<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2012-03-29" />
  <sessionName>Fifty-Second Parliament, Second Session (52-2)</sessionName>
  <parliamentNum>52</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="965" />
  <endPage num="1016" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Question Time</name>
    <subject>
      <name>Gawler Rail Line</name>
      <text id="2012032995da7e71a49841b990000477">
        <heading>GAWLER RAIL LINE</heading>
      </text>
      <talker role="member" id="3123" kind="question">
        <name>Mr PICCOLO</name>
        <house>House of Assembly</house>
        <electorate id="">Light</electorate>
        <questions>
          <question date="2012-03-29">
            <name>GAWLER RAIL LINE</name>
          </question>
        </questions>
        <startTime time="2012-03-29T14:19:00" />
        <text id="2012032995da7e71a49841b990000478">
          <timeStamp time="2012-03-29T14:19:00" />
          <by role="member" id="3123">Mr PICCOLO (Light) (14:19):</by>  My question is to the Minister for Transport Services. Can the minister inform the house about the reopening of the Gawler line?</text>
      </talker>
      <talker role="member" id="3115" kind="answer">
        <name>The Hon. C.C. FOX</name>
        <house>House of Assembly</house>
        <electorate id="">Bright</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Transport Services</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2012-03-29">
            <name>GAWLER RAIL LINE</name>
          </question>
        </questions>
        <startTime time="2012-03-29T14:19:00" />
        <text id="2012032995da7e71a49841b990000479">
          <timeStamp time="2012-03-29T14:19:00" />
          <by role="member" id="3115">The Hon. C.C. FOX (Bright—Minister for Transport Services) (14:19):</by>  I thank the member for this question. The state government has been electrifying our rail network as part of a $2.6 billion investment in public transport over 10 years. In preparation for that electrification, obviously we needed to shut some lines. Stage 2 of the Gawler line track upgrade began some six months ago and it has now been finished.</text>
        <text id="2012032995da7e71a49841b990000480">A fortnight ago I informed the house that passenger train services would resume in two stages and, as a result, the Gawler line opened on Sunday 18 March. The entire line is about to open between Adelaide Railway Station and Gawler Central—and I am sure the member for Light will be very pleased about this because it is his own personal line, as far as I can tell; he spends most of his life on it—this Saturday afternoon on a limited basis and entirely from Sunday onwards.</text>
        <text id="2012032995da7e71a49841b990000481">The opening of this line represents a great deal of hard work and a great deal of patience from the local community. During the line closure, the department used the opportunity to upgrade a number of stations, including the construction of two new stations at Elizabeth and Munno Para.</text>
        <text id="2012032995da7e71a49841b990000482">Chidda, Evanston, Elizabeth South and Gawler stations were upgraded with new platform services, improved lighting, passenger information and easier access for customers. I know that there was a great deal of inconvenience for commuters during this time. I apologise to them and thank them for their patience. I am very pleased that this line is reopening.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>