<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2012-09-18" />
  <sessionName>Fifty-Second Parliament, Second Session (52-2)</sessionName>
  <parliamentNum>52</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="2895" />
  <endPage num="2995" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Answers to Questions</name>
    <subject>
      <name>Desalination Plant</name>
      <text id="201209184afb1cd3f95c43cf90000561">
        <heading>DESALINATION PLANT</heading>
      </text>
      <talker role="member" id="546" kind="question">
        <name>In reply to Mr WILLIAMS</name>
        <house>House of Assembly</house>
        <electorate id="">MacKillop</electorate>
        <portfolios>
          <portfolio id="">
            <name>Deputy Leader of the Opposition</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2012-09-18">
            <name>DESALINATION PLANT</name>
          </question>
        </questions>
        <text id="201209184afb1cd3f95c43cf90000562">In reply to <by role="member" id="546">Mr WILLIAMS (MacKillop—Deputy Leader of the Opposition)</by> (14 June 2012).</text>
      </talker>
      <talker role="member" id="1802" kind="answer">
        <name>The Hon. P. CAICA</name>
        <house>House of Assembly</house>
        <electorate id="">Colton</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Sustainability</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Water and the River Murray</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Aboriginal Affairs and Reconciliation</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2012-09-18">
            <name>DESALINATION PLANT</name>
          </question>
        </questions>
        <text id="201209184afb1cd3f95c43cf90000563">
          <by role="member" id="1802">The Hon. P. CAICA (Colton—Minister for Sustainability, Environment and Conservation, Minister for Water and the River Murray, Minister for Aboriginal Affairs and Reconciliation):</by>  I am advised:</text>
        <text id="201209184afb1cd3f95c43cf90000564">1.&amp;#x9;The first water milestone was achieved on 14 October 2011 and was certified by SA Water's representative on that date. Approximately $5.7 million (excluding GST) was paid from 8 July 2009 up to first water milestone.</text>
        <text id="201209184afb1cd3f95c43cf90000565">The payments made were for services rendered by the operator in accordance with the terms and conditions of the Operations &amp; Maintenance (O&amp;M) Contract and included:</text>
        <text id="201209184afb1cd3f95c43cf90000566">
          <item sublevel="1" bullet="true">Review and certification of the design, procurement and construction works and associated documentation.</item>
        </text>
        <text id="201209184afb1cd3f95c43cf90000567">
          <item sublevel="1" bullet="true">Oversight of commissioning and testing activities to ensure the warranties and obligations of the operator in the O&amp;M Contract are preserved.</item>
        </text>
        <text id="201209184afb1cd3f95c43cf90000568">
          <item sublevel="1" bullet="true">Preparation and implementation of preventative maintenance schedules and regimes throughout the completion phase to ensure the supplier warranties for critical elements are preserved.</item>
        </text>
        <text id="201209184afb1cd3f95c43cf90000569">
          <item sublevel="1" bullet="true">Review of relevant documentation and endorsement for certificate of attainment of first water, certificate of attainment of practical completion, certificate of attainment of project handover and registers of minor defects. </item>
        </text>
        <text continued="true" id="201209184afb1cd3f95c43cf90000570">In addition, a number of systems were progressively operated and maintained from March 2011, including seawater systems, pre-treatment systems, diffuser systems, chemical dosing and neutralisation systems, plant instrumentation and control systems and a range of building services and operations. The O&amp;M operator also operated the temporary desalination pilot plant for a period of 20 months from around April 2009.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>