<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2017-11-16" />
  <sessionName>Fifty-Third Parliament, Second Session (53-2)</sessionName>
  <parliamentNum>53</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="12155" />
  <endPage num="12260" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Question Time</name>
    <subject>
      <name>Generators</name>
      <text id="20171116d13f15febf55481db0000477">
        <heading>Generators</heading>
      </text>
      <talker role="member" id="4342" kind="question">
        <name>Mr VAN HOLST PELLEKAAN</name>
        <house>House of Assembly</house>
        <electorate id="">Stuart</electorate>
        <questions>
          <question date="2017-11-16">
            <name>Generators</name>
          </question>
        </questions>
        <startTime time="2017-11-16T14:30:43" />
        <text id="20171116d13f15febf55481db0000478">
          <timeStamp time="2017-11-16T14:30:43" />
          <by role="member" id="4342">Mr VAN HOLST PELLEKAAN (Stuart) (14:30):</by>  Supplementary: given that the minister said that there will be approximately four hours of fuel for operating the generators, does that mean that after four hours—assuming the tanks are full at the start of the four hours—one full fuel tanker per hour will need to be delivered to the site and discharged to the site every hour?</text>
      </talker>
      <talker role="member" id="633" kind="answer">
        <name>The Hon. A. KOUTSANTONIS</name>
        <house>House of Assembly</house>
        <electorate id="">West Torrens</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Finance</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for State Development</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Mineral Resources and Energy</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2017-11-16">
            <name>Generators</name>
          </question>
        </questions>
        <startTime time="2017-11-16T14:31:10" />
        <text id="20171116d13f15febf55481db0000479">
          <timeStamp time="2017-11-16T14:31:10" />
          <by role="member" id="633">The Hon. A. KOUTSANTONIS (West Torrens—Treasurer, Minister for Finance, Minister for State Development, Minister for Mineral Resources and Energy) (14:31):</by>  That question makes no sense. APR can have sufficient storage on site to run these generators continuously. I doubt that they will operate them continuously. Ultimately, like you do with any other fuel source, you can have fuel sources shipped in, trucked in, brought in as needed to restock, to refuel to maintain continuous operation. I doubt very much that there would be any need for continuous operation.</text>
        <page num="12190" />
        <text id="20171116d13f15febf55481db0000480">Ultimately, we will make sure that we have sufficient reserves to make sure that we can maintain system security over the summer. It is much better to have state-owned generators as a supply backup rather than relying on the private sector. I do note the policy difference between the opposition and the government: the government wants a state-owned generator; the opposition want more privatisation.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>