<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2015-02-25" />
  <sessionName>Fifty-Third Parliament, Second Session (53-2)</sessionName>
  <parliamentNum>53</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="303" />
  <endPage num="375" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Parliamentary Committees</name>
    <subject>
      <name>Public Works Committee: North-South Corridor (Torrens Road to River Torrens)</name>
      <text id="201502259404c922fcb14a7a80000121">
        <heading>Public Works Committee: North-South Corridor (Torrens Road to River Torrens)</heading>
      </text>
      <talker role="member" id="4838" kind="speech">
        <name>Ms DIGANCE</name>
        <house>House of Assembly</house>
        <electorate id="">Elder</electorate>
        <startTime time="2015-02-25T11:56:27" />
        <text id="201502259404c922fcb14a7a80000122">
          <timeStamp time="2015-02-25T11:56:27" />
          <by role="member" id="4838">Ms DIGANCE (Elder) (11:56):</by>  I move:</text>
        <text id="201502259404c922fcb14a7a80000123">
          <inserted>That the 512<sup>th</sup> report of the committee, entitled North-South Corridor (Torrens Road to River Torrens), be noted.</inserted>
        </text>
        <text continued="true" id="201502259404c922fcb14a7a80000124">This proposal is one of a number of projects in the upgrade of this major Adelaide transport corridor. It will see the upgrade of South Road between Torrens Road and the River Torrens—a distance of 3.7 kilometres. Specifically, it includes:</text>
        <page num="314" />
        <text id="201502259404c922fcb14a7a80000125">
          <item sublevel="1" bullet="true">a 1.4 kilometre section of lowered road between Hythe Street at Ridleyton and Hindmarsh Avenue at West Hindmarsh;</item>
        </text>
        <text id="201502259404c922fcb14a7a80000126">
          <item sublevel="1" bullet="true">a 2.5 kilometre non-stop section of road (which includes the lowered road);</item>
        </text>
        <text id="201502259404c922fcb14a7a80000127">
          <item sublevel="1" bullet="true">a grade separation overpass of the Outer Harbour rail line; and</item>
        </text>
        <text id="201502259404c922fcb14a7a80000128">
          <item sublevel="1" bullet="true">upgrades to a number of key intersections.</item>
        </text>
        <text continued="true" id="201502259404c922fcb14a7a80000129">Preliminary works have already commenced, with the committee reporting to the house on those works in October 2013.</text>
        <text id="201502259404c922fcb14a7a80000130">The works for the upgrade which we are now considering will commence later this year with an aim of completing the major construction work in 2018 and other post-construction and maintenance works to be finalised in 2019.</text>
        <text id="201502259404c922fcb14a7a80000131">This is a jointly funded project between the state and federal governments with each contributing in equal proportions to the $896 million (GST exclusive) for the project. Given this, and pursuant to section 12C of the Parliamentary Committees Act 1991, the Public Works Committee reports to parliament that it recommends the proposed public works.</text>
        <text id="201502259404c922fcb14a7a80000132">Debate adjourned on motion of Mr Gardner.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>