<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2012-03-14" />
  <sessionName>Fifty-Second Parliament, Second Session (52-2)</sessionName>
  <parliamentNum>52</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="595" />
  <endPage num="728" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding>
    <name>Ministerial Statement</name>
    <text id="201203143b735e5599244f5190000316">
      <heading>Ministerial Statement</heading>
    </text>
    <subject>
      <name>Royal Adelaide Hospital</name>
      <text id="201203143b735e5599244f5190000317">
        <heading>ROYAL ADELAIDE HOSPITAL</heading>
      </text>
      <talker role="member" id="535" kind="speech">
        <name>The Hon. J.D. HILL</name>
        <house>House of Assembly</house>
        <electorate id="">Kaurna</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Health and Ageing</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Mental Health and Substance Abuse</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for the Arts</name>
          </portfolio>
        </portfolios>
        <startTime time="2012-03-14T14:01:00" />
        <text id="201203143b735e5599244f5190000318">
          <timeStamp time="2012-03-14T14:01:00" />
          <by role="member" id="535">The Hon. J.D. HILL (Kaurna—Minister for Health and Ageing, Minister for Mental Health and Substance Abuse, Minister for the Arts) (14:01):</by>  I seek leave to make a ministerial statement.</text>
        <text id="201203143b735e5599244f5190000319">Leave granted.</text>
      </talker>
      <talker role="member" id="535" kind="speech" continued="true">
        <name>The Hon. J.D. HILL</name>
        <house>House of Assembly</house>
        <page num="621" />
        <text id="201203143b735e5599244f5190000320">
          <by role="member" id="535">The Hon. J.D. HILL:</by>  The ministerial statement, for the benefit of the house, is about the remediation of the new RAH site. I have been asked a number of questions about it both here and by the media, so I thought I would take the opportunity to give a detailed explanation as to what is happening.</text>
        <text id="201203143b735e5599244f5190000321">Remediating the site is part of the construction contract for the new hospital. SA Health Partnership has a contract with Hansen Yuncken Leighton Contractors Joint Venture (HYLC) to design and construct the hospital. HYLC has in turn subcontracted elements of the remediation process to a number of specialist firms. Financial details of subcontracts are commercial-in-confidence.</text>
        <text id="201203143b735e5599244f5190000322">However, I can report that an estimated total of 462,000 tonnes of soil will be removed from the new RAH site. As at the end of February 2012, about 55 per cent or just over half the soil—that is, 257,200 tonnes—has been removed from the site. This is the critical bit: upon leaving the site, the soil was classified by those who were responsible for removing it.</text>
        <text id="201203143b735e5599244f5190000323">On leaving the site, 76,700 tonnes was classified as waste landfill; 29,900 tonnes was classified as intermediate landfill cover; 115,800 tonnes was low-level contaminated waste; and there is also 34,800 tonnes of what was suspected to be high-level contaminated waste, which is an informal term—the technical term for that is above low-level contaminated waste.</text>
        <text id="201203143b735e5599244f5190000324">The rest of the soil is expected to be removed by late 2012 and is anticipated to be classified as either intermediate landfill cover or waste fill. The figures I have given are in tonnes, although under some of the specifications you will see the amount given in cubic metres, but I have used tonnes today just to be consistent.</text>
        <text id="201203143b735e5599244f5190000325">The tonne to cubic metre conversion rate does vary depending on the density of the material and how wet it is and so on. As a general rule, as many would know, it is about 2:1—so, two tonnes to every cubic metre. Waste fill and intermediate landfill cover are taken straight off the new RAH site in accordance with EPA guidelines to other sites either for landfill or for re-use.</text>
        <text id="201203143b735e5599244f5190000326">Low-level contaminated waste is taken to a Southern Resource Co engineered landfill site in southern Adelaide. Suspected high-level waste is also taken to a Southern Resource Co facility in southern Adelaide. High-level waste is from hotspots of contamination. I visited the site last week and I was advised that there are currently 19 hot spots.</text>
        <text id="201203143b735e5599244f5190000327">Using a cautious approach, suspected high-level waste is taken to a licensed landfill site where it is held in temporary storage so it can be further tested to confirm if it is in fact high-level waste and, if it is, if required, treatment via bioremediation, chemical fixation/stabilisation process applies. Testing has found so far that no soil from the site has been classified as high-level contaminated waste—</text>
        <text id="201203143b735e5599244f5190000328">
          <event kind="interjection" role="member" id="5">Members interjecting:</event>
        </text>
      </talker>
      <talker role="member" id="619">
        <name>The Speaker</name>
        <house>House of Assembly</house>
        <text id="201203143b735e5599244f5190000329">
          <by role="member" id="619">The SPEAKER:  </by>Order!</text>
      </talker>
      <talker role="member" id="535">
        <name>The Hon. J.D. HILL</name>
        <house>House of Assembly</house>
        <text id="201203143b735e5599244f5190000330">
          <by role="member" id="535">The Hon. J.D. HILL:</by>  Madam Speaker, I come in here with all of the facts about the case. If they have evidence that is contrary to this, they should demonstrate it.</text>
        <text id="201203143b735e5599244f5190000331">
          <event kind="interjection" role="member" id="5">Members interjecting:</event>
        </text>
      </talker>
      <talker role="member" id="619">
        <name>The Speaker</name>
        <house>House of Assembly</house>
        <text id="201203143b735e5599244f5190000332">
          <by role="member" id="619">The SPEAKER:  </by>Order!</text>
      </talker>
      <talker role="member" id="535">
        <name>The Hon. J.D. HILL</name>
        <house>House of Assembly</house>
        <text id="201203143b735e5599244f5190000333">
          <by role="member" id="535">The Hon. J.D. HILL:</by>  The facts are, as I said, that testing has found that so far no soil from the site has been classified as high-level contaminated waste and, therefore, can be disposed of to landfill without treatment. The remediation process is overseen by an independent environmental site auditor, who is licensed by the EPA and appointed by the state. The EPA also has done some testing to ensure that the process they have used is correct, I am advised by the EPA.</text>
        <text id="201203143b735e5599244f5190000334">SA Health Partnership takes the risk of the cost of remediating any known contamination, that is contamination that was in existence prior to 20 May—</text>
      </talker>
      <talker role="member" id="631" kind="interjection">
        <name>Mr Hamilton-Smith</name>
        <house>House of Assembly</house>
        <text id="201203143b735e5599244f5190000335">
          <by role="member" id="631">Mr Hamilton-Smith:</by>  There isn't any; it's gone by magic.</text>
      </talker>
      <talker role="member" id="619">
        <name>The Speaker</name>
        <house>House of Assembly</house>
        <text id="201203143b735e5599244f5190000336">
          <by role="member" id="619">The SPEAKER:  </by>Order, the member for Waite!</text>
      </talker>
      <talker role="member" id="535">
        <name>The Hon. J.D. HILL</name>
        <house>House of Assembly</house>
        <page num="622" />
        <text id="201203143b735e5599244f5190000337">
          <by role="member" id="535">The Hon. J.D. HILL:</by>  That is, contamination that was in existence prior to 20 May 2011, as identified in the state's extensive on-site remediation investigations. These costs are within the SA Health Partnership's $1.85 billion design and construction costs. The state takes 80 per cent of the cost of remediating additional unknown contamination, that is contamination that is not foreseen from the extensive on-site remediation investigations undertaken by the state. SA Health Partnership takes the remaining 20 per cent of the cost of remediating unknown contamination, which should incentivise SA Health Partnerships to minimise the cost of conducting such works.</text>
        <text id="201203143b735e5599244f5190000338">Any claim arising regarding remediation will be assessed at the end of the remediation process on what is known as an 'open book' basis, when all information related to remediation of the site is available. So, in order for the state to pay extra, it has to be demonstrated that it was unforeseen and that there is an additional cost. The contractual arrangements are clear and are available on the state procurement website.</text>
        <text id="201203143b735e5599244f5190000339">At the completion of all remediation work an audit report is required from the independent environmental auditor certifying that the site has been remediated to the extent necessary for a hospital. It is the responsibility of SA Health Partnership to obtain this approval.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>