<!--The Official Report of Parliamentary Debates (Hansard) of the Legislative Council and the House of Assembly of the Parliament of South Australia are covered by parliamentary privilege. Republication by others is not afforded the same protection and may result in exposure to legal liability if the material is defamatory. You may copy and make use of excerpts of proceedings where (1) you attribute the Parliament as the source, (2) you assume the risk of liability if the manner of your use is defamatory, (3) you do not use the material for the purpose of advertising, satire or ridicule, or to misrepresent members of Parliament, and (4) your use of the extracts is fair, accurate and not misleading. Copyright in the Official Report of Parliamentary Debates is held by the Attorney-General of South Australia.-->
<hansard id="" tocId="" xml:lang="EN-AU" schemaVersion="1.0" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xml="http://www.w3.org/XML/1998/namespace" xmlns:xsi="http://www.w3.org/2007/XMLSchema-instance" xmlns:mml="http://www.w3.org/1998/Math/MathML" xsi:noNamespaceSchemaLocation="hansard_1_0.xsd">
  <name>House of Assembly</name>
  <date date="2007-11-13" />
  <sessionName>Fifty-First Parliament, Second Session (51-2)</sessionName>
  <parliamentNum>51</parliamentNum>
  <sessionNum>2</sessionNum>
  <parliamentName>Parliament of South Australia</parliamentName>
  <house>House of Assembly</house>
  <venue></venue>
  <reviewStage>published</reviewStage>
  <startPage num="1481" />
  <endPage num="1570" />
  <dateModified time="2022-08-06T14:30:00+00:00" />
  <proceeding continued="true">
    <name>Answers to Questions</name>
    <subject>
      <name>Flood Damaged Roads</name>
      <page num="1505" />
      <text id="20071113e8dd30124f11437780000265">
        <heading>FLOOD DAMAGED ROADS</heading>
      </text>
      <talker role="member" id="1807" kind="question">
        <name>Dr McFETRIDGE</name>
        <house>House of Assembly</house>
        <electorate id="">Morphett</electorate>
        <questions>
          <question date="2007-07-31" qonNum="100">
            <name>FLOOD DAMAGED ROADS</name>
          </question>
        </questions>
        <text id="20071113e8dd30124f11437780000266">100 <by role="member" id="1807">Dr McFETRIDGE (Morphett)</by> (31 July 2007).  How will the $23.5 million committed to repairing flood damaged roads be spent in 2007-08 and what repairs have already occurred as a result of the $6 million already spent in 2006-07?</text>
      </talker>
      <talker role="member" id="526" kind="answer">
        <name>The Hon. P.F. CONLON</name>
        <house>House of Assembly</house>
        <electorate id="">Elder</electorate>
        <portfolios>
          <portfolio id="">
            <name>Minister for Transport</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Infrastructure</name>
          </portfolio>
          <portfolio id="">
            <name>Minister for Energy</name>
          </portfolio>
        </portfolios>
        <questions>
          <question date="2007-07-31" qonNum="100">
            <name>FLOOD DAMAGED ROADS</name>
          </question>
        </questions>
        <text id="20071113e8dd30124f11437780000267">
          <by role="member" id="526">The Hon. P.F. CONLON (Elder—Minister for Transport, Minister for Infrastructure, Minister for Energy):</by>  I provide the following information:</text>
        <text id="20071113e8dd30124f11437780000268">During 2007-08, the Department for Transport, Energy and Infrastructure (DTEI) intends to undertake the following works:</text>
        <text id="20071113e8dd30124f11437780000269">On the Sealed Road Network</text>
        <text id="20071113e8dd30124f11437780000270">
          <item sublevel="1" bullet="true">Construction of four new major floodways to replace those lost around Hawker.</item>
        </text>
        <text id="20071113e8dd30124f11437780000271">
          <item sublevel="1" bullet="true">Continue to repair damage caused to floodways and repair shoulder scouring and damage across the road network.</item>
        </text>
        <text id="20071113e8dd30124f11437780000272">
          <item sublevel="1" bullet="true">Continue to repair scours to sides of creeks and levee banks and install scour protection in the form of large rocks.</item>
        </text>
        <text id="20071113e8dd30124f11437780000273">
          <item sublevel="1" bullet="true">Continue to repair scour damage around culverts and undertake scour repairs around bridge structures.</item>
        </text>
        <text id="20071113e8dd30124f11437780000274">
          <item sublevel="1" bullet="true">Stabilise remaining sections of road pavement that were weakened due to water infiltration.</item>
        </text>
        <text id="20071113e8dd30124f11437780000275">Unsealed Road Network</text>
        <text id="20071113e8dd30124f11437780000276">
          <item sublevel="1" bullet="true">Undertake stabilisation works at unsealed floodways and scour repairs to side drains where they match into creek alignments at floodways.</item>
        </text>
        <text id="20071113e8dd30124f11437780000277">
          <item sublevel="1" bullet="true">Replace rubble on unsealed roads washed away during the event.</item>
        </text>
        <text id="20071113e8dd30124f11437780000278">
          <item sublevel="1" bullet="true">Repair scour damage around culverts, grids and in creeks using large rocks and concrete.</item>
        </text>
        <text id="20071113e8dd30124f11437780000279">
          <item sublevel="1" bullet="true">Remove silt build-up around creeks and floodways.</item>
        </text>
        <text id="20071113e8dd30124f11437780000280">DTEI will continue to monitor the progress of the works against the budget allocation.</text>
        <text id="20071113e8dd30124f11437780000281">To date, DTEI has undertaken $6.4 million in repair works. The following is a brief summary of the current status of the works program.</text>
        <text id="20071113e8dd30124f11437780000282">Sealed Road Network</text>
        <text id="20071113e8dd30124f11437780000283">Floodways—major damage</text>
        <text id="20071113e8dd30124f11437780000284">Significant damage was caused to four floodways:</text>
        <text id="20071113e8dd30124f11437780000285">
          <item sublevel="1" bullet="true">Hawker—Orroroo Road, at Yanyarrie Creek and Wirreanda Creek (Cradock)</item>
        </text>
        <text id="20071113e8dd30124f11437780000286">
          <item sublevel="1" bullet="true">Wilpena—Hawker Road, at the Wonoka Creek and 1km north of the Hawker Airstrip</item>
        </text>
        <text id="20071113e8dd30124f11437780000287">Demolition works and construction of temporary detours have been completed. A detailed drainage assessment has been undertaken by an independent expert and the designs for replacement structures are due in August 2007.</text>
        <text id="20071113e8dd30124f11437780000288">Floodways—minor damage</text>
        <text id="20071113e8dd30124f11437780000289">Damage to varying degrees was incurred to the majority of floodways in the Flinders Area, in particular on the Leigh Creek-Hawker Road, Wilpena-Hawker Road and Hawker Orroroo Road. In February 2007, work crews commenced repairs, mostly scour and concrete repairs and it is estimated that it will take 12 months to complete these works.</text>
        <text id="20071113e8dd30124f11437780000290">Shoulder Scour—major damage</text>
        <page num="1506" />
        <text id="20071113e8dd30124f11437780000291">Major scour damage incurred to shoulders across the road network, with sections up to 0.6 metres deep washed away. The majority of damage occurred on the Eyre Highway, Stuart Highway, Lincoln Highway, Iron Knob-Whyalla Road, Leigh Creek-Stirling North Road, Wilpena-Hawker Road and Hawker-Orroroo Road. Major repairs on these roads have been completed.</text>
        <text id="20071113e8dd30124f11437780000292">Shoulder Scour—minor damage</text>
        <text id="20071113e8dd30124f11437780000293">Minor scour damage incurred in hundreds of locations across the network; work crews are systematically working through roads to undertake repairs.</text>
        <text id="20071113e8dd30124f11437780000294">Scour to road embankments</text>
        <text id="20071113e8dd30124f11437780000295">Significant scour incurred to large road embankments on Stuart Highway and Roxby Downs-Pimba Road. The majority of these repairs have been completed.</text>
        <text id="20071113e8dd30124f11437780000296">Scour to sides of creeks and levee banks</text>
        <text id="20071113e8dd30124f11437780000297">Significant scour damage was incurred along the edges of creeks and existing levee banks, due to the high intensity and velocity of the creek flows, particularly along the Leigh Creek-Stirling North Road and Hawker-Orroroo Road. In a number of locations the extent of scour was such that it impacted the integrity of the adjacent road. Work is underway to reshape these areas, install a protective fabric and place large rocks, in excess of 0.7 metres in diameter. This work will reinstate the shape of the creek edge or levee bank and provide a protective barrier against future scour in these areas. Work is continuing.</text>
        <text id="20071113e8dd30124f11437780000298">Scour around culverts</text>
        <text id="20071113e8dd30124f11437780000299">Scour occurred around many culverts in the Flinders Ranges area. A small work crew is systematically working across the network to undertake repairs.</text>
        <text id="20071113e8dd30124f11437780000300">Weakened Road Pavements</text>
        <text id="20071113e8dd30124f11437780000301">A number of sections of road pavement were weakened due to water infiltration. A one kilometre section of the Hawker-Orroroo Road has been stabilised using cement and resealed. Other sections will be addressed during 2007-08.</text>
        <text id="20071113e8dd30124f11437780000302">Unsealed Roads</text>
        <text id="20071113e8dd30124f11437780000303">DTEI's work crews moved across the unsealed road network and made temporary repairs to scours in the road pavements and unsealed floodways to allow access to remote communities.</text>
        <text id="20071113e8dd30124f11437780000304">Work crews have now commenced undertaking final repairs, which include replacing sheeting material on roads where it was washed away, repairing and stabilising floodways and undertaking repairs to side drains that were badly scoured. Repairs to road embankments and the sides of creeks using large rock as detailed above is also being undertaken.</text>
      </talker>
    </subject>
  </proceeding>
</hansard>