<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="4.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2008-02-28T00:00:00+10:30" />
  <sessionName>Fifty-First Parliament, Second Session (51-2)</sessionName>
  <parliamentNum>51</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="2257" />
  <endPage num="2341" />
  <dateModified time="2023-06-16T13:51:53+09:30" />
  <proceeding continued="true">
    <name>Answers to Questions</name>
    <subject>
      <name>Road Maintenance, Davenport Electorate</name>
      <text id="20080228262ee437f08c4090a0000437">
        <heading>ROAD MAINTENANCE, DAVENPORT ELECTORATE</heading>
      </text>
      <talker role="member" id="563" kind="question">
        <name>The Hon. I.F. EVANS</name>
        <house>House of Assembly</house>
        <electorate id="">Davenport</electorate>
        <questions>
          <question date="2007-10-30" qonNum="296">
            <name>ROAD MAINTENANCE, DAVENPORT ELECTORATE</name>
          </question>
        </questions>
        <text id="20080228262ee437f08c4090a0000438">296 <by role="member" id="563">The Hon. I.F. EVANS (Davenport)</by> (30 October 2007).</text>
        <text id="20080228262ee437f08c4090a0000439">1.&amp;#x9;What is the most current cost estimate to construct one more lanes on Taylors Road between Blythewood Roundabout and Fullarton Road?</text>
        <text id="20080228262ee437f08c4090a0000440">2.&amp;#x9;What is the most current cost estimate to construct a pedestrian crossing across Main Road, Blackwood?</text>
        <text id="20080228262ee437f08c4090a0000441">3.&amp;#x9;What is the most current cost estimate to construct a one lane bypass road, between Blackwood Railway Crossing and Glenalta Railway Crossing, adjacent to the railway line?</text>
        <text id="20080228262ee437f08c4090a0000442">4.&amp;#x9;What proposals are being considered to improve the Blackwood Roundabout and for each proposal what is the correct cost estimate?</text>
        <text id="20080228262ee437f08c4090a0000443">5.&amp;#x9;What proposals are being considered to improve the junction of Old Belair Road and James Road, Belair and for each proposal what is the current cost estimate?</text>
      </talker>
      <talker role="member" id="526" kind="answer">
        <name>The Hon. P.F. CONLON</name>
        <house>House of Assembly</house>
        <electorate id="">Elder</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Transport</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Infrastructure</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Energy</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2007-10-30" qonNum="296">
            <name>ROAD MAINTENANCE, DAVENPORT ELECTORATE</name>
          </question>
        </questions>
        <text id="20080228262ee437f08c4090a0000444">
          <by role="member" id="526">The Hon. P.F. CONLON (Elder—Minister for Transport, Minister for Infrastructure, Minister for Energy):</by>  I provide the following information:</text>
        <text id="20080228262ee437f08c4090a0000445">i.&amp;#x9;The Department for Transport, Energy and Infrastructure has advised me that no cost estimates have been developed or are currently being undertaken into this option at this time.</text>
        <page num="2288" />
        <text id="20080228262ee437f08c4090a0000446">ii.&amp;#x9;The installation of a pedestrian actuated crossing on Main Road at Blackwood was considered as part of The Road Management Plan for Main Road from Belair to Blackwood (RMP) but was not a recommendation, therefore a design has not been prepared and consequently a current cost estimate is not available.</text>
        <text id="20080228262ee437f08c4090a0000447">iii.&amp;#x9;Some very preliminary costing was undertaken that indicated a potential cost in the order of $25 to $30 million (2005 dollars). A detailed estimation was not pursued due to the unfeasible nature of the project.</text>
        <text id="20080228262ee437f08c4090a0000448">iv.&amp;#x9;Improvements being considered at the Blackwood roundabout as part of the Road Management Plan include:</text>
        <text id="20080228262ee437f08c4090a0000449">
          <item sublevel="1" bullet="true">A minor increase in the size of the roundabout.</item>
        </text>
        <text id="20080228262ee437f08c4090a0000450">
          <item sublevel="1" bullet="true">Closing entry to the roundabout from Station Road.</item>
        </text>
        <text id="20080228262ee437f08c4090a0000451">
          <item sublevel="1" bullet="true">A parking ban in front of the Post Office.</item>
        </text>
        <text id="20080228262ee437f08c4090a0000452">
          <item sublevel="1" bullet="true">A parking ban on Main Road on the southern approach to the roundabout.</item>
        </text>
        <text id="20080228262ee437f08c4090a0000453">
          <item sublevel="1" bullet="true">Widening the median on Main Road on the southern approach to the roundabout.</item>
        </text>
        <text id="20080228262ee437f08c4090a0000454">
          <item sublevel="1" bullet="true">Upgrade of directional signage.</item>
        </text>
        <text id="20080228262ee437f08c4090a0000455">Detailed design for these improvements has not been completed at this stage. There is therefore no current detailed cost estimates available.</text>
        <text id="20080228262ee437f08c4090a0000456">v.&amp;#x9;There are no projects being considered.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>