<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2012-09-18" />
  <sessionName>Fifty-Second Parliament, Second Session (52-2)</sessionName>
  <parliamentNum>52</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="2895" />
  <endPage num="2995" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Answers to Questions</name>
    <subject>
      <name>Desalination Plant</name>
      <text id="20120918fa6c5c08e5ec4427a0000531">
        <heading>DESALINATION PLANT</heading>
      </text>
      <talker role="member" id="546" kind="question">
        <name>In reply to Mr WILLIAMS</name>
        <house>House of Assembly</house>
        <electorate id="">MacKillop</electorate>
        <portfolios>
          <portfolio id="">
            <name>Deputy Leader of the Opposition</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2012-09-18">
            <name>DESALINATION PLANT</name>
          </question>
        </questions>
        <text id="20120918fa6c5c08e5ec4427a0000532">In reply to <by role="member" id="546">Mr WILLIAMS (MacKillop—Deputy Leader of the Opposition) (1 December 2011) (First Session)</by></text>
      </talker>
      <talker role="member" id="1802" kind="answer">
        <name>The Hon. P. CAICA</name>
        <house>House of Assembly</house>
        <electorate id="">Colton</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Sustainability</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Water and the River Murray</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Aboriginal Affairs and Reconciliation</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2012-09-18">
            <name>DESALINATION PLANT</name>
          </question>
        </questions>
        <text id="20120918fa6c5c08e5ec4427a0000533">
          <by role="member" id="1802">The Hon. P. CAICA (Colton—Minister for Sustainability, Environment and Conservation, Minister for Water and the River Murray, Minister for Aboriginal Affairs and Reconciliation):</by>  I am advised:</text>
        <text id="20120918fa6c5c08e5ec4427a0000534">1.&amp;#x9;The Design Build Operate and Maintain Contract was awarded to AdelaideAqua on 16 February 2009. The Contractor, AdelaideAqua, commenced construction on site in April 2009. The Operations and Maintenance Contract includes provision for the Operator, AdelaideAqua Pty Ltd, to receive payment for each megalitre of drinking water produced from the Adelaide desalination plant after the First Water delivery milestone. AdelaideAqua achieved the First Water delivery milestone on 21 October 2011 and SA Water will continue to pay for drinking water produced by the Operator.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>