<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2015-09-09" />
  <sessionName>Fifty-Third Parliament, Second Session (53-2)</sessionName>
  <parliamentNum>53</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="2367" />
  <endPage num="2455" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Question Time</name>
    <subject>
      <name>Electric Trains</name>
      <text id="20150909f2437858a3b44df390000547">
        <heading>Electric Trains</heading>
      </text>
      <talker role="member" id="4843" kind="question">
        <name>Mr WINGARD</name>
        <house>House of Assembly</house>
        <electorate id="">Mitchell</electorate>
        <questions>
          <question date="2015-09-09">
            <name>Electric Trains</name>
          </question>
        </questions>
        <startTime time="2015-09-09T15:03:36" />
        <text id="20150909f2437858a3b44df390000548">
          <timeStamp time="2015-09-09T15:03:36" />
          <by role="member" id="4843">Mr WINGARD (Mitchell) (15:03):</by>  My question is to the Minister for Transport and Infrastructure. Under the contract with Bombardier, when were all electric trains supposed to be supplied and fully operational?</text>
      </talker>
      <talker role="member" id="4842" kind="answer">
        <name>The Hon. S.C. MULLIGHAN</name>
        <house>House of Assembly</house>
        <electorate id="">Lee</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Transport and Infrastructure</name>
          </portfolio>
          <portfolio id="">
            <name>Minister Assisting the Minister for Planning</name>
          </portfolio>
          <portfolio id="">
            <name>Minister Assisting the Minister for Housing and Urban Development</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2015-09-09">
            <name>Electric Trains</name>
          </question>
        </questions>
        <startTime time="2015-09-09T15:03:54" />
        <text id="20150909f2437858a3b44df390000549">
          <timeStamp time="2015-09-09T15:03:54" />
          <by role="member" id="4842">The Hon. S.C. MULLIGHAN (Lee—Minister for Transport and Infrastructure, Minister Assisting the Minister for Planning, Minister Assisting the Minister for Housing and Urban Development) (15:03):</by>  I don't have that date in front of me, but I understood that we were expecting to receive those trains around about the middle of 2015. We are still receiving those trains. The vast majority of them are in service at the moment. We're still waiting to receive the final trains, but, pleasingly, as part of that program we've been able to substantially increase the size of the train fleet that we have servicing our metropolitan train lines.</text>
        <text id="20150909f2437858a3b44df390000550">I will check these figures and come back to the house with a correction but, from recollection, by purchasing these new 4000 class electric multiple unit trains, we are adding the equivalent of 66 rail carriages in 22 three-car sets through the new purchase and, as there was a fleeting reference amongst some of the unpleasantness yesterday, we are able to also retire the approximately 40-year-old 2000 class diesel trains.</text>
        <text id="20150909f2437858a3b44df390000551">Notwithstanding the retirement of those trains, there is still a significant increase in the size of the fleet, I understand from, I think, off the top of my head, 99 rail carriage equivalents up to 136, so we are growing the fleet by over a third. Once again, it is another reflection of how this government is working hard and investing resources to grow our public transport services, in particular the vehicles on which we provide those services.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>