
                <cell>1,100</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Warradale Primary School</cell>
                <cell>595</cell>
                <cell>3,000</cell>
                <cell>2,999</cell>
                <cell>900</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—West Lakes Shore School R-7</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>94</cell>
                <cell>800</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Westbourne Park Primary School</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>94</cell>
                <cell>800</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Willunga High School</cell>
                <cell>1,750</cell>
                <cell>190</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Wirreanda Secondary School</cell>
                <cell>2,347</cell>
                <cell>5,484</cell>
                <cell>3,030</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Woodcroft Primary School</cell>
                <cell>—</cell>
                <cell>115</cell>
                <cell>999</cell>
                <cell>2,749</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Woodend Primary School</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>94</cell>
                <cell>800</cell>
                <cell />
              </row>
              <row>
                <cell>Sust Schl—Woodville High School</cell>
                <cell>1,655</cell>
                <cell>4,952</cell>
                <cell>2,973</cell>
                <cell>227</cell>
                <cell />
              </row>
              <row>
                <cell>Voluntary Amalgamations</cell>
                <cell>11,150</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Site Funded Works</cell>
                <cell>1,500</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Children's Centres—Stage 2</cell>
                <cell>500</cell>
                <cell>1,240</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>National Quality Agenda—Compliance</cell>
                <cell>2,300</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>SACE Modernisation</cell>
                <cell>1,781</cell>
                <cell>1,460</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Science Technology Engineering and Mathematics Facilities in Schools (STEM)</cell>
                <cell>6,422</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Whyalla Secondary Education Renewal</cell>
                <cell>17,000</cell>
                <cell>60,000</cell>
                <cell>22,000</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Adelaide High School</cell>
                <cell>1,144</cell>
                <cell>9,302</cell>
                <cell>7,502</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Brighton Secondary School</cell>
                <cell>936</cell>
                <cell>7,139</cell>
                <cell>5,716</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Glossop High School Redevelopment</cell>
                <cell>3,500</cell>
                <cell>10,000</cell>
                <cell>3,462</cell>
                <cell>120</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>School Bus Replacement</cell>
                <cell>1,240</cell>
                <cell>1,271</cell>
                <cell>1,303</cell>
                <cell>1,336</cell>
                <cell />
              </row>
              <row>
                <cell>Major Feasibility Studies</cell>
                <cell>494</cell>
                <cell>506</cell>
                <cell>519</cell>
                <cell>532</cell>
                <cell />
              </row>
              <row>
                <cell>Capital Works Assistance Scheme—Investing</cell>
                <cell>3,004</cell>
                <cell>3,081</cell>
                <cell>3,517</cell>
                <cell>3,605</cell>
                <cell />
              </row>
              <row>
                <cell>Purchase of Land and Property</cell>
                <cell>1,241</cell>
                <cell>1,272</cell>
                <cell>1,304</cell>
                <cell>1,337</cell>
                <cell />
              </row>
              <row>
                <cell>SACE Board</cell>
                <cell>121</cell>
                <cell>124</cell>
                <cell>127</cell>
                <cell>130</cell>
                <cell />
              </row>
              <row>
                <cell>Emergency Repairs—Investing</cell>
                <cell>225</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
            </table>
          </inserted>
        </text>
        <text id="201909113a05e1534cf0444480001938" />
        <text id="201909113a05e1534cf0444480001939">
          <inserted>
            <table>
              <rowtitle>
                <cell colspan="2">Agency/Title</cell>
                <cell>2019–20 Budget</cell>
                <cell>2020–21 Estimate</cell>
                <cell>2021–22 Estimate</cell>
                <cell>2022–23 Estimate</cell>
              </rowtitle>
              <row>
                <cell colspan="2">TAFE SA</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Purchase of TAFE Sites</cell>
                <cell>619,293</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Purchase of Plant and Equipment—TAFE SA</cell>
                <cell>1,583</cell>
                <cell>1,714</cell>
                <cell>1,757</cell>
                <cell>1,801</cell>
                <cell />
              </row>
              <row>
                <cell>IT Systems and Infrastructure—TAFE SA</cell>
                <cell>970</cell>
                <cell>1,051</cell>
                <cell>1,077</cell>
                <cell>1,104</cell>
                <cell />
              </row>
              <row>
                <cell>Campus Maintenance</cell>
                <cell>7,101</cell>
                <cell>8,436</cell>
                <cell>8,649</cell>
                <cell>8,866</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Energy and Mining</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Remote Area Energy Supply—Future Sustainability</cell>
                <cell>2,403</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>RAES scheme power generation and distribution equipment</cell>
                <cell>1,873</cell>
                <cell>1,942</cell>
                <cell>1,992</cell>
                <cell>2,042</cell>
                <cell />
              </row>
              <row>
                <cell>Minerals Asset Upgrade and Replacement</cell>
                <cell>191</cell>
                <cell>250</cell>
                <cell>255</cell>
                <cell>262</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Environment and Water</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>South Australian Riverland Floodplains Integrated Infrastructure Program (SARFIIP)</cell>
                <cell>57,447</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Monarto Land</cell>
                <cell>293</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Glenthorne National Park</cell>
                <cell>3,200</cell>
                <cell>3,200</cell>
                <cell>1,600</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Waterfall Gully Summit Trail</cell>
                <cell>2,030</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Opening Up SAs Reservoirs</cell>
                <cell>4,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Water Management Solutions</cell>
                <cell>4,200</cell>
                <cell>800</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Flows for the Future</cell>
                <cell>1,056</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Great Southern Ocean Walk</cell>
                <cell>228</cell>
                <cell>2,558</cell>
                <cell>2,214</cell>
                <cell>1,000</cell>
                <cell />
              </row>
              <row>
                <cell>Securing the future of our metropolitan coastline</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>12,000</cell>
                <cell>12,000</cell>
                <cell />
              </row>
              <row>
                <cell>Park renewal investment</cell>
                <cell>200</cell>
                <cell>938</cell>
                <cell>1,162</cell>
                <cell>1,000</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>4,815</cell>
                <cell>5,885</cell>
                <cell>6,008</cell>
                <cell>5,141</cell>
                <cell />
              </row>
              <row>
                <cell>Water Monitoring Equipment</cell>
                <cell>2,030</cell>
                <cell>2,086</cell>
                <cell>2,143</cell>
                <cell>2,196</cell>
                <cell />
              </row>
              <row>
                <cell>Fire Management on Public Land—Enhanced Capabilities</cell>
                <cell>1,057</cell>
                <cell>1,086</cell>
                <cell>1,116</cell>
                <cell>1,144</cell>
                <cell />
              </row>
              <row>
                <cell>South Eastern Water Conservation and Drainage Board</cell>
                <cell>484</cell>
                <cell>496</cell>
                <cell>509</cell>
                <cell>522</cell>
                <cell />
              </row>
              <row>
                <cell>Adelaide &amp; Mt Lofty Ranges NRMB</cell>
                <cell>150</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Environment Protection Authority</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Material flow and levy information system</cell>
                <cell>1,239</cell>
                <cell>100</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>576</cell>
                <cell>623</cell>
                <cell>639</cell>
                <cell>655</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">SA Water</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>North Lefevre Peninsula Waste Water Diversion</cell>
                <cell>336</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Aldinga Wastewater Treatment Plant Upgrade Stage 2</cell>
                <cell>69</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Warooka and Point Turton Water Supply Upgrade</cell>
                <cell>12</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Kangaroo Creek Dam Safety</cell>
                <cell>16,229</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Tailem Bend Keith Pipeline Coomandook Tank Additional Storage</cell>
                <cell>26</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Mount Bold Dam Safety</cell>
                <cell>1,296</cell>
                <cell>22,823</cell>
                <cell>23,394</cell>
                <cell>23,978</cell>
                <cell />
              </row>
              <row>
                <cell>Purchase water entitlements to the minister and the River Murray</cell>
                <cell>900</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Mt Barker Development Water Supply Scheme—Stage 1</cell>
                <cell>60</cell>
                <cell>950</cell>
                <cell>950</cell>
                <cell>950</cell>
                <cell />
              </row>
              <row>
                <cell>Murray Bridge Wastewater Treatment Plant Relocation</cell>
                <cell>12,131</cell>
                <cell>105</cell>
                <cell>179</cell>
                <cell>220</cell>
                <cell />
              </row>
              <row>
                <cell>Hahndorf Wastewater Treatment Plant Inlet Screen Upgrade</cell>
                <cell>55</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Port Lincoln Wastewater Treatment Plant</cell>
                <cell>12,450</cell>
                <cell>284</cell>
                <cell>485</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Orroroo Water Quality Improvement</cell>
                <cell>50</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Hope Valley EL170 Tank Structure Renewal</cell>
                <cell>50</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Myponga Trunk Main</cell>
                <cell>1,452</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Bolivar Wastewater Treatment Plant Capacity Upgrade</cell>
                <cell>50</cell>
                <cell>3,717</cell>
                <cell>6,349</cell>
                <cell>7,810</cell>
                <cell />
              </row>
              <row>
                <cell>Bolivar ASR SCADA Controls Upgrade Stage 2</cell>
                <cell>627</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Baroota Dam Safety</cell>
                <cell>2,929</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Bolivar Dissolved Air Floated Filtration Plant Controls Upgrade</cell>
                <cell>1,911</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Northern Connector Project</cell>
                <cell>274</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Northern Adelaide Irrigation Scheme</cell>
                <cell>49,597</cell>
                <cell>1,000</cell>
                <cell>912</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Bolivar Wastewater Treatment Plant Clarifier Upgrade</cell>
                <cell>5,693</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Zero Cost Energy Future</cell>
                <cell>289,179</cell>
                <cell>52,076</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Water Quality Management</cell>
                <cell>12,333</cell>
                <cell>13,432</cell>
                <cell>13,724</cell>
                <cell>14,066</cell>
                <cell />
              </row>
              <row>
                <cell>Environmental Improvement</cell>
                <cell>6,017</cell>
                <cell>18,000</cell>
                <cell>13,464</cell>
                <cell>13,268</cell>
                <cell />
              </row>
              <row>
                <cell>Information Technology</cell>
                <cell>34,404</cell>
                <cell>40,670</cell>
                <cell>34,856</cell>
                <cell>34,856</cell>
                <cell />
              </row>
              <row>
                <cell>Safety</cell>
                <cell>25,832</cell>
                <cell>27,692</cell>
                <cell>28,311</cell>
                <cell>29,020</cell>
                <cell />
              </row>
              <row>
                <cell>Mechanical and Electrical Renewal</cell>
                <cell>21,913</cell>
                <cell>42,666</cell>
                <cell>43,711</cell>
                <cell>44,805</cell>
                <cell />
              </row>
              <row>
                <cell>Pipe Network Renewal</cell>
                <cell>28,462</cell>
                <cell>35,756</cell>
                <cell>36,669</cell>
                <cell>37,587</cell>
                <cell />
              </row>
              <row>
                <cell>Structures</cell>
                <cell>30,884</cell>
                <cell>58,093</cell>
                <cell>59,550</cell>
                <cell>61,039</cell>
                <cell />
              </row>
              <row>
                <cell>Asset Renewal</cell>
                <cell>10,863</cell>
                <cell>10,660</cell>
                <cell>10,921</cell>
                <cell>11,193</cell>
                <cell />
              </row>
              <row>
                <cell>Network Extension</cell>
                <cell>33,248</cell>
                <cell>39,013</cell>
                <cell>39,794</cell>
                <cell>42,983</cell>
                <cell />
              </row>
              <row>
                <cell>Networks Growth</cell>
                <cell>10,002</cell>
                <cell>9,114</cell>
                <cell>9,760</cell>
                <cell>10,004</cell>
                <cell />
              </row>
              <row>
                <cell>Treatment Plant Growth</cell>
                <cell>2,992</cell>
                <cell>3,735</cell>
                <cell>3,727</cell>
                <cell>3,820</cell>
                <cell />
              </row>
              <row>
                <cell>Service Reliability Management</cell>
                <cell>2,694</cell>
                <cell>4,792</cell>
                <cell>4,906</cell>
                <cell>5,028</cell>
                <cell />
              </row>
              <row>
                <cell>Water Resource Sustainability</cell>
                <cell>92</cell>
                <cell>592</cell>
                <cell>607</cell>
                <cell>622</cell>
                <cell />
              </row>
              <row>
                <cell>Major and Minor Plant</cell>
                <cell>5,201</cell>
                <cell>4,767</cell>
                <cell>4,884</cell>
                <cell>5,007</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Health and Wellbeing</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Upgrade to existing Women's and Children's Hospital</cell>
                <cell>23,000</cell>
                <cell>20,100</cell>
                <cell>3,809</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Flinders Medical Centre—Neonatal Unit</cell>
                <cell>819</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>SA Health Supply Distribution Centre</cell>
                <cell>7,320</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Flinders Medical Centre Redevelopment</cell>
                <cell>100</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Modbury Hospital Redevelopment</cell>
                <cell>6,210</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Lyell McEwin Hospital Redevelopment</cell>
                <cell>71</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Lyell McEwin Hospital Emergency Department Expansion</cell>
                <cell>12,000</cell>
                <cell>26,842</cell>
                <cell>14,500</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>The Queen Elizabeth Hospital Redevelopment Stage 3</cell>
                <cell>63,158</cell>
                <cell>91,700</cell>
                <cell>85,080</cell>
                <cell>2,052</cell>
                <cell />
              </row>
              <row>
                <cell>SA Pathology consolidation into Frome Rd</cell>
                <cell>14,073</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Country Health SA Sustainment and Compliance</cell>
                <cell>15,960</cell>
                <cell>14,200</cell>
                <cell>14,000</cell>
                <cell>14,000</cell>
                <cell />
              </row>
              <row>
                <cell>Borderline Personality Disorder Centre of Excellence—fit out</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Modbury Hospital—Upgrades and Additional Services</cell>
                <cell>31,791</cell>
                <cell>39,668</cell>
                <cell>18,000</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>SAAS Headquarters Internal Fitout</cell>
                <cell>1,380</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Mount Gambier Renal Dialysis</cell>
                <cell>1,650</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Yorketown Surgical Services</cell>
                <cell>100</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Lighthouse Lodge Kingston—Safety Upgrades</cell>
                <cell>600</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Murray Bridge Emergency Department</cell>
                <cell>4,000</cell>
                <cell>3,250</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Strathalbyn Aged Care</cell>
                <cell>10,500</cell>
                <cell>2,100</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Enterprise Cancer Prescribing System</cell>
                <cell>9,512</cell>
                <cell>4,000</cell>
                <cell>5,034</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Real Time Monitoring of Prescription Medicine</cell>
                <cell>4,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>SAAS Volunteer Training Infrastructure</cell>
                <cell>871</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Repatriation Health Precinct Reactivation</cell>
                <cell>26,075</cell>
                <cell>20,000</cell>
                <cell>21,000</cell>
                <cell>2,000</cell>
                <cell />
              </row>
              <row>
                <cell>Mount Barker Hospital Emergency Department</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>3,000</cell>
                <cell>5,600</cell>
                <cell />
              </row>
              <row>
                <cell>Citi Centre fit out</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>991</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>SA Ambulance Service—Medical Equipment Replacement</cell>
                <cell>3,002</cell>
                <cell>3,077</cell>
                <cell>3,154</cell>
                <cell>3,233</cell>
                <cell />
              </row>
              <row>
                <cell>SA Ambulance Service—Vehicle Replacement</cell>
                <cell>9,003</cell>
                <cell>6,399</cell>
                <cell>6,559</cell>
                <cell>6,723</cell>
                <cell />
              </row>
              <row>
                <cell>Hospitals and Health Units—Minor Works</cell>
                <cell>14,058</cell>
                <cell>17,548</cell>
                <cell>16,645</cell>
                <cell>20,736</cell>
                <cell />
              </row>
              <row>
                <cell>Bio-Medical Equipment</cell>
                <cell>17,674</cell>
                <cell>18,166</cell>
                <cell>18,153</cell>
                <cell>21,187</cell>
                <cell />
              </row>
              <row>
                <cell>SA Ambulance Service—Plant and Equipment</cell>
                <cell>948</cell>
                <cell>972</cell>
                <cell>996</cell>
                <cell>1,021</cell>
                <cell />
              </row>
              <row>
                <cell>Purchases from Special Purpose Funds—Capital Grants</cell>
                <cell>5,000</cell>
                <cell>5,000</cell>
                <cell>5,000</cell>
                <cell>5,000</cell>
                <cell />
              </row>
              <row>
                <cell>Volunteer Ambulance Stations</cell>
                <cell>3,160</cell>
                <cell>2,624</cell>
                <cell>2,690</cell>
                <cell>2,757</cell>
                <cell />
              </row>
              <row>
                <cell>Purchases from Special Purpose Funds—Other</cell>
                <cell>81</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Human Services</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Riverside Building—Office fitout</cell>
                <cell>5,381</cell>
                <cell>3,458</cell>
                <cell>3,161</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Adelaide Youth Training Centre—Sustainment</cell>
                <cell>522</cell>
                <cell>535</cell>
                <cell>548</cell>
                <cell>562</cell>
                <cell />
              </row>
              <row>
                <cell>Equipment Services</cell>
                <cell>1,249</cell>
                <cell>1,280</cell>
                <cell>1,312</cell>
                <cell>1,345</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">South Australian Housing Authority</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Remote Indigenous Housing</cell>
                <cell>17,709</cell>
                <cell>6,982</cell>
                <cell>7,157</cell>
                <cell>7,338</cell>
                <cell />
              </row>
              <row>
                <cell>Playford North Urban Renewal</cell>
                <cell>9,285</cell>
                <cell>8,474</cell>
                <cell>6,737</cell>
                <cell>7,055</cell>
                <cell />
              </row>
              <row>
                <cell>Minor Projects—SAHT</cell>
                <cell>3,391</cell>
                <cell>3,240</cell>
                <cell>3,240</cell>
                <cell>3,240</cell>
                <cell />
              </row>
              <row>
                <cell>Better Neighbourhoods Program</cell>
                <cell>43,516</cell>
                <cell>14,377</cell>
                <cell>15,000</cell>
                <cell>15,000</cell>
                <cell />
              </row>
              <row>
                <cell>Land Development at Sheffield Crescent, Blair Athol</cell>
                <cell>289</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Public Housing Stimulus</cell>
                <cell>1,403</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Economic Stimulus—construction of social housing<sup>(1)</sup></cell>
                <cell>13,678</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Morphettville Neighbourhood Renewal Project</cell>
                <cell>6,372</cell>
                <cell>11,759</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Business Systems Transformation</cell>
                <cell>12,881</cell>
                <cell>9,272</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Pleasant Avenue Apartments, South Plympton</cell>
                <cell>5,500</cell>
                <cell>3,456</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Domestic Violence Package—Forty new crisis accommodation rooms</cell>
                <cell>2,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Housing Stimulus Package—Preventative maintenance and upgrade</cell>
                <cell>21,118</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Housing Stimulus Package—affordable housing construction</cell>
                <cell>17,139</cell>
                <cell>4,285</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Public Housing Capital Maintenance</cell>
                <cell>13,550</cell>
                <cell>13,550</cell>
                <cell>13,550</cell>
                <cell>13,550</cell>
                <cell />
              </row>
              <row>
                <cell>Aboriginal Housing Capital Program</cell>
                <cell>3,200</cell>
                <cell>3,200</cell>
                <cell>3,200</cell>
                <cell>3,200</cell>
                <cell />
              </row>
              <row>
                <cell>Public Housing Construction and Acquisition</cell>
                <cell>6,241</cell>
                <cell>6,000</cell>
                <cell>6,000</cell>
                <cell>6,000</cell>
                <cell />
              </row>
              <row>
                <cell>SAHT Management Capital</cell>
                <cell>2,401</cell>
                <cell>3,350</cell>
                <cell>3,400</cell>
                <cell>3,450</cell>
                <cell />
              </row>
              <row>
                <cell>Community Housing Capital Program</cell>
                <cell>2,792</cell>
                <cell>6,000</cell>
                <cell>6,000</cell>
                <cell>6,000</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Innovation and Skills</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Annual Investing Programs</cell>
                <cell>7,389</cell>
                <cell>6,289</cell>
                <cell>6,444</cell>
                <cell>6,604</cell>
                <cell />
              </row>
              <row>
                <cell>IT Systems and Infrastructure</cell>
                <cell>940</cell>
                <cell>975</cell>
                <cell>1,001</cell>
                <cell>1,025</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Correctional Services</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Adelaide Women's Prison- Additional Prisoner Accommodation—40 beds and Infrastructure Upgrade</cell>
                <cell>3,800</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Adelaide Remand Centre—Cell Upgrade</cell>
                <cell>3,200</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>2,812</cell>
                <cell>3,044</cell>
                <cell>3,120</cell>
                <cell>3,198</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Emergency Services—CFS</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Station Upgrades</cell>
                <cell>2,500</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Capital Works, Vehicles and Equipment—CFS</cell>
                <cell>15,593</cell>
                <cell>15,983</cell>
                <cell>16,383</cell>
                <cell>16,793</cell>
                <cell />
              </row>
              <row>
                <cell>Replacement of telecommunications equipment—CFS</cell>
                <cell>1,882</cell>
                <cell>1,929</cell>
                <cell>1,977</cell>
                <cell>2,026</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Emergency Services—MFS</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Capital Works, Vehicles and Equipment—MFS</cell>
                <cell>6,117</cell>
                <cell>9,551</cell>
                <cell>7,996</cell>
                <cell>8,196</cell>
                <cell />
              </row>
              <row>
                <cell>Replacement of telecommunications equipment—MFS</cell>
                <cell>221</cell>
                <cell>227</cell>
                <cell>233</cell>
                <cell>238</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Emergency Services—SAFECOM</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Alert SA Replacement</cell>
                <cell>144</cell>
                <cell>147</cell>
                <cell>151</cell>
                <cell>155</cell>
                <cell />
              </row>
              <row>
                <cell>New Emergency Services Headquarters</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>14,178</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>-500</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Emergency Services—SES</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Capital Works, Vehicles, Vessels and Rescue Equipment—SES</cell>
                <cell>4,341</cell>
                <cell>4,443</cell>
                <cell>4,548</cell>
                <cell>4,656</cell>
                <cell />
              </row>
              <row>
                <cell>Replacement of telecommunications equipment—SES</cell>
                <cell>427</cell>
                <cell>438</cell>
                <cell>449</cell>
                <cell>460</cell>
                <cell />
              </row>
            </table>
          </inserted>
        </text>
        <text id="201909113a05e1534cf0444480001940" />
        <text id="201909113a05e1534cf0444480001941">
          <inserted>
            <table>
              <rowtitle>
                <cell colspan="2">Agency/Title</cell>
                <cell>2019–20 Budget</cell>
                <cell>2020–21 Estimate</cell>
                <cell>2021–22 Estimate</cell>
                <cell>2022–23 Estimate</cell>
              </rowtitle>
              <row>
                <cell colspan="2">Police</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Hi-tech Crime Fighting Equipment</cell>
                <cell>200</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Police Records Management System—Stages 2 to 4</cell>
                <cell>4,153</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Crime Tracking App</cell>
                <cell>214</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Data Entry Devices</cell>
                <cell>547</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Continuous Monitoring of Screening</cell>
                <cell>414</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Umuwa Police Station—Multi Agency Facility</cell>
                <cell>1,712</cell>
                <cell>856</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Firearms Control System</cell>
                <cell>3,903</cell>
                <cell>968</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>SAPOL Communications Centre Upgrade</cell>
                <cell>—</cell>
                <cell>4,992</cell>
                <cell>4,992</cell>
                <cell>6,490</cell>
                <cell />
              </row>
              <row>
                <cell>Expiation Notice Branch System Replacement</cell>
                <cell>579</cell>
                <cell>2,653</cell>
                <cell>2,595</cell>
                <cell>1,898</cell>
                <cell />
              </row>
              <row>
                <cell>Fitout for Angas Street HQ</cell>
                <cell>1,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works, Vehicles and Equipment</cell>
                <cell>9,496</cell>
                <cell>10,360</cell>
                <cell>10,621</cell>
                <cell>11,654</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Primary Industries and Regions</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>5,429</cell>
                <cell>5,657</cell>
                <cell>5,534</cell>
                <cell>5,647</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Forestry SA</cell>
                <cell>260</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Plant and Equipment, Roadworks</cell>
                <cell>195</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Annual Program Forestry SA</cell>
                <cell>65</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Tourism</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>649</cell>
                <cell>702</cell>
                <cell>720</cell>
                <cell>738</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Adelaide Venue Management Corporation</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>7,000</cell>
                <cell>7,175</cell>
                <cell>7,354</cell>
                <cell>7,538</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Planning, Transport and Infrastructure<sup>(1)</sup></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Bus Fleet Replacement Program</cell>
                <cell>18,765</cell>
                <cell>19,234</cell>
                <cell>19,715</cell>
                <cell>20,208</cell>
                <cell />
              </row>
              <row>
                <cell>Northern Expressway</cell>
                <cell>400</cell>
                <cell>422</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Upgrading the Sturt Highway</cell>
                <cell>470</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Increased Detection of Unregistered/Uninsured Vehicles</cell>
                <cell>1,091</cell>
                <cell>623</cell>
                <cell>639</cell>
                <cell>655</cell>
                <cell />
              </row>
              <row>
                <cell>South Road Superway</cell>
                <cell>2,000</cell>
                <cell>5,073</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Adelaide Oval—Redevelopment</cell>
                <cell>900</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Public Transport Park'n'Ride Interchanges</cell>
                <cell>900</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>South Road Upgrade from Torrens Road to River Torrens</cell>
                <cell>4,500</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Managed Motorways on the South Eastern Freeway</cell>
                <cell>11,894</cell>
                <cell>919</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Adelaide Hills Priority Program</cell>
                <cell>500</cell>
                <cell>377</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Gawler Line Electrification Project</cell>
                <cell>296,750</cell>
                <cell>93,077</cell>
                <cell>45,000</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>North–South Corridor Darlington Upgrade</cell>
                <cell>96,805</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Adelaide Festival Centre Precinct—Plaza &amp; Integration</cell>
                <cell>5,000</cell>
                <cell>25,000</cell>
                <cell>30,000</cell>
                <cell>10,360</cell>
                <cell />
              </row>
              <row>
                <cell>Adelaide Festival Centre Precinct—Car Park</cell>
                <cell>—</cell>
                <cell>30,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Improving critical road infrastructure</cell>
                <cell>1,700</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Gawler East Collector Link</cell>
                <cell>4,668</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Northern Connector</cell>
                <cell>129,346</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Port Stanvac Wharf and Foreshore</cell>
                <cell>6,407</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Extension of the Tonsley rail line to the Flinders Medical Centre</cell>
                <cell>89,882</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Planning Reform Implementation</cell>
                <cell>7,735</cell>
                <cell>554</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Leigh Creek Capital Program</cell>
                <cell>300</cell>
                <cell>300</cell>
                <cell>400</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>10 New Safety Cameras</cell>
                <cell>849</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Oaklands Crossing</cell>
                <cell>35,515</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Mitcham Hills Road Corridor</cell>
                <cell>5,000</cell>
                <cell>5,000</cell>
                <cell>3,000</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Main South Road Duplication from Seaford to Aldinga.</cell>
                <cell>23,000</cell>
                <cell>75,000</cell>
                <cell>164,000</cell>
                <cell>41,000</cell>
                <cell />
              </row>
              <row>
                <cell>Golden Grove Road Upgrade</cell>
                <cell>14,800</cell>
                <cell>3,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Port Road / West Lakes Boulevard / Cheltenham Parade intersection upgrade</cell>
                <cell>5,598</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Main North Road with Tulloch Road intersection upgrade</cell>
                <cell>5,324</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>North East Road and South Para Left Turn Slip Lane</cell>
                <cell>980</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Duplication of Joy Baluch AM Bridge</cell>
                <cell>40,000</cell>
                <cell>108,000</cell>
                <cell>49,785</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Overpass at Port Wakefield Road</cell>
                <cell>15,000</cell>
                <cell>66,500</cell>
                <cell>6,500</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Flagstaff Road widening</cell>
                <cell>—</cell>
                <cell>750</cell>
                <cell>5,630</cell>
                <cell>25,100</cell>
                <cell />
              </row>
              <row>
                <cell>Fix Candy Road and South Road Intersection</cell>
                <cell>5,130</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Penola Bypass</cell>
                <cell>14,100</cell>
                <cell>200</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Torrens Street and Crozier Road roundabout</cell>
                <cell>540</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>North-South Corridor Regency Road to Pym Street</cell>
                <cell>38,200</cell>
                <cell>141,100</cell>
                <cell>118,800</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Cape Jervis Breakwater Extension</cell>
                <cell>1,920</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Southern Expressway Throw Screens</cell>
                <cell>2,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>City South Tramline Replacement Project</cell>
                <cell>11,570</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Goodwood, Springbank and Daws Roads Intersection Upgrade</cell>
                <cell>5,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Portrush and Magill Roads Intersection Upgrade</cell>
                <cell>2,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Fullarton and Cross Roads Intersection Upgrades</cell>
                <cell>1,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Torrens Road, Ovingham level crossing upgrade</cell>
                <cell>11,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Main North, Kings and McIntyre Roads intersection upgrade</cell>
                <cell>2,000</cell>
                <cell>11,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Main North Road and Nottage Terrace intersection upgrade</cell>
                <cell>2,000</cell>
                <cell>5,000</cell>
                <cell>12,000</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Glen Osmond and Fullarton Roads intersection upgrade</cell>
                <cell>1,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Grand Junction, Hampstead and Briens Roads intersection upgrade</cell>
                <cell>2,000</cell>
                <cell>7,000</cell>
                <cell>10,000</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>North South Corridor Torrens River to Darlington</cell>
                <cell>30,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Thomas Foods International Facility</cell>
                <cell>7,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Dublin Saleyards Access</cell>
                <cell>7,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Naracoorte Roundabouts</cell>
                <cell>8,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Kroemers Crossing Roundabout</cell>
                <cell>6,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>New Tonsley Railway Station</cell>
                <cell>8,000</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Park n Ride Projects</cell>
                <cell>30,371</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Outback Communities Authority</cell>
                <cell>712</cell>
                <cell>1,393</cell>
                <cell>497</cell>
                <cell>502</cell>
                <cell />
              </row>
              <row>
                <cell>DPTI Annual Program</cell>
                <cell>138,784</cell>
                <cell>128,068</cell>
                <cell>129,688</cell>
                <cell>130,314</cell>
                <cell />
              </row>
              <row>
                <cell colspan="5">(1) A number of DPTI projects include expenditure currently budgeted in contingencies. As such, expenditure for some projects is larger than the amounts reflected for some projects above.</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Adelaide Cemeteries Authority</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Memorial Gardens—Enfield Memorial Park</cell>
                <cell>220</cell>
                <cell>330</cell>
                <cell>280</cell>
                <cell>-220</cell>
                <cell />
              </row>
              <row>
                <cell>Memorial Gardens—Smithfield Memorial Park</cell>
                <cell>135</cell>
                <cell>150</cell>
                <cell>100</cell>
                <cell>-30</cell>
                <cell />
              </row>
              <row>
                <cell>Recycled Water/Irrigation Infrastructure</cell>
                <cell>40</cell>
                <cell>170</cell>
                <cell>70</cell>
                <cell>-70</cell>
                <cell />
              </row>
              <row>
                <cell>Information Technology</cell>
                <cell>130</cell>
                <cell>140</cell>
                <cell>110</cell>
                <cell>100</cell>
                <cell />
              </row>
              <row>
                <cell>Memorial Gardens—Cheltenham Cemetery</cell>
                <cell>150</cell>
                <cell>200</cell>
                <cell>150</cell>
                <cell>-150</cell>
                <cell />
              </row>
              <row>
                <cell>Memorial Gardens—West Terrace Cemetery</cell>
                <cell>345</cell>
                <cell>35</cell>
                <cell>185</cell>
                <cell>-35</cell>
                <cell />
              </row>
              <row>
                <cell>Cheltenham Mausoleum</cell>
                <cell>200</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Enfield Mausoleum Stage 4</cell>
                <cell>800</cell>
                <cell>800</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Multi-Function Community Precinct—Enfield Memorial Park</cell>
                <cell>750</cell>
                <cell>5,888</cell>
                <cell>12,500</cell>
                <cell>5,862</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>359</cell>
                <cell>305</cell>
                <cell>179</cell>
                <cell>-186</cell>
                <cell />
              </row>
              <row>
                <cell colspan="4">South Australian Government Employee Residential Properties</cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Residential Properties</cell>
                <cell>7,011</cell>
                <cell>7,186</cell>
                <cell>7,366</cell>
                <cell>7,550</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Urban Renewal Authority</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Adelaide Station and Environs Redevelopment</cell>
                <cell>3,285</cell>
                <cell>1,646</cell>
                <cell>1,806</cell>
                <cell>814</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Plant and Equipment</cell>
                <cell>194</cell>
                <cell>80</cell>
                <cell>47</cell>
                <cell>81</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">West Beach Trust</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Roads and Car Parks</cell>
                <cell>800</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Replacement of swimming pool and an additional 9 cabins at Adelaide Shores Resort</cell>
                <cell>437</cell>
                <cell>1,313</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Reserves</cell>
                <cell>100</cell>
                <cell>300</cell>
                <cell>312</cell>
                <cell>320</cell>
                <cell />
              </row>
              <row>
                <cell>Corporate Services Office and Works Depot</cell>
                <cell>294</cell>
                <cell>400</cell>
                <cell>416</cell>
                <cell>428</cell>
                <cell />
              </row>
              <row>
                <cell>Caravan Park Accommodation and Facility Upgrades</cell>
                <cell>592</cell>
                <cell>800</cell>
                <cell>832</cell>
                <cell>854</cell>
                <cell />
              </row>
              <row>
                <cell>Resort Accommodation and Facility Upgrades</cell>
                <cell>614</cell>
                <cell>700</cell>
                <cell>728</cell>
                <cell>747</cell>
                <cell />
              </row>
              <row>
                <cell>Golf Course</cell>
                <cell>100</cell>
                <cell>150</cell>
                <cell>156</cell>
                <cell>160</cell>
                <cell />
              </row>
              <row>
                <cell>Boat Haven</cell>
                <cell>—</cell>
                <cell>150</cell>
                <cell>156</cell>
                <cell>160</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Treasury and Finance</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Major Project</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>RevenueSA—Revenue Information Online (RIO) Land Tax system update</cell>
                <cell>2,623</cell>
                <cell>875</cell>
                <cell>—</cell>
                <cell>—</cell>
                <cell />
              </row>
              <row>
                <cell>Shared Services—Masterpiece System</cell>
                <cell>—</cell>
                <cell>1,658</cell>
                <cell>—</cell>
                <cell>1,743</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>2,532</cell>
                <cell>1,639</cell>
                <cell>1,679</cell>
                <cell>1,721</cell>
                <cell />
              </row>
              <row>
                <cell>Revenue Information Online system (RIO)</cell>
                <cell>3,479</cell>
                <cell>337</cell>
                <cell>345</cell>
                <cell>354</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Lotteries Commission of SA</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Works—Plant and Equipment</cell>
                <cell>10</cell>
                <cell>10</cell>
                <cell>10</cell>
                <cell>10</cell>
                <cell />
              </row>
              <row>
                <cell colspan="2">Auditor-General</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell colspan="2">Annual Program</cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
                <cell></cell>
              </row>
              <row>
                <cell>Minor Capital Works and Equipment</cell>
                <cell>233</cell>
                <cell>239</cell>
                <cell>245</cell>
                <cell>251</cell>
                <cell />
              </row>
            </table>
          </inserted>
        </text>
        <text id="201909113a05e1534cf0444480001942" />
      </talker>
    </subject>
  </proceeding>
</hansard>